IR 05000247/2013006

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-13-006 and 05000286-13-006)
ML13242A244
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/03/2013
From: Arthur Burritt
Reactor Projects Branch 2
To: Ventosa J
Entergy Nuclear Operations
Burritt A
References
IR-13-006
Download: ML13242A244 (5)


Text

UNITED STATES ember 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2013006 AND 05000286/2013006)

Dear Mr. Ventosa:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (Green), and all PIs indicated that your performance was within the nominal, expected range (Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 60845, Operation of Intra-Unit Fuel Transfer Canister and Cask System, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2. We have also scheduled a review of your proposed commitments made during the license renewal application process regarding Indian Point Unit 2. This activity will include a review of Aging Management Program implementation and will be conducted using TI 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The TI is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf.

As described in our assessment letter dated March 4, 2013, the NRC has modified the inspection program at Indian Point. On January 1, 2012, the NRC implemented an inspection program which performs major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Also, on January 1, 2013, the NRC reduced the inspection sample requirements for the resident baseline inspection program and set resident staffing at three permanent resident inspectors instead of four. However, the modified inspection program maintains an increased NRC inspection effort and staffing compared to other dual unit sites in the U.S.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure: Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML13242A244 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP NAME SMcCarver/SCM ABurritt/ALB DATE 8/26/13 9/3/13

Page 1 of 2 Indian Point 08/01/2013 08:24:28 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - INDIAN PT 3 REQUAL INSP WITH P/F RESULTS 2 3 09/16/2013 09/20/2013 IP 7111111B Licensed Operator Requalification Program 71124 - HP - EXPOSURE AND ALARA CONTROLS 1 2, 3 08/19/2013 08/23/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 08/19/2013 08/23/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 08/19/2013 08/23/2013 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI LOADING INSPECTION 2 2 08/19/2013 08/23/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants PI&R - PI&R 5 2, 3 10/07/2013 10/11/2013 IP 71152B Problem Identification and Resolution 2, 3 10/21/2013 10/25/2013 IP 71152B Problem Identification and Resolution 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE III 2 2 09/09/2013 09/13/2013 IP 2516/001 Review of License Renewal Activities 2/9EXAM - IP2 INITIAL EXAM 4 2 01/13/2014 01/17/2014 U01890 FY14-INDIAN POINT 2 INITIAL OPERATOR LICENSING EXAM 2 02/10/2014 02/19/2014 U01890 FY14-INDIAN POINT 2 INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE 1 2, 3 11/04/2013 11/08/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111108P - INSERVICE INSPECTION 1 2 03/03/2014 03/14/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP 1 2, 3 03/10/2014 03/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/10/2014 03/14/2014 IP 71124.02 Occupational ALARA Planning and Controls TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 03/31/2014 04/04/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping TRI FIRE - IP3 TRIENNIAL FIRE PROTECTION INSPECTION 4 3 05/05/2014 05/09/2014 IP 7111105T Fire Protection [Triennial]

3 05/19/2014 05/23/2014 IP 7111105T Fire Protection [Triennial]

71124.07 - REMP 1 2, 3 06/09/2014 06/13/2014 IP 71124.07 Radiological Environmental Monitoring Program 2561 - SAFSTOR 1 1 06/23/2014 06/25/2014 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Indian Point 08/01/2013 08:24:28 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2561 - SAFSTOR 1 1 06/23/2014 06/25/2014 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 60801 Spent Fuel Pool Safety At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 06/23/2014 06/25/2014 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 06/23/2014 06/25/2014 IP 83750 Occupational Radiation Exposure 1 06/23/2014 06/25/2014 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 06/23/2014 06/25/2014 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials MODS - PERMANENT PLANT MODIFICATIONS 4 2, 3 06/23/2014 06/27/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 07/07/2014 07/11/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - INTER-UNIT FUEL TRANSFER 2 2, 3 07/14/2014 07/18/2014 IP 60845 Operation of Inter-Unit Fuel Transfer Canister and Cask System 7111111B - U2 REQUAL INSP WITH P/F RESULTS 2 2 09/15/2014 09/19/2014 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2, 3 08/11/2014 08/15/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 08/11/2014 08/15/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 08/11/2014 08/15/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation EP EXER - EP EXERCISE INSPECTION 1 2, 3 10/06/2014 10/10/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - HP 1 2, 3 11/03/2014 11/07/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 11/03/2014 11/07/2014 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure