IR 05000247/2019403

From kanterella
Jump to navigation Jump to search
Cyber Security Inspection Report 05000247/2019403 and 05000286/2019403 (Cover Letter Only)
ML19309E369
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2019
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Vitale A
Entergy Nuclear Operations
Dentel G
References
IR 2019403
Download: ML19309E369 (3)


Text

ber 5, 2019

SUBJECT:

INDIAN POINT NUCLEAR GENERATING, UNITS 2 AND 3 - CYBER SECURITY INSPECTION REPORT 05000247/2019403 and 05000286/2019403

Dear Mr. Vitale:

On October 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating, Units 2 and 3 and discussed the results of this inspection with Mr. John Ferrick, General Manager of Plant Operations, and other members of your staff.

The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. Additionally, NRC inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2.a of the Enforcement Policy.

A cross-cutting aspect was assigned to a finding in the area of Human Performance.

Specifically, because Entergy failed to create and maintain complete, accurate, and up-to-date documentation, [H.7].

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at Indian Point. In addition, if you disagree with a cross-cutting aspect Enclosure transmitted herewith contains Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. assignment, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at Indian Point.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000247 and 05000286 License Nos. DPR-26 and DPR-64 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV cc w/encl:

D. Gagnon, Site Security Manager A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority ML19309E369 (Cover letter)

ADAMS ACCESSION NUMBER: ML19309E362 (Cover letter w/enclosure-NP)

Cover Letter Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS RI/DRP RI/DRS NAME DWerkheiser DSchroeder GDentel DATE 11/5/19 11/4/19 11/4/19