IR 05000445/2024403
| ML24193A215 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/16/2024 |
| From: | Ray Kellar NRC/RGN-IV/DRSS/PSB |
| To: | Peters K Vistra Operations Company |
| References | |
| IR 2024403 | |
| Download: ML24193A215 (7) | |
Text
July 16, 2024
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000445/2024403 AND 05000446/2024403
Dear Ken Peters:
On June 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2. On June 26, 2024, the NRC inspectors discussed the results of this inspection with Steven Sewell, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000445, 05000446 License Nos. NPF-87, NPF-89
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000445 and 05000446
License Numbers:
Report Numbers:
05000445/2024403 and 05000446/2024403
Enterprise Identifier:
I-2024-403-0002
Licensee:
Vistra Operations Company LLC
Facility:
Comanche Peak Nuclear Power Plant, Units 1 and 2
Location:
Glen Rose, TX
Inspection Dates:
June 17, 2024 to June 21, 2024
Inspectors:
C. Jewett, Senior Physical Security Inspector
R. Lanfear, Physical Security Inspector
J. Rollins, Senior Security Specialist
Approved By:
Ray L. Kellar, P.E., Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following
procedure elements: Protective Strategy Evaluation
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements (2)
- Performance Evaluation Program: Inspectors observed a licensee conducted annual force-on-force exercise on June 20, 2024
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the Security Target Set Program. The following elements were evaluated:
Review of Power Reactor Target Sets
(1)
- All Requirements
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 26, 2024, the inspectors presented the security baseline inspection results to Steven Sewell and other members of the licensees staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
TR 2024-000002,
TR 2024-001742,
TR-2022-001235,
TR-2023-002840,
TR-2023-005538,
TR-2024-001714,
TR-2024-003452
Comanche Peak Unit 1 & unit 2, Security Plan, Training and
Qualification Plan, Safeguards Contingency Plan,
Independent Spent Fuel Storage Installation Plan
Miscellaneous
SC21.ADV.BS1
Adversary Training
09/19/2019
Timelines
Safety -Security Interface Review and Evaluation
Protective Strategy and Target Set Development
SI 1.1
Security Supervisor
SI 3.5
Protected Area and Vital Area Patrols
Procedures
STA 911
Behavioral Observation Program
Corrective Action
Documents
TR-2023-008482,
TR-2024-003038
Self-Assessments
TR#2024-002147
TSAT Review
04/04/2024