IR 05000445/2024002

From kanterella
Jump to navigation Jump to search
Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001
ML24208A053
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/2024
From: Greg Werner
NRC/RGN-IV/DORS/PBB
To: Peters K
Vistra Operations Company
Proulx D
References
IR 2024001, IR 2024002
Download: ML24208A053 (13)


Text

July 31, 2024

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION - INTEGRATED INSPECTION REPORT 05000445/2024002, 05000446/2024002, AND 07200074/2024001

Dear Ken Peters:

On June 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2. On July 11, 2024, the NRC inspectors discussed the results of this inspection with Steven Sewell, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gregory E. Werner, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket Nos. 05000445, 05000446, 07200074 License Nos. NPF-87, NPF-89

Enclosure:

As stated

Inspection Report

Docket Nos.

05000445, 05000446, and 07200074

License Nos.

NPF-87 and NPF-89

Report Nos.

05000445/2024002, 05000446/2024002, and 07200074/2024001

Enterprise Identifier:

I-2024-002-0010 and I-2024-001-0013

Licensee:

Vistra Operations Company, LLC

Facility:

Comanche Peak Nuclear Power Plant, Units 1 and 2, and Independent

Spent Fuel Storage Installation

Location:

Glen Rose, TX 76043

Inspection Dates:

April 1, 2024, to June 30, 2024

Inspectors:

L. Brookhart, Senior Spent Fuel Storage Inspector

J. Ellegood, Senior Resident Inspector

J. Freeman, Spent Fuel Storage Inspector

N. Greene, Senior Health Physicist

R. Kopriva, Senior Project Engineer

H. Strittmatter, Resident Inspector

Approved By:

Gregory E. Werner, Chief

Reactor Projects Branch B

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Comanche Peak Nuclear Power Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at or near 100 percent power. On May 10, 2024, Unit 1 was shut down for a planned maintenance outage on both main feedwater pumps. On May 16, 2024, the licensee restarted Unit 1 and reached 100 percent power on May 17, 2024. Unit 2 operated at or near 100 percent power for the rest of the inspection period.

Unit 2 remained at or near 100 percent power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of summer for the following systems:
  • on site transformers on June 10, 2024
  • pre-staged temporary air conditioning units on June 13, 2024

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, auxiliary feedwater on May 3, 2024
(2) Unit 1, train B component cooling water on May 21, 2024
(3) Unit 1, turbine driven auxiliary feedwater pump on June 7, 2024 (4)interim spent fuel storage facility on June 18, 2024

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)fuel handling building, 810' elevation on June 12, 2024 (2)fuel handling building, 838' - 9" elevation on June 21, 2024 (3)fuel handling building, 841' elevation on June 21, 2024 (4)fuel handling building, 860' elevation on June 21, 2024 (5)electrical and control building, 778' elevation on June 27, 2024

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding in the Units 1 and 2 electrical equipment rooms, 1-096 and 2-096.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during reactor start-up on May 16, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance during a simulator training session on steam generator tube leaks on May 8, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 1, anticipated transients without scram mitigation system actuation circuitry related failures on July 31, and November 3, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2, station transformer 2ST outage on April 10, 2024
(2) Unit 2, main feed pump servo filter swap and replacement on April 18, 2024
(3) Unit 1, unplanned 1-06 safety chiller outrage on April 23, 2024
(4) Unit 1, train B component cooling water outage on May 20, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1, train B containment spray with incorrect valve stroke time
(2) Unit 1, failed bolt on the 1-01 emergency diesel generator fuel line.
(3) Unit 1, ceiling cracks in safeguards building, TR-2024-002145
(4) Unit 1, safety function of remote shutdown panel with gamma metrics nuclear instrument not re-energizing
(5) Units 1 and 2, safety chillers with modified filters
(6) Unit 1, pressurizer spray valve with leak at flange
(7) Unit 2, containment spray pump 2-02 inboard pump seal leak, condition report 2023-003460

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated a planned Unit 1 maintenance outage to install a design modification on the main feed pumps. The outage took place from May 10 to 17, 2024.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1) Unit 2, containment spray chemical addition tank discharge valve 4755 periodic inspection and lubrication on May 7, 2024
(2) Unit 2, train B air receiver on May 22, 2024
(3) Unit 1, residual heat removal flow switch calibration on May 23, 2024

Surveillance Testing (IP Section 03.01) (2 Samples)

(1) Unit 1, OPT-216A, train A 6.9KV electrical remote shutdown operability test on April 5, 2024.
(2) Unit 1, boric acid walkdown on May 13, 2024

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 1, train B residual heat removal pump test on May 2, 2024

71114.06 - Drill Evaluation

Additional Drill and/or Training Evolution (1 Sample)

The inspectors evaluated:

(1) a limited participation drill on April 3,

RADIATION SAFETY

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Shipment Preparation (IP Section 03.04)

(1) The inspectors observed the preparation of radioactive shipment 2024-19 of dry active waste on May 29,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2023, through March 31, 2024)
(2) Unit 2 (April 1, 2023, through March 31, 2024)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)anticipated transients without scram mitigation system actuation circuitry repeated failures.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===60855 - Operation Of An ISFSI The inspectors performed a review of the licensees independent spent fuel storage installation (ISFSI) activities to verify compliance with requirements of the Certificate of Compliance 72-1014, License Amendment 7, and the HI-STORM 100 Final Safety Analysis Report (FSAR)

Revision 9. The inspectors reviewed selected procedures, corrective action reports, and records to verify ISFSI operations were compliant with the Certificate's Technical Specifications, requirements in the FSAR, and NRC regulations.

Operation of An ISFSI===

(1) The inspectors evaluated the licensees dry cask storage operations, from March 25 to 29, 2024, during an on-site inspection and continued the inspect through an in-office review from March 29 to June 20, 2024. The ISFSI is located approximately 2,900 feet southeast of the Unit 1 reactor building within a separate protected area. The pad was designed to hold 84 HI-STORM 100S (Version B)loaded with the multi-purpose canisters, each with 32 spent fuel assemblies (MPC-32). The pad is designed to store the casks in a 6 by 14 array. At the time of the routine loading inspection, the ISFSI pad contained a total of 55 HI-STORM 100S overpacks. The licensee was in the process of transporting the 56th cask to the ISFSI and loading/processing the 57th cask in the spent fuel building.

During the on-site inspection, the inspectors evaluated and observed the following activities:

  • walk-down of the ISFSI haul path
  • transportation of the 56th cask on the vertical cask transporter from the spent fuel building to the ISFSI
  • fuel assembly selection and placement into the 57th canister
  • heavy load lifts using the cask handling crane to remove the transfer cask with the loaded canister from the spent fuel pool to the canister processing area
  • welding and non-destructive testing of the lid-to-shell weld
  • processing of the spent nuclear fuel for storage, including bulk water removal, forced helium dehydration, and helium backfill operations
  • final sealing of the canister, including welding of the vent and port cover plates and non-destructive testing
  • heavy load lifts using the cask handling crane to download the canister from the transfer cask into the HI-STORM 100S overpack The inspectors reviewed and evaluated the following documentation during the inspection:
  • fuel selection evaluations for the canisters loaded since the last NRC ISFSI inspection, the inspectors reviewed the contents of casks 46-57 against the license's technical specifications for approved contents
  • radiation surveys for dose at the owner-controlled boundary to verify compliance with the requirements of 10 CFR 72.104 for calendar years 2021, 2022, and 2023
  • selected ISFSI related condition reports issued since the last ISFSI inspection (March 2021)
  • quality assurance program implementation, including recent quality assurance audits, surveillances, receipt inspection, and quality control activities related to ISFSI operations
  • compliance to technical specifications for operational surveillance activities and FSAR required annual maintenance activities
  • documentation of annual maintenance activities for the sites cask handling crane and special lifting devices
  • selected licensee design changes and program changes to the ISFSI performed under the site's 10 CFR 72.48 program
  • changes made by the licensee in the site's 10 CFR 72.212 evaluation report from revision 12 to revision 14
  • review of the licensee's replacement overhead crane to meet the requirements of ASME NOG-1, Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder), and NUREG 0554, Single-Failure-Proof Cranes for Nuclear Power Plants, for single-failure-proof cranes

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 30, 2024, the inspectors presented the radiation protection inspection results to Steven Sewell, Site Vice President, and other members of the licensee staff.
  • On July 2, 2024, the inspectors presented the ISFSI triennial and loading inspection results to Steven Sewell, Site Vice President, and other members of the licensee staff.
  • On July 11, 2024, the inspectors presented the integrated inspection results to Steven Sewell, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2022-008037

CR for bent cap screws

CR-2024-000591

CR for missing springs on Fuel building overhead

crane.

ECO-5014-294 _ VDRT-

5888278

Screen for MPC Fuel Basket Support System

using Extruded Aluminum Structures

EV-TR-2023-005759_4

2.48 evaluation of Comanche Peak weather-

related administrative controls at ISFSIs

MPC 55 Prelim CARCASS

Cask Acceptability Report and Comprehensive

Assembly Specifications Supplement for Cask

  1. 055

Engineering

Evaluations

MPC_053_FINAL_CARCASSa

Cask Acceptability Report and Comprehensive

Assembly Specifications Supplement for Cask

  1. 053

EVAL-2021-008

CPNPP Nuclear Oversight Audit Report for Core

Performance Engineering and Fuel Management

HI-2002444

Final Safety Analysis Report for HI-STORM 100

CASK System

ISFSI - CPNNP 212 Report

Comanche Peak Nuclear Power Plant 10 CFR 2.212 Evaluation Report Docket Number 72-74

Pages from OPT-102A-1-2022

Storage module vent surveillance procedure and

documentation for the surveillances

QVE-0454.1. A_54

QA surveillance activities performed from

January 1 - April 30, 2022, by resident inspectors

at the HMD/Orrvilon and Holtec Camden AMD

facilities for

the manufacture of Dry Cask Spent Fuel Storage

System equipment for Luminant.

Miscellaneous

VDRT-6035293

Certificate of Compliance for Spent Fuel Storage

Casks 72-1014 HI-STORM 100

DCS-201_R13

Transporting loaded and unloaded HI-STORM

60855

Procedures

DCS-301-R12

Dry Cask Storage Equipment Malfunction, Loop,

LOCA, and Contingencies Guidance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

GAM Results from 2021 to

23

TLD dose rates for each quarter to demonstrate

FCR 72.104 compliance.

Radiation

Surveys

M-20230126-4

Radiation surveys of the ISFSI pad

01/26/2023

WO-21-826359

Maintenance/inspection of Fuel Building

Overhead Crane X-01

Work Orders

WO-22-95159_1

Inspection of HI-TRAC 125D Transfer Cask Lift

Yoke Ancillary #702

OPT-206A-3

TDAFW Pump Valve Position Verification Data

Sheet

SOP-304A-AF-VO1

Train A MDAFW Pump Lineup

SOP-304A-AF-VO3

TDAFW Pump Lineup

71111.04

Procedures

SOP-304A-AF-VO4

CST Lineup

Fire Plans

FPI-501

electrical and control building elevation 778'

Fire Protection Report

FPI-602

Fire Preplan Instruction Manual, Fuel Handling

Building, Elev. 810'

FPI-603

Fire Preplan Instruction Manual, Fuel Handling

Building, Elev. 838" - 9"

71111.05

Miscellaneous

FPI-604

Fire Preplan Instruction Manual, Fuel Handling

Building, Elev. 860'

210-063-0074

Suppression System Flooding Analysis

R&R-PN-021

Internal Flood Analysis

71111.06

Calculations

SI-CA-0000-0062

Unit 1 Safeguards Building Flooding Analysis

Miscellaneous

LO44.BBS.026

Indian Point 2 Steam Generator Tube Leak

04/10/2024

ABN-106

High Secondary Activity

EOP-3.0A

Steam Generator Tube Rupture

IPO-003A

Power Operations

IPO-005A

Plant Cooldown from Hot Standby to Cold

Shutdown

71111.11Q

Procedures

SOP-102A

Residual Heat Removal System

Guarded Equipment Posting for 2ST Outage

04/10/2024

71111.13

Miscellaneous

Guarded Equipment Postings for Inoperable

Safety Chiller 1-06

04/22/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

STI-600.01

Protecting Plant Equipment and Sensitive

Equipment Controls

Corrective

Action

Documents

CR-YYYY-NNNN

2010-9232, 2016-3101, 2023-4276, 2023-7273,

24-2119, 2014-9418, 2024-0774, 2020-0934,

24-2731

OPT-205A-4

Train B containment Spray Valve data Sheet

Procedures

STI-744.09

Structural Monitoring Inspection Guide

71111.15

Work Orders

5682592

71111.20

Miscellaneous

LOB8C24LR1

Unit 1 Downpower JITT Tabletop (MFP Repairs)

Corrective

Action

Documents

Resulting from

Inspection

IR-YYYY-NNNN

24-002168

MSE-P0-8349

Limitorque Actuator Periodic Electrical and

Mechanical Inspection

OPT-203A

Residual Heat Removal System

OPT-216A

Remote Shutdown Operability Test

Procedures

SOP-102A

Residual Heat Removal System

2-5226207

Major inspection of 2-LV-4755-MO

05/07/2024

71111.24

Work Orders

24-86000

RHR Pump 1-01 Operability Test

05/02/2024

71124.08

Shipping

Records

24-19

UN3321, Radioactive Material, low specific

activity (LSA-II), 7, dry active waste

05/29/2024

71152A

Corrective

Action

Documents

CR-YYYY-NNNN

2003-000377, 2007-003161, 2011-007126,

2012-00803, 2013-011737, 2014-000193,

2015-004134, 2015-012254, 2016-008844,

2019-004745, 2020-008429, 2010-005373,

2011-003954, 2014-007548, 2017-006123