Inspection / Activity Plan 05/01/2006 - 09/30/2007
ML062140610
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/18/2006
From:
NRC Region 1
To:
References
FOIA/PA-2006-0244
Download: ML062140610 (4)


Text

Page I of 2 05118/2006 Report 22 13:09:47 Indian Point 2 Inspection I Activity Plan 0510112006 - 0913012007 SUnit L.umber nspectionActivity Title ISFSI

- ISFSI 2

IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating F 7111108P

- INSERVICE INSPECTION 2

IP 7111108P Inservice Inspection Activities - PWR 71121

- OCC RAD SAFETY 2

IP 7112101 Access Control to Radiologically Significant Areas 2

IP 7112102 ALARA Planning and Controls TI-1 66 TI-166 CONTAINMENT SUMP MOD INSPECTION 2

IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02 7112203

- GROUNDWATER CONTAMINATION/DEV MEMO 2

IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 7111405 FOLLOWUP INSP FOR NEW ANS SYSTEM 2

IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 7111111B

- U2 L.O. REQUAL. PROG.+PIF REVIEW 2

IP 7111111B Licensed Operator Requalification Program 2

IP 7111111B Licensed Operator Requalification Program 7112203

- GROUNDWATER CONTAMINATION/DEV MEMO 2

IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 7112203

- PUB RAD SAFETY - REMP 2

IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 7112201

- PUB RAD SAFETY - RETS 2

IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7111107B

- HEATSINK 2

IP 7111107B Heat Sink Performance 7112203

- GROUNDWATER CONTAMINATIONIDEV MEMO 2

IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 71152B

- PI&R 2

IP 71152B Identification and Resolution of Problems 2

IP 71152B Identification and Resolution of Problems 7111405

- FOLLOWUP INSP FOR NEW ANS SYSTEM 2

IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies MODS

- MODS & 50.59 2

IP 7111102 Evaluation of Changes, Tests, or Experiments 2

IP 7111117B Permanent Plant Modifications No. of Staff Planned Dates Inspection on Site Start End Type 2

04/01/2006 12/31/2006 Other Routine 0

00124/2006 05/05/2006 Baseline Inspections 1

05/01/2006 05/05/2006 Baseline Inspections 05/01/2006 05/05/2006 Baseline Inspections 3

05/08/2006 05/17/2006 Safety Issues 1

05/22/2006 05/26/2006 Baseline Inspections 1

06/05/2006 06/09/2006 Baseline Inspections 3

08/07/2006 08/11/2006 Baseline Inspections 08/14/2006 08/18/2006 Baseline Inspections I

11/06/2006 11124/2006 Baseline Inspections 2

06/05/2006 06/23/2006 Baseline Inspections 2

06/19/2006 06/23/2006 Baseline Inspections 1

06/26/2006 06/30/2006 Baseline Inspections 1

09/04/2006 09/08/2006 Baseline Inspections 4

09/18/2006 09/22/2006 Baseline Inspections 10/0212006 1010612006 Baseline Inspections 3

10/02/2006 10/06/2006 Baseline Inspections 4

10/30/2006 11/03/2006 Baseline Inspections 10/30/2006 11/03/2006 Baseline Inspections This report does not include INPU and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

I

Page 2 of 2 0511812006 13:09:47 Report 22 Indian Point 2 Inspection / Activity Plan 05/01/2006 - 09130/2007 Unitc A

i Numberl ) nsrpection Activity III Title rko. of Staffir Planned Dates Inspection Site Start End Type 7111401 2

IP 7111401 2

IP 71151 7111405 2

IP 7111405 71121 2

IP 7112101 2

IP 7112102 2

IP 71151 7111121 2

IP 7111121 2

IP 7111121 2

IP 7111121 2

IP 7111121 71121 2

IP 7112101 2

IP 7112102 71121 2

IP 7112101 I

- EXERCISE EVALUATION & EP P! VERIFICATION Exercise Evaluation Performance Indicator Verification

- FOLLOWUP INSP FOR NEW ANS SYSTEM Correction of Emergency Preparedness Weaknesses and Deficiencies

- OCC RAD SAFETY Access Control to Radiologically Significant Areas ALARA Planning and Controls Performance Indicator Verification

- CDBI Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection

- OCC RAD SAFETY Access Control to Radiologically Significant Areas ALARA Planning and Controls

- OCC RAD SAFETY Access Control to Radiologically Significant Areas 6

2 6

6 11/13/2006 11/17/2006 Baseline Inspections 11/13/2006 11/17/2006 Baseline Inspections 11/13/2006 1111712006 Baseline Inspections 12/18/2006 12/18/2006 12/18/2006 01/08/2007 01/22/2007 02/05/2007 02/12/2007 12/22/2006 12/22/2006 12/22/2006 01/12/2007 01/26/2007 02/09/2007 02/16/2007 Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections I

2 IP 7112102 ALARA Planning and Controls 7112202

- PUB RAD SAFETY - RADWASTE 2

IP 7112202 Radioactive Material Processing and Transportation 71121

- OCC RAD SAFETY 2

IP 7112101 Access Control to Radiologically Significant Areas 2

IP 7112102 ALARA Planning and Controls 101i EXM

- U2 OPERATOR LICENSING INITIAL EXAM 2

U01683 FY08 - INDIAN POINT 2 INITIAL EXAM 71121

- OCC RADIATION SAFETY 2

IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1

1 3

1 02/26/2007 03/02/2007 02/26/2007 03/02/2007 03/26/2007 03/30/2007 03/26/2007 03/30/2007 05/07/2007 05/11/2007 Baseline Inspections 07/16/2007 07/20/2007 07116/2007 07/20/2007 Baseline Inspections Baseline Inspections 09/03/2007 09106/2007 Not Applicable 09/24/2007 09/28/2007 Baseline Inspections This report does not include IN PU. and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

I

Page I of 2 0511812006 Report 22 Unit[s1 Number 13:11:18 Indian Point 3 Inspection I Activity Plan 05/01V2006 - 0913012007

_No. of Staff Planned Dates Inspection Son Site Start End l

Type I

lnslection Activity.1 Title 71121 3

IP 7112101 3

IP 7112102 7111405 3

IP 7111405 7112203 3

IP 7112203 7112203 3

IP 7112203 7112201 3

IP 7112201 71152B 3

IP 71152B 3

IP 71152B 7112203 3

IP 7112203 10123EXM 3

U01636

3.

U01636 7111405 3

IP 7111405 MODS 3

IP 7111102 3

IP 7111117(

7112203 3

IP 7112203 7111401 3

IP 7111401 3

IP 71151 7111405 3

IP 7111405 71121 3

IP 7112101 3

IP 7112102 3

IP 71151

- OCC RAD SAFETY Access Control to Radiologically Significant Areas ALARA Planning and Controls

- FOLLOWUP INSP FOR NEW ANS SYSTEM Correction of Emergency Preparedness Weaknesses and Deficiencies

- GROUNDWATER CONTAMINATION, DEV MEMO Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

- PUB RAD SAFETY - REMP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

- PUB RAD SAFETY - RETS Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

- PI&R Identification and Resolution of Problems Identification and Resolution of Problems

- GROUNDWATER CONTAMINATION, DEV MEMO Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

- OPERATOR LICENSING INITIAL EXAMS INDIAN POINT 3 INITIAL EXAM (FY 07)

INDIAN POINT 3 INITIAL EXAM (FY 07)

- FOLLOWUP INSP FOR NEW ANS SYSTEM Correction of Emergency Preparedness Weaknesses and Deficiencies

- MODS AND 50.59 Evaluation of Changes, Tests, or Experiments 3

Permanent Plant Modifications

- GROUNDWATER CONTAMINATION, DEV MEMO Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P

- EXERCISE EVALUATION & EP P1 VERIFICATION Exercise Evaluation Performance Indicator Verification

- FOLLOWUP INSP FOR NEW ANS SYSTEM Correction of Emergency Preparedness Weaknesses and Deficiencies

- OCC RAD SAFETY Access Control to Radiologically Significant Areas ALARA Planning and Controls Performance Indicator Verification I

05/0112006 05/05/2006 05/01/2006 05/05/2006 Baseline Inspections Baseline Inspections 2

1 1

2 3

1 3

2 4

06/05/2006 06/09/2006 Baseline Inspections 05/22/2006 05/26/2006 Baseline Inspections 06/12/2006 06/16/2006 Baseline Inspections 06/19/2006 06/23/2006 Baseline Inspections 09/18/2006 09/22/2006 Baseline Inspections 10/02/2006 10/06/2006 Baseline Inspections 09104/2006 09/08/2006 Baseline Inspections 09/25/2006 09/29/2006 Not Applicable 10/23/2006 11/03/2006 Not Applicable 10/02/2006 10/06/2006 Baseline Inspections 10/30/2006 11/03/2006 Baseline Inspections 10/30/2006 11/03/2006 Baseline Inspections 11/0612006 11/24/2006 Baseline Inspections 11/13/2006 11/17/2006 Baseline Inspections 11/13/2006 11/17/2006 Baseline Inspections 11/13/2006 11/17/2006 Baseline Inspections 1

6 3

I 12/18/2006 12/18/2006 12/18/2006 12/22/2006 12/22/2006 12/22/2006 Baseline Inspections Baseline Inspections Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

I

Page 2 of 2 05/1812006 Report 22 13:11:18 Indian Point 3 Inspection I Activity Plan 0510112006 - 0913012007 Unit [e Number I IN°. of Staffl [i11i~

Inspection Panon Site Dt Tyspetioe Start End l

Tp inspection Activity k F Title 71121

- OCC RAD SAFETY 3

IP 7112101 Access Control to Radiologically Significant Areas 3

IP 7112102 ALARA Planning and Controls 7111108P

- IN-SERVICE INSPECTION 3

IP 7111108P Inservice Inspection Activities - PWR 71121

- OCC RAD SAFETY 3

1P 7112101 Access Control to Radiologically Significant Areas 3

IP 7112102 ALARA Planning and Controls 7111111B

- L.O. REQUALIFICATION PROG÷P/F REVIEW 3

IP 7111111B Licensed Operator Requalification Program 7112202

- PUB RAD SAFETY - RADWASTE 3

IP 7112202 Radioactive Material Processing and Transportation 7111107

- HEAT SINK INSP 3

IP 7111107B.

Heat Sink Performance 71121

- OCC RAD SAFETY 3

IP 7112101 Access Control to Radiologically Significant Areas 3

IP 7112102 ALARA Planning and Controls 71121

- OCC RADIATION SAFETY 3

IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment I

1 I

3 02/26/2007 03/02/2007 Baseline Inspections 02/26/2007 03/02/2007 Baseline Inspections 03/19/2007 03/30/2007 Baseline Inspections 03/26/2007 03/30/2007 Baseline Inspections 03/26/2007 03/30/2007 Baseline Inspections 07/09/2007 07/13/2007 Baseline Inspections 05/07/2007 05/11/2007 Baseline Inspections 07/16/2007 07/20/2007 Baseline Inspections 07/16/2007 07/20/2007 Baseline Inspections 07/16/2007 07/20/2007 Baseline Inspections 09/24/2007 09/28/2007 Baseline Inspections 1

I 1

1 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

I m