Mid-Cycle Performance Review and Inspection Plan 2011 - Indian Point Nuclear Generating Units 2 and 3
ML112420836
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/01/2011
From: Mel Gray
Reactor Projects Branch 2
To: Joseph E Pollock
Entergy Nuclear Operations
Gray, Mel NRC/RGNI/DRP/PB2/610-337-5209
References
IR-11-006
Download: ML112420836 (7)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PENNSYLVANIA 19406-1415 September 1, 2011 Mr. Joseph E. Pollock, Site Vice President Entergy Nuclear Operations, Inc.

lndian Point Energy Center 450 Broadway, GSB Buchanan. NY 1051 1-0249 MID-CYCLE LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORTS 05000247t2011006 & 0500028612011006)

Dear Mr. Pollock:

On August 11,2011, the U.S. Nuclear Regulatory Commission (NRC) staff completed its mid-cycte plrformance review of Indian Point Nuclear Generating Units 2 and 3 (lndian Point). The f.iRC ieviewed the most recent quarterly performance indicators (Pls) in addition to inspection resufts and enforcement actions from July 1,2010, through June 30, zA11. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not inciude security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at lndian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31,2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to the baseline inspection program at Units 2 and 3, we plan to conduct independent spent fuel storage installation inspections (lSFSl) at Unit 2 using Inspection Procedure 60855.1,'Operation of an ISFSI at Operating Plantsl' Also, we have scheduled a review of your proposed commitments made during the license renewal application process regarding Indian Point Unit 2. This activity will include an inspector review of Aging Management Program (AMP) implementation and will be conducted using

J. Pollock Temporary Instruction 25161001, "Review of Licen$e RenewalActivities." The overall purpose of the review is to assess progress of your voluntary actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staffs safety evaluation report. The Temporary lnstruction is available on the NRC Website at:

http://pbad upws. n rc. q ov/d ocs/M L 1 1 06/M L 1 1 0620255. pdf.

The NRC currently budgets and completes inspections at Indian Point Units 2 and 3 considering each unit as a single reactor site. This approach is based on the historical differences involving ownership and operation of each unit by different utilities with separate organizations. Since 2001, Entergy has been the sole owner and operator of lndian Point Units 2 and 3, and has consolidated and implemented plant programs and processes. Currently only the licensed operator programs are implemented on a unit basis. As a result, insights from our inspections on one unit are generally applicable to the other unit. The NRC is therefore considering implementing an inspection program that treats Indian Point Units 2 and 3 as a single site. As a first step the attached inspection plans for lndian Point Units 2 and 3 schedule major team inspections concurrently at both units. The NRC will monitor the results of these team inspections and inform you regarding changes to our inspection plans in the future.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task foroe to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary lnstruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGS)" at your facility. Results of these inspections can be found here:

http://www.nrc.qov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the Agency issued NRC Bulletin2011-01, "Mitigating Strategies," to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of Insights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.

f n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:i/www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).

J. Pollock 3

lf circumstances arise which cause us to change the inspection plans, we wilt contact you to discuss the change as soon as possible. Please contaci me at 610-3i3z-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely, tu; MelGray, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 5A-247;50-286 License Nos. DPR-26; DPR-04

Enclosure:

Point2&3 lnspection/Activityplan cc w/encl: Distribution via ListServ

J. Pollock lf circumstances arise which cause us to change the inspection plans, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

IRAI Mel Gray, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247;50-286 License Nos. DPR-26; DPR-64

Enclosure:

Indian Point 2 & 3 lnspection/Activity Plan Distribution w/encl:

W. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford. DRP C. Miller, DRS P. Wilson, DRS JMcHaIe, RIOEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Catts, SRI A. Ayegbusi, Rl P. Cataldo, SRI M. Halter. Rl D. Hochmuth, DRP DRS Branch Chiefs (6)

D. Screnci, PAO, N. Sheehan. PAO R. Barkley, ORA A. Kleft, NRR N. McNamara, SLO D. Tifft, SLO RidsNrrPMlndianPoint Resource RidsNrrDorlLpll -1 Resource ROPReport Resource@nrc.qov RidsN rrDirslpabResource@nrc.qov SUNSI Review Complete: BB (Reviewer's Initials)

DOCUMENT NAME: S:\\ROP-l2 Mid-Cycle Review\\Branch 2\\lP MG letter 2011 R4.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenUenclosure "E" = Copy with attachmenVenclosure "N" = No copy M1l12420836 OFFTCE thp RI/DRP RI/DRP RI/DRP NAME SMcCarver/smc BBicketUbb MGray/mg DATE 08t29t11 08t29t11 08/30/11 OFFICIAL RECORD COPY

Page'l of 2 0813012011 13:53:57 Report 22 Indian Point Inspection / Activity Plan 07t01t2011 - 12t31t2012 EP PROGR. EP PROGRAM INSPECTION 2

2 2

2 2

2 2

2 2

2 2

2 2

08t22t2011 08t22t2011 08t22t2011 08t2u2011 08t2212011 08t242u1 o8n2t20't1 08t29t2011 08t29t2011 08t29t2011 o8129t2011 01t09t2012 0u06t2412 10t24t2011 1'v14t2011 11t28t2011 11t14t2011 12t05t2011 12t05t2011 ou1a2u2 03t2612012 o3t19t2012 03t19t2012 o3t1912012 08t26t2011 oa2a2011 08t26t2011 08t26t2011 08t26t2011 08/26t2011 08t26t2011 49r02t2011 09102t2011 09102t2011 09130t2011 o1t13t2012 42t10t2012 10t28t2011 11t18t2011 1402t2011 11t18t2011

't2t09t2011 12,09t2011 03116t2012 03130t2012 03t23t2012 03t23t2012 03123t2012 tP 71't't402 tP 7111403 tP 7111404 tP 7111405 lP 71151-EP01 lP 71',t51-EP02 tP 71151-EP03 Alert and Notification System Testing Emergency Preparedness Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Conection of Emergenry Preparedness Weaknesses and Deficiencies Drill/Exercise Performance ERO Drill Participation Alert & Notification System 71124

. HP INSP.EFFLUENTS & PI VERIFICATION lP 71124.OA Radioactive Gaseous and Liquid Effluent Treatment Occupational Exposure Control Effectiveness RETS/ODCM Radiological Eff uent ISFSI

. DRY CASK LOADING CAMPAIGN lP 6085s.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2,6 EXAM.IP2INITIAL EXAM FY-12-IP2 INITIAL OPERATOR LICENSING EXAM FY IP2 INITIAL OPERATOR LICENSING EXAM 711118.REQUALINSP P/F RESULTS tP 71111118 Licensed Operator Requalification Program 7111117. PERMANENT PLANT MODIFICATIONS Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124

. HP INSP.ALARA lP 71124.02 Occupational ALARA Planning and Controls 71124 tP 60855.1 tP 71124.08 tP 71151-OR01 tP 71151-PR01 u01844 u01844 tP 7111117r tP 7111117r

. HP INSP.RADWASTE & ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Tt2sr601 - Tt25r600r REVTEW LR ACTlVlES lP 2516t001 lP 2516t001 71124 lP 7't124.01 tP 71124.02 tP 71124.03 Review of License Renewal Activities Review of License Renewal Activities

. HP.ACCESS CONTROL Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airbome Radioactivity Control and Mitigation

]This report does not incluOe INFO and OWRGE acttuittes.

J This report shows only on-site and announced inspection procedures.

I

Page 2 ol 2 08/30/2011 {3:53157 Report 22 2

2 z

2 2

2 09t17t2012 07n3r2012 09t10t2012 09t1012012 09t10t2012 oshot2012 09110t2012 ogt10t2012 10t01t2012 rcta1pa12 10t15t20't2 10t2912012 11t05t2012 2

2 2

Indian Point Inspection / Activity Plan o7to1t2011 - 12t31t2012 7111108P - tNSERVlCE lNSPECTlON 0311912012 0A3Ol20'12 lP 71111O8P lnservice Inspection Activities - P\\A/R 71124

. REMP 0612512012 OG12912012 lP 71124.07 Radiological Environmental Monitoring Program 71111118.IP2 REQUAL INSP wt P'F RESULTS 09t21t2012 07t2712012 09t14t2012 09t14t2012 09t1412012 ogt14t2012 09t14t2012 09t14t2012 10t05t2012 10t05t2012 10t19t2012 11t02t2012 11ta9t2012 7111107T. TRIENNIAL HEAT SINK lP 71111118 tP 71111077 71124 lP 2515t175 lP 71124.01 tP 71124.02 tP 71124.03 lP 71124.04 lP 71 151-OR01 EP EX lP 71't1401 tP 7111404 7111121 -CDBI tP 7111121 tP 71',t1121 lP 7',t't1121 Licensed Operator Requalification Program Heat Sink Performance

. HP.ACCESS CONTROL Emergency Response Organization, DriluExercise Performance Indicator, Program Review Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airbome Radioactivity Control and Mitigation Occupational Dose Assessment Occupational Exposure Control Effectiveness

. EP EXERCISE EVALUATION Exercise Evaluation Emergency Action Level and Emergency Plan Changes Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection Unit Number No. of Staff on Site not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page I of 2 0813012011 13:54:34 Report 22 3

3 3

3 3

3 3

07t18t2011 08t01t2011 0911u2011 o8t22t2011 o8t22t2011 o8t22t2011 0812212011 0a2a2u1 o8t22J2011 08t2u2011 o8t2912011 o8t29t2011 o8t29t2011 11t14t2011 11t28t2011 11t14t2011 12t05t2011 03t19t2012 03t19t2012 o3t19t2012 o6t25t2012 07t23t2012 o9t10t2012 3

3 3

3 3

3 Indian Point 3 Inspection / Activity Plan 0710112011 - 12t31t2012 07122t2011 08105t2011 09t16t2011 08t26t2011 08126t2011 08126t2011 08t26t2011 08126t2011 08t26t2011 08t26t2011 091022011 09to2t2011 o9to2t2011 11t18t2011 12t02t2011 11t18t2011 12t49i2011 03t23t2012 03t23t2012 03t23t2012 tP 7111402 tP 7111403 tP 711140/.

lP 7111405 tP 71151-EP01 lP 71151-EP02 lP 71151-EP03 71152

- Pt&R lP 711528 Problem ldentification and Resolution lP 71'1528 Problem ldentification and Resolution 7111118 - IP3 REQUAL INSP WITH P/F RESULTS tP 71111118 Licensed Operator Requalification Program EP PROGR. EP PROGRAM INSPECTION tP 71124.46 tP 71151-OR01 lP 71151-PR01 Alert and Notification System Testing Emergency Preparedness Organization Staffing and Augmentation System Emergenry Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and Deficiencies Drill/Exercise Performance ERO Drill ParticiDalion Alert & Notification System 71124

. HP.EFFLUENTS / PIVERIFICATION Radioactive Gaseous and Liquid Effluent Treatment Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effl uent Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airbome Radioactivity Control and Mitigation MODS

. PERMANENT PLANT MODIFICATIONS lP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications lP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 71124

. HPALAM lP 71124.02 Occupational ALARA Planning and Controls 7'1124

. HP. RADWASTE lP 71124.09 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 tP 71124.01 tP 71124.02 tP 71124.03

. HP.ACCESS CONTROL 71124

-REMP 0612912012 lP 71124,07 Radiological Environmental Monitoring Program 7111107T. TRIENNIAL HEAT SINK 0712712012 lP 7111107T Heat Sink Performance 71124

-HP-ACCESSCONTROL Unit Number No. of Staff on Site o9t14t2012 lP 2515t175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 ot 2 0813012011 13:54:34 Report 22 Indian Point 3 Inspection / Activity Plan 07 lol 12011 - 12t31r2012 71124

?

?

3 3

3 3

3 3

09t1012012 09t10t2012 09t10t2012 ogt10t2012 09t1012012 10t01t2012 10t01t2012 10t15t20't2 10n9t2412 11t05t2012 09rt4n012 09114t2012 09114t20',t2 09114t2012 ogt14t2012 10t05t2012 10t05t2012 10t19t20't2 11t02t2012 11t09t2012 tP 71124.01 lP 71124.02 lP 71124.03 tP 71124.04 tP 71151-PR01 EP EX tP 711',t401 lP 7111404 7111121 -CDBI tP 7111',t21 lP 711112't lP 7111121

. HP.ACCESS CONTROL Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls In-Plant Airbome Radioactivity Control and Mitigation Occupational Dose Assessment RETS/ODCM Radiological Effl uent

. EP EXERCISE EVLAUTION Exercise Evaluation Emergency Action Level and Emergency Plan Changes Component Design Bases Inspection Component Design Bases Inspection Component Design Bases lnspection fhis report does not include INPO and OUTAGE activities.

This report shows only on-sile and announced inspection procedures.