Inspection/Activity Plan, 05/01/2006 - 09/30/2007
ML061380586
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/18/2006
From:
Region 1 Administrator
To:
References
Download: ML061380586 (4)


Text

Page 1 of 2 Indian Point 2 05/18/2006 13:09:47 Inspection / Activity Plan Report 22 05/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI 2 2 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 04/01/2006 12/31/2006 Other Routine 7111108P - INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/24/2006 05/05/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 05/01/2006 05/05/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 05/01/2006 05/05/2006 Baseline Inspections TI-166 - TI-166 CONTAINMENT SUMP MOD INSPECTION 3 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/08/2006 05/17/2006 Safety Issues 7112203 - GROUNDWATER CONTAMINATION/DEV MEMO 1 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 05/22/2006 05/26/2006 Baseline Inspections 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 1 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/05/2006 06/09/2006 Baseline Inspections 7111111B - U2 L.O. REQUAL. PROG.+P/F REVIEW 3 2 IP 7111111B Licensed Operator Requalification Program 08/07/2006 08/11/2006 Baseline Inspections 2 IP 7111111B Licensed Operator Requalification Program 08/14/2006 08/18/2006 Baseline Inspections 7112203 - GROUNDWATER CONTAMINATION/DEV MEMO 1 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/06/2006 11/24/2006 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 2 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/05/2006 06/23/2006 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 2 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/19/2006 06/23/2006 Baseline Inspections 7111107B - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 06/26/2006 06/30/2006 Baseline Inspections 7112203 - GROUNDWATER CONTAMINATION/DEV MEMO 1 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/04/2006 09/08/2006 Baseline Inspections 71152B - PI&R 4 2 IP 71152B Identification and Resolution of Problems 09/18/2006 09/22/2006 Baseline Inspections 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/06/2006 Baseline Inspections 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 3 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/02/2006 10/06/2006 Baseline Inspections MODS - MODS & 50.59 4 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 10/30/2006 11/03/2006 Baseline Inspections 2 IP 7111117B Permanent Plant Modifications 10/30/2006 11/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Indian Point 2 05/18/2006 13:09:47 Inspection / Activity Plan Report 22 05/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 6 2 IP 7111401 Exercise Evaluation 11/13/2006 11/17/2006 Baseline Inspections 2 IP 71151 Performance Indicator Verification 11/13/2006 11/17/2006 Baseline Inspections 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 2 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/13/2006 11/17/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/18/2006 12/22/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 12/18/2006 12/22/2006 Baseline Inspections 2 IP 71151 Performance Indicator Verification 12/18/2006 12/22/2006 Baseline Inspections 7111121 - CDBI 6 2 IP 7111121 Component Design Bases Inspection 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 01/22/2007 01/26/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 02/05/2007 02/09/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 02/12/2007 02/16/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 02/26/2007 03/02/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 02/26/2007 03/02/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 03/26/2007 03/30/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 03/26/2007 03/30/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 2 IP 7112202 Radioactive Material Processing and Transportation 05/07/2007 05/11/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 07/16/2007 07/20/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 07/16/2007 07/20/2007 Baseline Inspections 10/1 EXM - U2 OPERATOR LICENSING INITIAL EXAM 3 2 U01683 FY08 - INDIAN POINT 2 INITIAL EXAM 09/03/2007 09/06/2007 Not Applicable 71121 - OCC RADIATION SAFETY 1 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/24/2007 09/28/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 1 of 2 Indian Point 3 05/18/2006 13:11:18 Inspection / Activity Plan Report 22 05/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 3 IP 7112101 Access Control to Radiologically Significant Areas 05/01/2006 05/05/2006 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 05/01/2006 05/05/2006 Baseline Inspections 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 2 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/05/2006 06/09/2006 Baseline Inspections 7112203 - GROUNDWATER CONTAMINATION, DEV MEMO 1 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 05/22/2006 05/26/2006 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/12/2006 06/16/2006 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 2 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/19/2006 06/23/2006 Baseline Inspections 71152B - PI&R 3 3 IP 71152B Identification and Resolution of Problems 09/18/2006 09/22/2006 Baseline Inspections 3 IP 71152B Identification and Resolution of Problems 10/02/2006 10/06/2006 Baseline Inspections 7112203 - GROUNDWATER CONTAMINATION, DEV MEMO 1 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/04/2006 09/08/2006 Baseline Inspections 10/23EXM - OPERATOR LICENSING INITIAL EXAMS 3 3 U01636 INDIAN POINT 3 INITIAL EXAM (FY 07) 09/25/2006 09/29/2006 Not Applicable 3 U01636 INDIAN POINT 3 INITIAL EXAM (FY 07) 10/23/2006 11/03/2006 Not Applicable 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 2 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/02/2006 10/06/2006 Baseline Inspections MODS - MODS AND 50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 10/30/2006 11/03/2006 Baseline Inspections 3 IP 7111117B Permanent Plant Modifications 10/30/2006 11/03/2006 Baseline Inspections 7112203 - GROUNDWATER CONTAMINATION, DEV MEMO 1 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/06/2006 11/24/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 6 3 IP 7111401 Exercise Evaluation 11/13/2006 11/17/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 11/13/2006 11/17/2006 Baseline Inspections 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 3 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/13/2006 11/17/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 3 IP 7112101 Access Control to Radiologically Significant Areas 12/18/2006 12/22/2006 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 12/18/2006 12/22/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 12/18/2006 12/22/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Indian Point 3 05/18/2006 13:11:18 Inspection / Activity Plan Report 22 05/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 3 IP 7112101 Access Control to Radiologically Significant Areas 02/26/2007 03/02/2007 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 02/26/2007 03/02/2007 Baseline Inspections 7111108P - IN-SERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 03/19/2007 03/30/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 3 IP 7112101 Access Control to Radiologically Significant Areas 03/26/2007 03/30/2007 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 03/26/2007 03/30/2007 Baseline Inspections 7111111B - L.O. REQUALIFICATION PROG+P/F REVIEW 3 3 IP 7111111B Licensed Operator Requalification Program 07/09/2007 07/13/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 3 IP 7112202 Radioactive Material Processing and Transportation 05/07/2007 05/11/2007 Baseline Inspections 7111107 - HEAT SINK INSP 1 3 IP 7111107B Heat Sink Performance 07/16/2007 07/20/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 3 IP 7112101 Access Control to Radiologically Significant Areas 07/16/2007 07/20/2007 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 07/16/2007 07/20/2007 Baseline Inspections 71121 - OCC RADIATION SAFETY 1 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/24/2007 09/28/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.