Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005)
ML24228A049
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/15/2024
From: Greg Werner
NRC/RGN-IV/DORS/PBB
To: Peters K
Vistra Operations Company
References
IR 2024005
Download: ML24228A049 (1)


Text

August 15, 2024

SUBJECT:

UPDATED INSPECTION PLAN FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2024005 AND 05000446/2024005)

Dear Ken Peters:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system ADAMS, which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact David Proulx at (817) 200-1561 with any questions you have regarding this letter.

Sincerely, Gregory E. Werner, Chief Reactor Projects Branch B Division of Operating Reactor Safety Signed by Werner, Gregory on 08/15/24 UPDATED INSPECTION PLAN FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2024005 AND 05000446/2024005) - DATED AUGUST 15, 2024 Docket Nos. 50-445; 50-446; 07200074 License Nos. NPF-87; NPF-89 Enclosure: Inspection Plan cc w/ encl: Distribution via LISTSERV

ML24228A049 SUNSI Review By: PON ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE SPE: DORS/B BC: DORS/B NAME DProulx GWerner SIGNATURE

/RA/

/RA/

DATE 08/01/24 08/15/24

Site Inspection Activity Plan 07200074 - Comanche Peak (ISFSI)

07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection (IP 81311)

9/9/2024 9/13/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/13/2024 1:45:04 PM 1 of 3

Site Inspection Activity Plan Comanche Peak 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count CP 2024 BRQ

1,2 8/18/2024 8/24/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)

1,2 9/9/2024 9/13/2024 IP 71130.02 000734 Access Control 1,2 9/9/2024 9/13/2024 IP 71130.09 001656 Security Plan Changes 1,2 9/9/2024 9/13/2024 IP 71151 001338 Performance Indicator Verification EP Program & PI Inspection (2024) - CP

1,2 9/23/2024 9/27/2024 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/23/2024 9/27/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/23/2024 9/27/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/23/2024 9/27/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/23/2024 9/27/2024 IP 71151 001397 Performance Indicator Verification CP 2024 INITIAL EXAM

1,2 9/15/2024 9/21/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 10/20/2024 10/26/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection-CP (U2)

2 10/21/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI

1,2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/21/2024 10/25/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification Comprehensive Engineering Team Inspection - Comanche Peak

1,2 1/27/2025 1/31/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 2/10/2025 2/14/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Inservice Inspection - CP (U1)

1 4/28/2025 5/9/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - CP

1,2 4/28/2025 5/2/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/28/2025 5/2/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 4/28/2025 5/2/2025 IP 71151 000746 Performance Indicator Verification CP 2025 INITIAL EXAM

1,2 6/8/2025 6/14/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 7/20/2025 8/2/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Prepared on 8/13/2024 1:45:04 PM 2 of 3

Site Inspection Activity Plan EP 2025 Biennial Exercise & PI Inspection

1,2 8/11/2025 8/15/2025 IP 71114.01 000716 Exercise Evaluation 1,2 8/11/2025 8/15/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/11/2025 8/15/2025 IP 71151 001397 Performance Indicator Verification CP 2025 Biennial PI&R

1,2 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)

1,2 10/6/2025 10/10/2025 IP 71130.02 000734 Access Control 1,2 10/6/2025 10/10/2025 IP 71130.09 001656 Security Plan Changes 1,2 10/6/2025 10/10/2025 IP 71151 001338 Performance Indicator Verification Cyber Security Inspection-CP

1,2 10/26/2025 11/1/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP

1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 11/17/2025 11/21/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing CP 2026 INITIAL EXAM

1,2 2/22/2026 3/28/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 3/29/2026 4/4/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Age-Related Degradation Inspection - Comanche Peak

1,2 3/23/2026 3/27/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 4/6/2026 4/10/2026 IP 71111.21N.04 001832 Age-Related Degradation Inservice Inspection - CP (U2)

2 4/27/2026 5/1/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-1,3,PI - CP

1,2 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/27/2026 5/1/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 4/27/2026 5/1/2026 IP 71151 000746 Performance Indicator Verification Prepared on 8/13/2024 1:45:04 PM 3 of 3