ML070880621

From kanterella
Jump to navigation Jump to search
E-Mail from Mclaughlin to Alp@Nyserda.Org, NRC Reactor Inspection Schedule for 1Q07
ML070880621
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/26/2006
From: Marjorie Mclaughlin
NRC/RGN-I/ORA/RSLO
To: Eddy P
State of NY, State of NY, Energy Research & Development Authority
References
FOIA/PA-2007-0080
Download: ML070880621 (7)


Text

[-VMar-j&e1 Mc6Laughlin - NRC Reactor Inspectiorn Schedule for 1Q07 Page 1-il From: Marjorie McLaughlin e-.

  • To: Alp @nyserda.org; jps @ nyserda.org; Paul-eddy@dps.state.ny.us Date: 12/26/2006 1:36:05 PM

Subject:

NRC Reactor Inspection Schedule for 1Q07

Dear Jack,

Alyse, and Paul:

Good Afternoon. I hope that you are enjoying a happy holiday season.

In an effort to improve the service we provide to our State partners, we are sending the Quarterly Reactor Inspection Schedule in a new format. Starting With this communication, we will be providing the schedule to you electronically, as an Adobe Acrobat file attached to an email. We hope that this will allow you to more easily save the schedule for future reference and to readily disseminate the information to your staff.

As such, this email forwards the NRC Region I 2007 reactor inspection schedules for the Indian Point, Nine Mile Point, Fitzpatrick, Ginna, and Millstone plants. The indicated start dates for these inspections have a good degree of certainty. However, please check with me for any inspections in which you are interested to ensure the schedule has not changed. Although the schedules encompass all of 2007, we will continue to provide updated schedules on a quarterly basis.

(Paul: The CDBI dates for Indian Point are listed on the schedule)

Please provide me a list of the inspections you wish your staff to observe, as well as a point of contact (and contact information) for each requested inspection. I will coordinate the necessary logistics, inspection dates, and accompaniment protocol with the point of contact and the appropriate Region I Branch Chief.

Please note that Duncan White, the Region I State Agreements Officer, provided the inspection schedule for our radioactive materials licensees under separate communication. He will be the point of contact for accompaniment on materials inspections.

If you have any questions, do not hesitate to send me an email or call me on my office or cell phone.

Fondly, Marjorie Marjorie McLaughlin Regional State Liaison Officer USNRC Region I 610-337-5240 (Office) 484-919-2198 (Cell) 610-337-5354 (Fax)

CC: Nancy Belmore 11

I e McLaughlin - Indn Point 2.pdf Page 11 Page I of 4 Indian Point R1=11=6 11:22:02 Inspection / Activity Plan Report 22 01/01/2007 - 12131/2007 I--rI- Ilr~ek~ A~lvtv rI Title ilronSItet I Start End NI "r;o II 7111121 -COBI 2 IP 7111121 Comrnpo Desig, Be.oo Inspecti-o 0106j2007 Basdino Inspecltions 2 IP 7111121 Cornp.orr. Design Bases Iapeclion Baseline troporlona 0`11122=

2 IF 7111121 C-orponooWDesign Bases Inipeolr 02112=007 Bassinooboopootior 2 1P 7111121 Corponerl Design BRes Inspeolon Basei~ne Irorpoolooo ISFSI ISFSIINSPECTIONS 2 IP 6O854.1 Proporaton TestingofIndependen Sport Fud Storage FacilityItallation atOCperatlngF 0101r=~0 22VlI07 Other RopAio 7111405 - FOLLOWUP NSP FOR NEW ANS SYSTEM 2 IP 7111405 Correolion of Emrrgn-ry Prepredness Weokneosoes ad Defioiejciet 01122Q=S 0lb/2Y20(7 Other Ratino DEV MEMO - GROUND WATER CONTAMINATION( DEV MEMO 2 IP 7112203 RadclogicaJ Enolronmnant Moritori Program (RE1MP)And Raidaoeoive MatorialCortrof F Q2W20D7 022CVO Other R.OAio 71121 - OCC RAD SAFETY 2 IP 7112101 Access Cortrd to Radiological] y Silifogni Ara, 02)2Sr2= 1522'O Baseline Iropedoosor 2 IP 7112102 ALARAPlFning andl Controls 02/2V"7 0222M22 Basoline Inspections 71121 -OCC RAD SAFETY 2 IP 7112101 Acceso Cono rd toRadotogicall y Significnt Areas 03r22,= 22/223 7 Baslnetn Irmpetion 2 IF 7112102 ALARAplanning and Controls 031,6 03110/0V Bselotn Iropections ROP 8-2 - 2ND QTR INTEGRATED RESIDENT INSPECTION 2 IF 7111101 Ado. Weather PF etiaUon 04101r=S Baselinabroopoollor 2 IP 7111104 EqLipmore AJignent (Quarterly) 04DIi=S Bonolire Inspections 2 IP 7111104S Equipment Alignmert 0410lrlZO7 Basolino Irorpooions 2 IP 7111105Q FiroProloetion - Cuorlorly 04101r= Baseline Iropeolions 2 IP 7111106 Flood protectionrMeasures 04'0=7 Basolino Inspeotions 2W20027 2 IP 7111107A Heal Sink performn-e BassoineInapootions 04miriv 2 IP 71111110 Uoensod Operator Rorotifioollon program Rooollno Inspootiorns 2 IP 71111120 Mairnoranoo Elloollveroso 0401/25 gaoli~ne boopecboror 2 IP 7111113 Mairloranoo RiskoAssessmenrs and Emergert Work Control Boootino Inspections 04VDl25G7 2 IP 7111115 Operablity Evalualions Boooline inspectiorns 2 IF 7111117A permanent P1.1t Modifioalior 04101/207 Booeline Inspections 20&'020V 2 IP 7111119 Post Mairterorce Testing Booeline Inspections 260025W 2 IP 7111122 Survellaonre Teoting Boootino Inopootioror 2 IP 7111123 Temporrry Plari Modificaions 04//0027 Baaotno Inspecotiorns 2 IF 7111406 DrillEvasilion Boooiioo Inspectionsr 2 IP 71152 klentilcoion and Reoludion of PFroilto 20502007 Boodlno Inspectiorns 2 IP 71152B kIertificatio and Resdut on Problerns SM201J57 Boslne Inspectionsor Ins rqort C~ Too1,0000 rNrrJ 00 tO) RUt otlOItlon.

TNi. reorol ohm.oorty n-oiltolan anourtoeo inspectionprwcOAro. It

I-Mqarhior;ie-McLauahlin - Indian Point 2.odf ~4t PaIe 2*14 Indian Point 11=110)(16 Inspection / Activity Plan Report 22 01/01/2007 - 12f31/2007 EI-i*b INOtlSt affh Plned Dates i INwnber Iscio c Tite on Site Start -End ROP 8-2 - 2ND 0TR INTEGRATED RESIDENT INSPECTION 2 2 IP 71153 Followup of Everts ard Notic 0oErloroerorer DisCretio 04001r2=7 043Dy7 Bosellrr liropectlo TRUFIRE -TIRIENMAL RRE PROTECTION INSPECTION 3 2 IP 7111105T FiroProtesion [Trieorial] =2i3Q= 04127r2= Bwellee tralonlorm 2 IP 7111105T Fire Proleotion [Trieniall 0&4rl4= DY11O.07 Becelrn bepeotiore 7111405 - FOLLOWUP INSP FOR NEW ANS SYSTEM 2 IP 7111405 Correction lEmoergeary Properoredas Weaknese ard Deficieoies 04r2ld27 0404'2 Olher Roirro 7112202 PUB RAD SAFETY - RADWASTE 2 IP 7112202 Radioactlve Material Proeessing ard Treortation 041/00727 0&11/r2=1 Berellr Irsopeeiors DEV MEMO - GROUND WATER CONTAMINATIONW DEV MEMO 2 IP 7112203 Radc*nogica Enirormortal Moritoring Progerr (REMP) Ard Radoactive MaterialCortrd F 050=/17 042277- Other R.alir ROP 8-3 - 3RD 0TR INTEGRATED RESIDENT INSPECTION 2 IP 7111101 AdversoWe, oho Prolection 04101/210G7 OB4JY Baserle Ir*peotiora 2 IP 7111104 Equiplnet AJignort (COorterly) Owl0/=10 04rjy Basolne Im mpetior 2 IP 7111104S Equipmert Ailgnenrt 04101/537 015302107 2 IP 71111C05 Fire Proteoction- QCoartly 0oavrw Baseline Imrpectiors D0rdy 2 IP 7111106 Flood Protectlon Mssucees 06101=7 Base/va- Inpoet/or 0a53207 2 IP 7111107A Hel SirPerformnero 04VIra7 Basel!- Imp*eotiore 2 IP 71111110 Uceoed Operator Rerpification Progrm 0410= Baseline Irepentio.

2 IP 71111120 Moirtenance Eleoctiver-e 0410I/m7 Base/h* Iap.erioro 2 IP 7111113 Mairtnrare Risk Assessmeorts ad Emegern Work Cortol MV420V7 Baselin Imr*ateora 2 IP 7111115 Opoerility Evalutaiors 06101221)77045320D7 Baseine Impeoctiors 2 IP 7111117A Permerert Plant Modilcatlora 041012=0 080y= BoInv Imopect/on 2 IP 7111119 Post Malrtoiae Testirg 04101040 045320 Basne/r Impwteor 2 IP 7111122 Surveillaneo Tostiig 04101/2007 04'102077 Bans/rie Inrpeo:Sor Basaine Imrpoltiorn 2 IP 7111123 Teorporary PlaFt Modeloftfors 06" =7~ 045320 Basel/e Irpsot-iora 2 IP 7111406 DrillEveluation 04101/Fi` 0404w=

Baselie Irspeotiorm 2 IP 71152 Idertification and Resolcuion dPro,,ms 0410172107 ar0=73 2 IP 71152M Idertilicatio and Resoludon ofProbems 04101/210Y70404w= Baselin Irnpecti-on 2 IP 71153 Fowoup of veotts ard Notlice o Erforerr'ert Diseretion 06101/2107 oa404= Basel-n Im poctiore 71121 -OCC RAD SAFETY 2 IP 7112101 Access Cortrol to Radologicall y Sigificant Areis 07116/,007 0712Y2007 BasolirlIpeotlor 2 IP 7112102 ALARAPlanring aod Cortrols 07/1620(7 071212007 Boaselva Impect/orn 115 EXM - 12 OPERATOR UCENSING INITIAL EXAM 2 U0I683 FY08 - INDIANPOINT 2 INITIALEXAM 101012=07 110122=07 Not Applicoae runrqerrt roe Irorofle lNru ore] toi~ Alit ecoiloan.

TN. report eohmsorty err-siloard oero-rced irpeotimnprocedroes. i

Marjorie IlcLauahlin - Indian Point 2.Ddf

-~

Pacle 3 1 Page 3 of4 Indian Point lWMI 11:250 Inspection / Activity Plan Report22 01101/2007 - 12/31/2007 F-unf -

IuMilbar 0 IneaLoefln Acthiito hi Title hion Site HII

'IE1ol SPlanned tr DEn al IF TiTwee I I

11/5 EXM -L12 OPERATOR LICENSING INITAL EXAM 4 U01683 FY04 - INDIANlPOINT 2 INITIALEXAM 1IA110EI7 I11lW'007 Ndt Applicable 71114 - EP PRGM INSP IP 7111402 AJertand Nflifialon Syston Testling 09`17=237 Baselre Irepectiora IP 7111403 Emergeroy Response Organizatin Augnertat[mi Tetring 09'17/2D27 Baselne Inspectio IP 7111404 Emergercy Acion Luvd and Emergency Plan Charges 0iti71207 ns2van7 Baone/le- Ipectiorl Bone/no Irepectiores IP 7111405 Correctionof Emaergooy Prepero4,ea. Weeknees arid Doiciercies 091171207 Baseline Inpectiona IP 71151-EP01 Drill/Exerui-ePel*mnnee 09uI/1O720 Basoim Irspections IP 71151-EP02 ERO DrillPartilipatio 09117r=7 012I/M7 Beselin Irmpectiore IP 71151-EP03 Alt &Notilicllon System 0917=7 71121 -OCC RADIATION SAFETY IP 7112103 Radiation Moritoring Istrulnoatoion and Protective EquApment 042407 0121=7 Basnele Inspectiorm ROP 8-4 -4TH 0TR INTEGRATED RESIDENT INSPECTION IP 7111101 Adverse Weaer Prolectioo IO/00~7 IP 7111104 Etipmnel Mignre (ualertly) 00120047 Baslne Inapections IP 7111104S ErItipmeet Alig-arl 1004/557 120Y2007 Bosnelr Inspectiome IP 71111050 Fire ProleWt -DOtarloly 1001/2DD7 Basne!r Irepectiorm IP 7111106 Flood Protectio Meeasres 1051/57 Basare Irapectlor Beau/el Irepeclome IP 7111107A Heal Sink Performauce 1001120 IP 71111110 Ucenwed Operator RequaplficalionProgra 105115507 1231=05 Baseline Impeetio IP 71111120 Mairtenance Effectiveumes 10511507 Bmne/re rIpectiore 12/02 IP 7111113 Mairtenane RlskAssessmenl and Emergend Wrk Codrol MOM=55 IP 7111115 Operablity Evaluatione 10101/=57 12/30=

IP 7111117A Pen rne Plart Mociffloiota 100112007 Besdine Irepectiorm IP 7111119 Poet Mairtertince Testirig 1001/=5 Baselne InStpecore IP 7111122 Survoeill*reoTewtlig IMI1/557 Baseine Inpectiors IP 7111123 Tnporary Plait Modificaione 1051/55 Baaline Irepectior*

IP 7111406 DrillEvaluati-l 1051155 IP 71152 Idetificatiom and ReOeolilonof Problene 1001/=5 Banel-ne Inpections IP 71152 Idertication and Resolution of Proeb e Moil=55 Baselare Irmpeftiore IP 71153 Fowloup it Evnt ard Notices ol E,4occernt Discrelton 105101= Beau/nle lrupee/one 7112203 - GROUINDWATER CONTAMINATIONVE V MEMO IP 7112203 Radiogical Enuironmeala MonitorireProIram (REMP)Ad RadioactiveMaterial Courld F 11/05P2007 11,VW2D07 Other Routine I True,~-ot ,u-,o urn ,re.hle Opt) nni CII1TAflF,e4,etion 6 Th; report a/oweudy orsieelaide enooiroed nepecimo procedures II

Marjorie McLauqhlin - Indian Point 2.pdf Pagje 4Q1 Page 40of4 Indian Point l2!WAM 11:250 Inspection / Activity Plan Report 22 0110112007 - 12=3/2007 wr-e I Irsoctorl ActvIty h ,.I TWtl Thion Sitolfl Start PlneI End at~st I Ip 71111.12 -MAINTENANCE RULE 2 2 IP 7111112B Msrtenece Effectiveriess l2/IO'aD7 12/142=1 Basefirm hmpectc TN. report Aoo rt no(.1 iIdNP0 and OUTAGIEactivities, THs report staw. orty or-sito and arrreoo repeetin procedures. b

Ma.rjorilcLaughlin - Indian Point 3pd Paqe lil PageI of2 Indian Point 3 lot&20 11:252 Inspection / Activity Plan Report22 011/01/2007 - 1213112007 FIR-11 I Nwnber Ilnsoection Activity Ili Title an Site Start End Type I1I -I INSPECIONS Ibb 3 IP 608541 Prooperaona of Irdilort Testingdld Speon Fuel Storage Facility latallation a Operating F 01AM0lI7 0131lIrW7 Olhw ROL~ine 711405 - FOLLOWUP INSP FOR NEW ANSSYSTEM 3 IP 7111405 Correction of Emergency Proledrodnse Weaknreses and D oricronlo 01I022rD7 01/752627 CtherRoOine DEVMEMO GROUND WATER CONTAMINATIONI DEVMEMO 3 IF 7112103 RadcatkonMoniloring Intrumiation ard Proteetive Equipment =52=E OZ202tX7 Olier Rodino 71121 - OCC RAD SAFETY 3 IP 7112101 Access Conrtd to Racdologically Sigrifiar Arme 022Y2007 0=2120(7 BElawarrIrepoelioro 3 IP 7112102 ALARAPlanning and Controls 02'75=7 03212/M7 Bradit- IreIpeoio 7111108P IP3 IN-SERVICE INSPECTION 3 IP 7111108P Inorioo Impaction Activities - FWR 0112l0~7 032Y200d7 BosellcoIralOollor 71121 -OCC RAD SAFETY 3 IP 7112101 Access Cotrod to Radologeall y Significant Arsem 032IM21)(17 03G2t727 BasdclioIrapectlore 3 IP 7112102 ALARAPlarnnng ard Corroed 03rX.= 03rt75!W Basdine 1-rauiecr TI-166 - CONTAINMENT SUW MODIFICATIONS 2 3 IP 2515166 Presourrozd Water Rmeotor Cortalonme, S&mp Sokago (NRC GENERIC LETTER 23o4-02 O4M0K07 OW00I W Ealay Inauee 7111405 FOLLOWUP INSP FOR NEW ANSSYSTEM 3 IP 711140 Correction of Emrgenry FrePrprwe e Wosleasosid DiclcO esolo O4r24rM7 =262W~ Other RorLAno 7112202 - PUB RAD SAFETY - RADWASTE 3 IF 7112202 Radioactivo Material Pronoing ard Trarlaporllion 02V7,= 05/11/207 Baskal Iragectiors DEVMEMO - GROUND WATER CONTAMINATIOND0EVMEMO 3 IP 7112103 Radiation Mortoring Irum-ertation and protective Egupmernt 062I4r7 0215111207 COffieRoEno 7111107 -NEAT SINK INSP 3 IP 7111107B Heat girk Paeror-ro 2r7/16/112 07l75=7 BonolinIrnynctlcra 71121 -OCC RAD SAFETY 3 IP 7112101 Aos. Cortrd to Racologlcadl y Sigrlicair Arm 07/162DI 07111202D7 Basdino IraIpooyore 3 IP 7112102 ALOARA Rlanring ad Cortrole a7/11111207 07/02Y=17 Beadino Irapoctior.

71114 - EP PRGM INSP 3 IP 7111402 Ajlet ard Notfication SystemnTesting 09/72I)7I Boendin Irapectiors 3 IP 7111403 Eorerg"*vy Reponrse Orgwiration Augroeraion Tesling 09117/217 0W21/112 Bandine Iropeothor 3 IP 7111404 Emergancy AotionLewe ard Enrorgency plan Chleg.s 09M7l2I07 Baseline Inmpectiore 0W2112027 3 IP 7111405 Correction of Emregernry Prepaorenss Wesooel s and Ddicoierieo 09117rXW Basai. Iropectiora 751210127u 3 IP 71151-EFO1 Drill/ExercisePerlornmarne 09117=07 Baselne Irapetiora 3 IP 71151-EP02 ERO Drillparticipation 09117/207 Baseline Inspecion 0V21120(7 Basalino I.po:tions 3 IP 71151-E03 AJert &Notfication Syaletr 0217/20C7 I TN. r~l ~ on 0,001. INFO so, OIJTAGF .ctioilios ITn op.o h-aS *d o-nits ad amed iepectionp~oalree II

Marjrie McLaughlin - Indian Point 3.pdf Page 201

. ., , , I Peg. 2of 2 Indian Point 3 12!A26 11:25:28 Inspection / Activity Plan Report 22 0110112007 - 12/31/2007 F-Unh--h I Number lnonectlon Activity hi Title lionStte Ii Start End i Tv. I 4

71121 - Ui* ,AUATXJN SAFETY 3 IP 7112103 Radaiion Moritoring truerlnoone and Protective Ecoprner 09264rA W28=67 Bitoeir trupectior 7111111B LO. REOUALICICATION PROG+PIF REVIEW 3 IP 7111111B Uonred Operator Relo*lifioalon Progrm Oa?4r2C7 W28=67 B-itreio 1repooti 7111121 -CDBI 3 IP 7111121 Cnpopri Design B.o. Irepoti- l(YOl12O7 htY2OD7 Bwimoovlrpeohlorm 3 IP 7111121 Compo..rl Dosig, B..e Iropoion 101156AW 16/1SO7 itoeehro Iropoolo, 3 IP 7111121 C ponort Dosig B.-e Inpetdion 10'2Y2O7 I IXZ7 Bi-oein Irepeohlooe 3 IP 7111121 Comporne Dosig, B.-es Inspoion II/&W I 1/O2O007 Baselneiv rspeotbor 7112203 - GROUNDWATER CONTAMINATION, DEV MEMO 3 IP 71122M Racdologicd Emniror-letal Moritroirn Program (REMP) Akl Rracioactive Materil Corted P 11l061A7 11/02007 C31ooRooLto 71111.12 -MAINTENANCE RULE 3 IP 7111112B Mainrten Elfe4tivo 121l02D7 12/142=7 Pedt IropwOtore I TN. roont r~ too innkrle IWO 001 O&JTAOFortinitbon Thia reportam ripo -to ard ar-roo odopmmroedrs I