ML23338A226

From kanterella
Jump to navigation Jump to search
Signed Amendment No. 27 to Indemnity Agreement No. B-19
ML23338A226
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/04/2023
From: Fleming J
Holtec Decommissioning International
To: Sturzebecher K
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
HDI-IPEC-23-056
Download: ML23338A226 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 140.11 December 4, 2023 Document Control Desk Attn: Karl Sturzebecher, Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Indian Point Energy Center Provisional Operating License No. DPR-05 Renewed Facility License No. DPR-26 and DPR-64 NRC Docket Nos.50-003, 50-247, 50-286 and 72-051

Subject:

Signed Amendment No. 27 to Indemnity Agreement No. B-19 In accordance with 10 CFR 140.11(a)(4) Holtec Decommissioning International, LLC (HDI) is providing the U.S. Nuclear Regulatory Commission (USNRC) the signed copy of Amendment No. 27 to Indemnity Agreement No. B-19 for Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC.

If you have any questions, or need additional information, please contact me at 856-797-0900 x3578.

Respectfully, Jean A.

Digitally signed by Jean A. Fleming DN: cn=Jean A. Fleming, c=US, o=Holtec Decommissioning International, LLC, ou=Regulatory and Fleming Environmental Affairs, email=J.Fleming@Holtec.com Date: 2023.12.04 13:07:05 -05'00' Jean A. Fleming Vice President, Licensing, Regulatory Affairs, & PSA Holtec International

Enclosure:

1. Signed Amendment No. 27 To Indemnity Agreement No. B-19 Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC Indian Point Energy Center Docket Nos.50-003, 50-247, 50-286, and 72-051

References:

1. Letter, Indian Point Energy Center Generating Units 1, 2, and 3 - Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance and Amendment No. 27 To Indemnity Agreement No. B-19 (EPID L-2022-LLE-0012) dated November 16, 2023 (ML23100A143) 1 of 2

,//W

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 cc: NRC Regional Administrator - NRC Region I NRC Project Manager, NMSS - IPEC NRC Region 1 Lead Inspector, Indian Point Units 1, 2 & 3 New York State Department of Public Service New York State Liaison Officer Designee, NYSERDA 2 of 2

,//W

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 ENCLOSURE 1 6LJQHG$PHQGPHQW1R7R,QGHPQLW\$JUHHPHQW1R

%+ROWHF'HFRPPLVVLRQLQJ,QWHUQDWLRQDO//&+ROWHF

,QGLDQ3RLQW//&DQG+ROWHF,QGLDQ3RLQW//&,QGLDQ

3RLQW(QHUJ\&HQWHU'RFNHW1RV

DQG

HDI-PIL-23-009 HDI-IPEC-23-050

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 Docket Nos.50-003 50-247 50-286 72-051 AMENDMENT TO INDEMNITY AGREEMENT NO. B-19 AMENDMENT NO. 27 Effective November

_____ 16, 2023, Indemnity Agreement No. B-19 between Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, Holtec Indian Point 3, LLC, and the United States Nuclear Regulatory Commission, dated January 12, 1962, as amended, is hereby further amended as follows:

Article VIII of the Indemnity Agreement is deleted in its entirety wherever it appears in the Indemnity Agreement, and is substituted therein by the requirements of the exemption permitting a reduction in primary financial protection from $450,000,000 to $100,000,000, and withdrawal from participation in the secondary layer of financial protection.

Item 2a of the Attachment to the Indemnity Agreement is deleted in its entirety and the following substituted therefor:

Item 2 - Amount of financial protection

a. $100,000,000 (From 12:01 a.m., November

_____ 16 _ , 2023)

In light of the above, Indemnity Agreement No. B-19 is between "Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, Holtec Indian Point 3, LLC," and the United States Nuclear Regulatory Commission.

FOR THE UNITED STATES NUCLEAR REGULATORY COMMISSION Kenneth M. Kline, Acting Chief Financial Assessment Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards