IR 05000247/2011001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12061A159 | | number = ML12061A159 | ||
| issue date = 03/05/2012 | | issue date = 03/05/2012 | ||
| title = | | title = Annual Assessment Letter (Report 05000247/2011001 and 05000286/2011001) | ||
| author name = Gray M | | author name = Gray M | ||
| author affiliation = NRC/RGN-I/DRP/PB2 | | author affiliation = NRC/RGN-I/DRP/PB2 | ||
Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES rch 5, 2012 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER - INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORTS 05000247/2011001 AND 05000286/2011001) | |||
==Dear Mr. Ventosa:== | |||
On February 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan. | |||
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the plant performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the plant performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, | The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Also, we have scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include an inspector review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your voluntary actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Web site at: | ||
http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf The NRC previously budgeted and completed inspections at Indian Point Units 2 and 3 considering each unit as a single reactor site. This approach was based on the historical differences involving ownership and operation of each unit by different utilities with separate organizations. Since 2001, Entergy has been the sole owner and operator of Indian Point Units 2 and 3, and has consolidated and implemented plant programs and processes. As a result, insights from our inspections on one unit are generally applicable to the other unit. Beginning January 1, 2012, the NRC implemented a modified inspection program that performs major team inspections, with the exception of licensed operator programs and triennial fire protection inspections, on a site basis verses a unit basis. This is reflected in the attached inspection plans for Indian Point Units 2 and 3 which have team inspections scheduled concurrently on both units. The NRC will monitor the results of these team inspections and inform you regarding changes to our inspection plans in the future. Additionally, beginning with the 2012 mid-cycle assessment, the NRC will assess your performance with regard to cross-cutting issues on a site basis instead of a unit basis. The resident inspector staff and their inspection activities are not affected by these changes. | |||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management Systems (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan. | Please contact Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely,/RA/ Mel Gray, Chief Projects Branch 2 Division of Reactor Projects | Sincerely, | ||
/RA/ | |||
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64 Enclosure: Point 2 & 3 Inspection / Activity Plan cc w/encl: Distribution via ListServ | |||
ML12061A159 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12 Distribution w/encl: (via E-mail) | |||
W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP P. Cataldo, SRI M. Catts, SRI A. Ayegbusi, RI M. Halter, RI D. Hochmuth, AA DRS Branch Chiefs (6) | |||
D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource | |||
Page 1 of 2 Indian Point 02/27/2012 14:26:18 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2/6 EXAM - IP2 INITIAL EXAM 4 2 01/09/2012 01/13/2012 U01844 FY-12-IP2 INITIAL OPERATOR LICENSING EXAM 2 02/06/2012 02/10/2012 U01844 FY-12-IP2 INITIAL OPERATOR LICENSING EXAM 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE I 3 2 03/04/2012 03/08/2012 IP 2516/001 Review of License Renewal Activities 71124 - HP 1 2 03/12/2012 03/16/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/12/2012 03/16/2012 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - INSERVICE INSPECTION 1 2 03/12/2012 03/23/2012 IP 7111108P Inservice Inspection Activities - PWR 2561 - SAFSTOR INSPECTION 1 1 06/04/2012 06/08/2012 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 06/04/2012 06/08/2012 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 06/04/2012 06/08/2012 IP 83750 Occupational Radiation Exposure 1 06/04/2012 06/08/2012 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 06/04/2012 06/08/2012 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials 71124 - REMP 1 2 06/11/2012 06/15/2012 IP 71124.07 Radiological Environmental Monitoring Program TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 2 07/09/2012 07/13/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111111B - IP2 REQUAL INSP W/ P/F RESULTS 2 2 09/17/2012 09/21/2012 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2 07/16/2012 07/20/2012 IP 60855 Operation Of An ISFSI 2 07/16/2012 07/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 07/16/2012 07/20/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 07/16/2012 07/20/2012 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 2 2 07/23/2012 07/27/2012 IP 7111107T Heat Sink Performance EP EX - EP EXERCISE EVALUATION 3 2 10/01/2012 10/05/2012 IP 7111401 Exercise Evaluation This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Indian Point 02/27/2012 14:26:18 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP EX - EP EXERCISE EVALUATION 3 2 10/01/2012 10/05/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 7111121 - CDBI 4 2 10/15/2012 10/19/2012 IP 7111121 Component Design Bases Inspection 2 10/29/2012 11/02/2012 IP 7111121 Component Design Bases Inspection 2 11/05/2012 11/09/2012 IP 7111121 Component Design Bases Inspection 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 2 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - HP 1 2 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 11/05/2012 11/09/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.07 - RETS 1 2 01/14/2013 01/18/2013 IP 71124.05 Radiation Monitoring Instrumentation 2 01/14/2013 01/18/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 3 2 01/28/2013 02/01/2013 IP 7111105T Fire Protection [Triennial] | |||
2 02/11/2013 02/15/2013 IP 7111105T Fire Protection [Triennial] | |||
ISFSI - ISFSI LOADING 1 2 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 71124 - HP 1 2 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls EP PROGR - EP PROGRAM INSPECTION 1 2 05/20/2013 05/24/2013 IP 7111402 Alert and Notification System Testing 2 05/20/2013 05/24/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/20/2013 05/24/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/20/2013 05/24/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE II 4 2 06/03/2013 06/07/2013 IP 2516/001 Review of License Renewal Activities 2 06/17/2013 06/21/2013 IP 2516/001 Review of License Renewal Activities PI&R - PI&R 4 2 06/10/2013 06/14/2013 IP 71152B Problem Identification and Resolution 2 06/24/2013 06/28/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 1 of 2 Indian Point 3 02/27/2012 14:27:04 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 3 03/12/2012 03/16/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/12/2012 03/16/2012 IP 71124.02 Occupational ALARA Planning and Controls 71124 - REMP 1 3 06/11/2012 06/15/2012 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI - WET TRNSFER DRY RUN ACTIVITIES 2 3 07/01/2012 08/30/2012 IP 60854 Preoperational Testing Of An ISFSI TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 3 07/09/2012 07/11/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - HP 1 3 07/16/2012 07/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 07/16/2012 07/20/2012 IP 71124.02 Occupational ALARA Planning and Controls 3 07/16/2012 07/20/2012 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 2 3 07/23/2012 07/27/2012 IP 7111107T Heat Sink Performance EP EX - EP EXERCISE EVALUATION 3 3 10/01/2012 10/05/2012 IP 7111401 Exercise Evaluation 3 10/01/2012 10/05/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2/11 EXM - IP3 INITIAL EXAM 4 3 01/14/2013 01/18/2013 U01866 FY-13 IP3 INITIAL OPERATOR LICENSING EXAM 3 02/11/2013 02/15/2013 U01866 FY-13 IP3 INITIAL OPERATOR LICENSING EXAM 7111121 - CDBI 5 3 10/15/2012 10/19/2012 IP 7111121 Component Design Bases Inspection 3 10/29/2012 11/02/2012 IP 7111121 Component Design Bases Inspection 3 11/05/2012 11/09/2012 IP 7111121 Component Design Bases Inspection 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 3 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - HP 1 3 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 3 11/05/2012 11/09/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124 - RETS 1 3 01/14/2013 01/18/2013 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Indian Point 3 02/27/2012 14:27:04 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RETS 1 3 01/14/2013 01/18/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108P - U3 INSERVICE INSPECTION 1 3 03/18/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP 1 3 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls EP PROGR - EP PROGRAM INSPECTION 1 3 05/20/2013 05/24/2013 IP 7111402 Alert and Notification System Testing 3 05/20/2013 05/24/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 05/20/2013 05/24/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 05/20/2013 05/24/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies PI&R - PI&R 4 3 06/10/2013 06/14/2013 IP 71152B Problem Identification and Resolution 3 06/24/2013 06/28/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities. | |||
Point | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Latest revision as of 07:20, 12 November 2019
ML12061A159 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/05/2012 |
From: | Mel Gray Reactor Projects Branch 2 |
To: | Ventosa J Entergy Nuclear Operations |
Shared Package | |
ML12058A402 | List: |
References | |
FOIA/PA-2016-0148 IR-11-001 | |
Download: ML12061A159 (8) | |
Text
UNITED STATES rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER - INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORTS 05000247/2011001 AND 05000286/2011001)
Dear Mr. Ventosa:
On February 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the plant performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Also, we have scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include an inspector review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your voluntary actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Web site at:
http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf The NRC previously budgeted and completed inspections at Indian Point Units 2 and 3 considering each unit as a single reactor site. This approach was based on the historical differences involving ownership and operation of each unit by different utilities with separate organizations. Since 2001, Entergy has been the sole owner and operator of Indian Point Units 2 and 3, and has consolidated and implemented plant programs and processes. As a result, insights from our inspections on one unit are generally applicable to the other unit. Beginning January 1, 2012, the NRC implemented a modified inspection program that performs major team inspections, with the exception of licensed operator programs and triennial fire protection inspections, on a site basis verses a unit basis. This is reflected in the attached inspection plans for Indian Point Units 2 and 3 which have team inspections scheduled concurrently on both units. The NRC will monitor the results of these team inspections and inform you regarding changes to our inspection plans in the future. Additionally, beginning with the 2012 mid-cycle assessment, the NRC will assess your performance with regard to cross-cutting issues on a site basis instead of a unit basis. The resident inspector staff and their inspection activities are not affected by these changes.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management Systems (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247; 50-286 License Nos. DPR-26; DPR-64 Enclosure: Point 2 & 3 Inspection / Activity Plan cc w/encl: Distribution via ListServ
ML12061A159 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12 Distribution w/encl: (via E-mail)
W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP P. Cataldo, SRI M. Catts, SRI A. Ayegbusi, RI M. Halter, RI D. Hochmuth, AA DRS Branch Chiefs (6)
D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource
Page 1 of 2 Indian Point 02/27/2012 14:26:18 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2/6 EXAM - IP2 INITIAL EXAM 4 2 01/09/2012 01/13/2012 U01844 FY-12-IP2 INITIAL OPERATOR LICENSING EXAM 2 02/06/2012 02/10/2012 U01844 FY-12-IP2 INITIAL OPERATOR LICENSING EXAM 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE I 3 2 03/04/2012 03/08/2012 IP 2516/001 Review of License Renewal Activities 71124 - HP 1 2 03/12/2012 03/16/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/12/2012 03/16/2012 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - INSERVICE INSPECTION 1 2 03/12/2012 03/23/2012 IP 7111108P Inservice Inspection Activities - PWR 2561 - SAFSTOR INSPECTION 1 1 06/04/2012 06/08/2012 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 06/04/2012 06/08/2012 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 06/04/2012 06/08/2012 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 06/04/2012 06/08/2012 IP 83750 Occupational Radiation Exposure 1 06/04/2012 06/08/2012 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 06/04/2012 06/08/2012 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials 71124 - REMP 1 2 06/11/2012 06/15/2012 IP 71124.07 Radiological Environmental Monitoring Program TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 2 07/09/2012 07/13/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111111B - IP2 REQUAL INSP W/ P/F RESULTS 2 2 09/17/2012 09/21/2012 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2 07/16/2012 07/20/2012 IP 60855 Operation Of An ISFSI 2 07/16/2012 07/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 07/16/2012 07/20/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 07/16/2012 07/20/2012 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 2 2 07/23/2012 07/27/2012 IP 7111107T Heat Sink Performance EP EX - EP EXERCISE EVALUATION 3 2 10/01/2012 10/05/2012 IP 7111401 Exercise Evaluation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Indian Point 02/27/2012 14:26:18 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP EX - EP EXERCISE EVALUATION 3 2 10/01/2012 10/05/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 7111121 - CDBI 4 2 10/15/2012 10/19/2012 IP 7111121 Component Design Bases Inspection 2 10/29/2012 11/02/2012 IP 7111121 Component Design Bases Inspection 2 11/05/2012 11/09/2012 IP 7111121 Component Design Bases Inspection 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 2 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - HP 1 2 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 11/05/2012 11/09/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.07 - RETS 1 2 01/14/2013 01/18/2013 IP 71124.05 Radiation Monitoring Instrumentation 2 01/14/2013 01/18/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 3 2 01/28/2013 02/01/2013 IP 7111105T Fire Protection [Triennial]
2 02/11/2013 02/15/2013 IP 7111105T Fire Protection [Triennial]
ISFSI - ISFSI LOADING 1 2 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 71124 - HP 1 2 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls EP PROGR - EP PROGRAM INSPECTION 1 2 05/20/2013 05/24/2013 IP 7111402 Alert and Notification System Testing 2 05/20/2013 05/24/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/20/2013 05/24/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/20/2013 05/24/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE II 4 2 06/03/2013 06/07/2013 IP 2516/001 Review of License Renewal Activities 2 06/17/2013 06/21/2013 IP 2516/001 Review of License Renewal Activities PI&R - PI&R 4 2 06/10/2013 06/14/2013 IP 71152B Problem Identification and Resolution 2 06/24/2013 06/28/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 1 of 2 Indian Point 3 02/27/2012 14:27:04 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 3 03/12/2012 03/16/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/12/2012 03/16/2012 IP 71124.02 Occupational ALARA Planning and Controls 71124 - REMP 1 3 06/11/2012 06/15/2012 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI - WET TRNSFER DRY RUN ACTIVITIES 2 3 07/01/2012 08/30/2012 IP 60854 Preoperational Testing Of An ISFSI TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 3 07/09/2012 07/11/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - HP 1 3 07/16/2012 07/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 07/16/2012 07/20/2012 IP 71124.02 Occupational ALARA Planning and Controls 3 07/16/2012 07/20/2012 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 2 3 07/23/2012 07/27/2012 IP 7111107T Heat Sink Performance EP EX - EP EXERCISE EVALUATION 3 3 10/01/2012 10/05/2012 IP 7111401 Exercise Evaluation 3 10/01/2012 10/05/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2/11 EXM - IP3 INITIAL EXAM 4 3 01/14/2013 01/18/2013 U01866 FY-13 IP3 INITIAL OPERATOR LICENSING EXAM 3 02/11/2013 02/15/2013 U01866 FY-13 IP3 INITIAL OPERATOR LICENSING EXAM 7111121 - CDBI 5 3 10/15/2012 10/19/2012 IP 7111121 Component Design Bases Inspection 3 10/29/2012 11/02/2012 IP 7111121 Component Design Bases Inspection 3 11/05/2012 11/09/2012 IP 7111121 Component Design Bases Inspection 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 3 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - HP 1 3 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 3 11/05/2012 11/09/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124 - RETS 1 3 01/14/2013 01/18/2013 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Indian Point 3 02/27/2012 14:27:04 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RETS 1 3 01/14/2013 01/18/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108P - U3 INSERVICE INSPECTION 1 3 03/18/2013 03/29/2013 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP 1 3 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls EP PROGR - EP PROGRAM INSPECTION 1 3 05/20/2013 05/24/2013 IP 7111402 Alert and Notification System Testing 3 05/20/2013 05/24/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 3 05/20/2013 05/24/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 05/20/2013 05/24/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies PI&R - PI&R 4 3 06/10/2013 06/14/2013 IP 71152B Problem Identification and Resolution 3 06/24/2013 06/28/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.