IR 05000286/2021402
| ML21125A279 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 05/05/2021 |
| From: | Fred Bower Decommissioning, ISFSI, and Reactor Health Physics Branch |
| To: | Vitale A Entergy Nuclear Operations |
| Bower F | |
| References | |
| IR 2021402 | |
| Download: ML21125A279 (6) | |
Text
May 5, 2021
SUBJECT:
INDIAN POINT ENERGY CENTER, UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05000286/2021402
Dear Mr. Vitale:
On April 19, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Energy Center, Unit 3 and discussed the results of this inspection with Mr. Robert Walpole, Director of Licensing, and other members of your staff. The results of this inspection are documented in the enclosed report. Remote inspections were completed on April 19, 2021, and onsite inspections were completed on April 15, 2021.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Fred L. Bower, III, Chief Security, EP and Incident Response Branch Division of Radiological Safety and Security
Docket No. 05000286 License No. DPR-64
Enclosure:
As stated
Inspection Report
Docket Number:
05000286
License Number:
Report Number:
Enterprise Identifier: I-2021-402-0067
Licensee:
Entergy Nuclear Operations Inc.
Facility:
Indian Point Energy Center, Unit 3
Location:
Buchanan, NY.
Inspection Dates:
April 14, 2021 to April 19, 2021
Inspectors:
D. Caron, Senior Physical Security Inspector
K. Hussar, Senior Physical Security Inspector
Approved By:
Fred L. Bower, III, Chief
Security, EP and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Indian Point Energy Center, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection on April 15, 2021, unless otherwise noted. Additionally, remote inspections were completed on April 19, 2021, and onsite inspections were completed on April 15, 2021. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and onsite. The inspections documented below met the objectives and requirements for completion of the IP.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure element:
Protective Strategy Evaluation (1 Sample)
- (1) The inspectors observed an annual Force-on Force exercise to verify implementation of the Performance Evaluation Program sample.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 19, 2021, the inspectors presented the security baseline inspection results to Mr. Robert Walpole, Director of Licensing, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-IP3-2021-
00328
CR-IP3-2021-
00398
Corrective Action
Documents
Resulting from
Inspection
CR-IP3-2021-
00960
CR-IP3-2021-
00961
Procedures
General Employee Security Responsibilities
Revision 2
IP-SMM SEC-103
IPEC Security Plan Implementation
Revision 8