NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs
ML23242A277
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/30/2023
From: Sturzebecher K
Reactor Decommissioning Branch
To: Fleming J
Holtec Decommissioning International
Sturzberger, K, NMSS/RDB
Shared Package
ML23242a275 List:
References
EPID L-2022-LLA-0160
Download: ML23242A277 (3)


Text

Jean Fleming Vice President, Licensing, Regulatory Affairs, and PSA Holtec International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 AND 3 - ISSUANCE OF AMENDMENT NO. 299 AND 275 TO RENEWED FACILITY LICENSES NO.

DPR-26 AND DPR-64 TO REVISE THE TECHNICAL SPECIFICATIONS AND MODIFY STAFFING REQUIREMENTS FOLLOWING PERMANENT TRANSFER OF ALL SPENT FUEL TO DRY STORAGE (EPID L-2022-LLA-0160)

Dear Jean Fleming:

The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 299 and 275 for Renewed Facility License (RFL) No. DPR-26 and DPR-64 for the Indian Point Nuclear Generating Unit No. 2 (IP2) and No. 3 (IP3), operated by Holtec Decommissioning International, LLC (HDI). The amendment is in response to HDIs application dated November 2, 2022 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML22306A126). The amendment revises the RFL and associated Technical Specifications (TS) to reflect the removal of all spent nuclear fuel from the IP2 and IP3 spent fuel pit (SFP) and its transfer to dry cask storage within an onsite Independent Spent Fuel Storage Installation (ISFSI).

These changes reflect the permanently shut down status of the decommissioning facility, as well as the reduced scope of structures, systems, and components necessary to ensure plant safety once all spent fuel has been permanently moved to the Indian Point Energy Center ISFSI. The license amendment and revised TS also modify the IP2 and IP3 staffing requirements in Appendix A, Permanently Defueled Technical Specifications, and revise the 10 CFR Part 50 Facility License and Appendix C, Inter-Unit Fuel Transfer Technical Specifications. This includes prohibiting the transfer of Indian Point Nuclear Generating Unit No. 2 and 3 spent fuels to the IP2 or IP3 SFP.

The license amendment and TS changes are provided as Enclosure 1 and 2. The changes are effective upon issuance and shall be implemented within 60 days.

A copy of the related safety evaluation is provided in Enclosure 3. A Notice of Issuance will be included in the Commissions monthly Federal Register notice.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public November 29, 2023 Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning the above, please contact me at 301-415-8534 or via email at Karl.Sturzebecher@nrc.gov.

Sincerely, Karl J. Sturzebecher, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-247, and 50-286

Enclosures:

1. Amendment No. 299 to No. DPR-26
2. Amendment No. 275 to No. DPR-64
3. Safety Evaluation cc w/enclosures: Indian Point ListServ Signed by Sturzebecher, Karl on 11/28/23

ML23242a275; Ltr ML23242A277 OFFICE NMSS/DUWP/RDB NMSS/DWUP/RDB NMSS/DUWP/RDB NMSS/DWUP/RDB NAME SAnderson SA KSturzebecher KSSAnderson SA KSturzebecher KS DATE Oct 11, 2023 Nov 28, 2023 Nov 29, 2023 Nov 29, 2023