Annual Assessment Letter (Report 05000247/2011001 and 05000286/2011001)
ML12061A159
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/05/2012
From: Mel Gray
Reactor Projects Branch 2
To: Ventosa J
Entergy Nuclear Operations
Shared Package
ML12058A402 List:
References
FOIA/PA-2016-0148 IR-11-001
Download: ML12061A159 (8)


Text

March 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER - INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORTS 05000247/2011001 AND 05000286/2011001)

Dear Mr. Ventosa:

On February 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the plant performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Also, we have scheduled a review of your proposed commitments made during the license renewal application process, regarding Indian Point Unit 2. This activity will include an inspector review of Aging Management Program (AMP) implementation and will be conducted using Temporary Instruction 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your voluntary actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The Temporary Instruction is available on the NRC Web site at:

http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf The NRC previously budgeted and completed inspections at Indian Point Units 2 and 3 considering each unit as a single reactor site. This approach was based on the historical differences involving ownership and operation of each unit by different utilities with separate organizations. Since 2001, Entergy has been the sole owner and operator of Indian Point Units 2 and 3, and has consolidated and implemented plant programs and processes. As a result, insights from our inspections on one unit are generally applicable to the other unit. Beginning January 1, 2012, the NRC implemented a modified inspection program that performs major team inspections, with the exception of licensed operator programs and triennial fire protection inspections, on a site basis verses a unit basis. This is reflected in the attached inspection plans for Indian Point Units 2 and 3 which have team inspections scheduled concurrently on both units. The NRC will monitor the results of these team inspections and inform you regarding changes to our inspection plans in the future. Additionally, beginning with the 2012 mid-cycle assessment, the NRC will assess your performance with regard to cross-cutting issues on a site basis instead of a unit basis. The resident inspector staff and their inspection activities are not affected by these changes.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management Systems (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief

Projects Branch 2

Division of Reactor Projects

Docket Nos.

50-247; 50-286 License Nos. DPR-26; DPR-64

Enclosure: Point 2 & 3 Inspection / Activity Plan

cc w/encl: Distribution via ListServ

ML12061A159

SUNSI Review

Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP

NAME SMcCarver BBickett/SMc for MGray

DATE 02/27/12 02/27/12 03/01/12 Distribution w/encl:

(via E-mail)

W. Dean, RA D. Lew, DRA J. Tappert, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP P. Cataldo, SRI M. Catts, SRI A. Ayegbusi, RI M. Halter, RI D. Hochmuth, AA DRS Branch Chiefs (6)

D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource

Page 1 of 2 02/27/2012 14:26:18 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 01/01/2012 - 06/30/2013 2/6 EXAM

- IP2 INITIAL EXAM

2 FY-12-IP2 INITIAL OPERATOR LICENSING EXAM U01844 01/09/2012 01/13/2012

FY-12-IP2 INITIAL OPERATOR LICENSING EXAM U01844 02/06/2012 02/10/2012 2516-001

- TI 2516-001 LR COMMITMENT INSP PHASE I

2 IP Review of License Renewal Activities 2516/001 03/04/2012 03/08/2012 71124

- HP

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012

IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 7111108P

- INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/12/2012 03/23/2012 2561

- SAFSTOR INSPECTION

1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/04/2012 06/08/2012

IP Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 37801 06/04/2012 06/08/2012

IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 40801 06/04/2012 06/08/2012

IP Maintenance And Surveillance At Permanenly Shutdown Reactors 62801 06/04/2012 06/08/2012

IP Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 71801 06/04/2012 06/08/2012

IP Occupational Radiation Exposure 83750 06/04/2012 06/08/2012

IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 84750 06/04/2012 06/08/2012

IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 86750 06/04/2012 06/08/2012 71124

- REMP

2 IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 TI 182

- DEGRADATION OF UNDERGROUND PIPING

2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/09/2012 07/13/2012 7111111B

- IP2 REQUAL INSP W/ P/F RESULTS

2 IP Licensed Operator Requalification Program 7111111B 09/17/2012 09/21/2012 71124

- HP

2 IP Operation Of An ISFSI 60855 07/16/2012 07/20/2012

IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/16/2012 07/20/2012

IP Occupational ALARA Planning and Controls 71124.02 07/16/2012 07/20/2012

IP Occupational Dose Assessment 71124.04 07/16/2012 07/20/2012 7111107T

- TRIENNIAL HEAT SINK

2 IP Heat Sink Performance 7111107T 07/23/2012 07/27/2012 EP EX

- EP EXERCISE EVALUATION

2 IP Exercise Evaluation 7111401 10/01/2012 10/05/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/27/2012 14:26:18 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 01/01/2012 - 06/30/2013 EP EX

- EP EXERCISE EVALUATION

2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/01/2012 10/05/2012 7111121

- CDBI

2 IP Component Design Bases Inspection 7111121 10/15/2012 10/19/2012

IP Component Design Bases Inspection 7111121 10/29/2012 11/02/2012

IP Component Design Bases Inspection 7111121 11/05/2012 11/09/2012 92702

- FOLLOWUP TO CONFIRMATORY ORDER (QA/QC)

2 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 71124

- HP

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2012 11/09/2012

IP Occupational ALARA Planning and Controls 71124.02 11/05/2012 11/09/2012

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2012 11/09/2012 71124.07

- RETS

2 IP Radiation Monitoring Instrumentation 71124.05 01/14/2013 01/18/2013

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/14/2013 01/18/2013 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION

2 IP Fire Protection [Triennial]

7111105T 01/28/2013 02/01/2013

IP Fire Protection [Triennial]

7111105T 02/11/2013 02/15/2013 ISFSI

- ISFSI LOADING

2 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 71124

- HP

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013

IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 EP PROGR

- EP PROGRAM INSPECTION

2 IP Alert and Notification System Testing 7111402 05/20/2013 05/24/2013

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/20/2013 05/24/2013

IP Emergency Action Level and Emergency Plan Changes 7111404 05/20/2013 05/24/2013

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/20/2013 05/24/2013 2516-001

- TI 2516-001 LR COMMITMENT INSP PHASE II

2 IP Review of License Renewal Activities 2516/001 06/03/2013 06/07/2013

IP Review of License Renewal Activities 2516/001 06/17/2013 06/21/2013 PI&R

- PI&R

2 IP Problem Identification and Resolution 71152B 06/10/2013 06/14/2013

IP Problem Identification and Resolution 71152B 06/24/2013 06/28/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 1 of 2 02/27/2012 14:27:04 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point 3 Inspection / Activity Plan 01/01/2012 - 06/30/2013 71124

- HP

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012

IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 71124

- REMP

3 IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 ISFSI

- ISFSI - WET TRNSFER DRY RUN ACTIVITIES

3 IP Preoperational Testing Of An ISFSI 60854 07/01/2012 08/30/2012 TI 182

- DEGRADATION OF UNDERGROUND PIPING

3 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/09/2012 07/11/2012 71124

- HP

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/16/2012 07/20/2012

IP Occupational ALARA Planning and Controls 71124.02 07/16/2012 07/20/2012

IP Occupational Dose Assessment 71124.04 07/16/2012 07/20/2012 7111107T

- TRIENNIAL HEAT SINK

3 IP Heat Sink Performance 7111107T 07/23/2012 07/27/2012 EP EX

- EP EXERCISE EVALUATION

3 IP Exercise Evaluation 7111401 10/01/2012 10/05/2012

IP Emergency Action Level and Emergency Plan Changes 7111404 10/01/2012 10/05/2012 2/11 EXM

- IP3 INITIAL EXAM

3 FY-13 IP3 INITIAL OPERATOR LICENSING EXAM U01866 01/14/2013 01/18/2013

FY-13 IP3 INITIAL OPERATOR LICENSING EXAM U01866 02/11/2013 02/15/2013 7111121

- CDBI

3 IP Component Design Bases Inspection 7111121 10/15/2012 10/19/2012

IP Component Design Bases Inspection 7111121 10/29/2012 11/02/2012

IP Component Design Bases Inspection 7111121 11/05/2012 11/09/2012 92702

- FOLLOWUP TO CONFIRMATORY ORDER (QA/QC)

3 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 71124

- HP

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2012 11/09/2012

IP Occupational ALARA Planning and Controls 71124.02 11/05/2012 11/09/2012

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2012 11/09/2012 71124

- RETS

3 IP Radiation Monitoring Instrumentation 71124.05 01/14/2013 01/18/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/27/2012 14:27:04 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point 3 Inspection / Activity Plan 01/01/2012 - 06/30/2013 71124

- RETS

3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/14/2013 01/18/2013 7111108P

- U3 INSERVICE INSPECTION

3 IP Inservice Inspection Activities - PWR 7111108P 03/18/2013 03/29/2013 71124

- HP

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013

IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 EP PROGR

- EP PROGRAM INSPECTION

3 IP Alert and Notification System Testing 7111402 05/20/2013 05/24/2013

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/20/2013 05/24/2013

IP Emergency Action Level and Emergency Plan Changes 7111404 05/20/2013 05/24/2013

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/20/2013 05/24/2013 PI&R

- PI&R

3 IP Problem Identification and Resolution 71152B 06/10/2013 06/14/2013

IP Problem Identification and Resolution 71152B 06/24/2013 06/28/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.