MONTHYEARML22347A2502022-12-21021 December 2022 Security Inspection Plan ML21208A2112021-07-27027 July 2021 Decommissioning Inspection Plan for Indian Point Generating Unit 3 - 2021 IR 05000286/20200062021-03-0303 March 2021 Annual Assessment Letter for Indian Point Energy Center, Unit 3 (Report 05000286/2020006) IR 05000286/20200052020-08-31031 August 2020 Updated Inspection Plan for Indian Point Energy Center, Unit 3 (Inspection Report 05000286/2020005) IR 05000247/20190062020-03-0303 March 2020 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2019006 and 05000286/2019006) IR 05000247/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000247/2019005 and 05000286/2019005) IR 05000247/20180062019-03-0404 March 2019 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Reports 05000247/2018006 and 05000286/2018006) IR 05000247/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) ML18240A1612018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) IR 05000247/20170062018-02-28028 February 2018 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2017006 and 05000286/2017006, Report 05000247/2017402 and 05000286/2017402, Report 05000247/2017501 and 05000286/2017501) IR 05000247/20170052017-08-28028 August 2017 Updated Inspection Plan for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2017005 and 05000286/2017005) IR 05000247/20160062017-03-0101 March 2017 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2016006 and 05000286/2016006) IR 05000247/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2016005 and 05000286/2016005) IR 05000247/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2015006 and 05000286/2015006) IR 05000247/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2015005 and 05000286/2015005) ML15061A4012015-03-0404 March 2015 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan) IR 05000247/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-14-006 and 05000286-14-006) IR 05000247/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2013001 and 05000286/2013001)(w/Inspection Plan) ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan IR 05000247/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-13-006 and 05000286-13-006) IR 05000247/20120012013-03-0404 March 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-12-001 and 05000286-12-001) ML12297A0062012-10-22022 October 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12244A3542012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Indian Point Nuclear Generating Units 2 and 3 IR 05000247/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000247/2011001 and 05000286/2011001) ML1124208362011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Indian Point Nuclear Generating Units 2 and 3 ML1106204642011-03-0404 March 2011 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Reports 05000247/2010001 and 05000286/2010001) ML1024402362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Indian Point Nuclear Generating Units 2 and 3 ML1006208632010-03-0303 March 2010 Annual Assessment Letter (Report 05000247-10-001 & 05000286-10-001) ML0924401932009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Stations Units 2 and 3, Dated 09/01/09 IR 05000247/20090012009-03-0404 March 2009 IR 05000247-09-001 and 05000286-09-001, on 02/10/2009, Indian Point Nuclear Generating Units 1 & 2, Annual Assessment Letter, Dated March 4, 2009 ML0824703162008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Indian Point, Units 2 and 3 ML0904105262008-06-0202 June 2008 Inspection Plan - Indian Point 2; Station Blackout Diesel Generator Modification & 50.59; IR No. 50-247-08-012 IR 05000247/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Indian Point Energy Center (05000247-08-001, 05000286-08-001) ML0734709592007-12-13013 December 2007 ROP8 - Indian Point 2 and 3 - Change to Inspection Plan, 12/13/07 ML0724309422007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0706106032007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Indian Point Station Units 2 & 3 (05-247/2007001 and 05-286/2007001) ML0708806212006-12-26026 December 2006 E-Mail from Mclaughlin to Alp@Nyserda.Org, NRC Reactor Inspection Schedule for 1Q07 ML0624306582006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0613805862006-05-18018 May 2006 Inspection/Activity Plan, 05/01/2006 - 09/30/2007 ML0621406102006-05-18018 May 2006 Inspection / Activity Plan 05/01/2006 - 09/30/2007 ML0606201072006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3 (Reports 05-247/2006001 & 05-286/2006001) ML0526400032005-09-20020 September 2005 Memo Special Inspection Charter - Indian Point, Unit No. 2 ML0524207132005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Indian Point 2 & 3 ML0506105932005-03-0202 March 2005 Annual Assessment Letter 2005001 - Indian Point 2 & 3 ML0424400842004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Indian Point 2 and 3 ML0406305552004-03-0303 March 2004 2003-04 Annual Assessment Letter - Indian Point IR 05000286/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Indian Point Nuclear Generating Unit 2 (Report 50-286/2003001) ML0224100642002-08-28028 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Unit 2 ML0223803962002-08-26026 August 2002 2002 Indian Point 3 Mid-Cycle Performance Review and Inspection Plan IR 05000247/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Indian Point 2 (Report 50-247/02-01) 2022-12-21
[Table view] |
Text
INSPECTION PLAN - Indian Point 2 Station Blackout Diesel Generator Modification & 50.59 IR No. 50-247/2008-012 Inspection Objectives Verify that the IP-2 station blackout diesel generator (SBO DG) modification did not adversely affect the performance capability of risk-significant systems, structures, and components. This verification will include assessment of selected design, installation, and testing aspects of the SBO DG modification.
Verify that procedures, design bases, and licensing bases documentation affected by the modification has been adequately updated.
Verify that the modification was reviewed and documented in accordance with 10 CFR 50.59, and that NRC approval was obtained prior to implementing any changes which required such approval.
Required Sample Size 1 Modification 1 50.59 Safety Evaluation or Screening In addition, review a selected sample of issues and problems to evaluate the licensees ability to identify and correct deficiencies associated with the SBO DG modification and 50.59 processes.
Inspection Team J. Richmond, Team Lead J. Lilliendahl Inspection Schedule Bag-man trip If Needed, week of May 12 In-office Prep May 12 to 30 On-site Inspection June 2 to 6 Entrance Meeting Monday, June 2, at 11 AM, in GSB room 441 De-brief Meeting Thursday, June 5, at 3 PM, in GSB room 441 Doc June 9 to 13 (in-office)
Team Leader Doc June 16 to 20 (in-office)
Feeder to BC June 20 (formal feeder to BC, for inclusion with scheduled Mods Team inspection in July-Aug)
INSPECTION PLAN DETAILS HRMS Information. Track hours charged to the inspection.
Resource Estimates for Direct Inspection Effort Per inspector, 20 to 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> of BI over the inspection period.
Per inspector, 25 to 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> of prep/doc over the inspection period.
Inspection Report Number Task Codes 05000247/2008012 BIP (Preparation Time)
BID (Documentation Time)
AT (Travel Time)
BI - 71111.17 (Direct Inspection)
Inspection Guidance J. Lilliendahl -- Inspection Scope Electrical portions of mod, including breaker coordination & load studies Station Blackout Analysis, including manual operator action time-lines Appendix R Analysis 50.59 Screenings & Evaluations PI&R J. Richmond -- Inspection Scope Mechanical portions of mod, including engine cooling & fuel systems Post modification testing Current licensing basis changes, including FSAR & TRM Long lived passive component review PI&R Team Meetings. Daily, as needed.
Information & Support Requests. Inspectors may request needed information directly through their licensee point of contact.
Potential Findings. Evaluate issues in accordance with MC 0612, to determine whether they are above the minor threshold, and recommend an on-going plan for follow-up.
Team Debrief Needs. It is anticipated that the information will have been previously discussed during the daily team meetings. The following should be provided:
Findings that may be in the inspection report.
Overall assessment & characterization of findings, minor violations, and observations.
Overall effectiveness of problem identification, evaluation and prioritization, and associated corrective actions.
Overall assessment of engineering performance.
Inspection Report Documentation Feeders are to be written in MS Word format.
Inspection inputs should meet the requirements of MC 0612. Characterize performance deficiencies and findings per MC 0612. For NCVs, provide the "Contrary to" paragraph. Use active voice and past tense ("The inspectors observed..."). For all findings, include a Summary of Findings input.
List all documents reviewed by document number, title, and revision or date. List the principle licensee & NRC personnel contacted, by name and title. (see attached example)
Deliverables. E-mail report feeder to Team Leader by COB Friday, June 13.
Format for the List of Documents Reviewed
- 1. No quotations shall be used.
- 2. Use Sht. for sheet.
- 3. Use Rev. for revision.
- 4. Date format shall be xx/xx/xx.
- 5. For condition reports and work orders, list number only (no title, rev, or date).
- 6. Add an asterisk after condition reports generated as a result of this inspection.
- 7. For completed tests, list test number, title, and "performed on xx/xx/xx" (no rev).
- 8. If a document is longer than 1-line, then use a Hanging Indent for the second line.
- 9. Bin the documents under the headings below.
10 CFR 50.59 Evaluations 10 CFR 50.59 Screened-out Evaluations Modification Packages Calculations & Analysis Corrective Action Reports (* denotes NRC identified during this inspection)
Self-assessments & Audits Drawings Surveillance and Modifications Acceptance Tests Procedures Work Orders Vendor Manuals Miscellaneous
Create a hanging indent
- 1. Select the paragraph in which you want to create a hanging indent (hanging indent: Paragraph formatting in which the second and subsequent lines of a paragraph are indented more than the first line. Common uses for the hanging indent are bulleted and numbered lists.).
- 2. If you don't see the horizontal ruler (horizontal ruler: A bar marked off in units of measure (such as inches) that is displayed across the top of the document window.), click Ruler on the View menu.
- 3. On the horizontal ruler, drag the Hanging Indent marker to the position at which you want the indent to start.