{{#Wiki_filter:REGULATOR WFORMATION DISTRIBUTION
{{#Wiki_filter:REGULATOR     WFORMATION DISTRIBUTION 'S   EM (BIDS)
'S EM (BIDS)DOCKET 05000254 05000265  
ACCESSION NBR: 8707230446      DOC. DATE: 87/07/15 NOTARIZED: NO          DOCKET FACIL: 50-254 Quad-Cities Stations    Unit ii Commonwealth Edison  Co. 05000254 50-265 Quad-Cities Stations Unit 2i Commonwealth Edison      Co. 05000265 AUTH. NAME          AUTHOR AFFILIATION JOHNSON'. M.      Commonwealth Edison Co.
REClP. NAME          RECIPIENT AFFILIATION MURLEYi T. E.        Office of Nuclear Reactor Regulationi Director (Post    870411


==SUBJECT:==
==SUBJECT:==
Documents 870707 telcon clarifying util 870313 exemption request for pulling RHR sos logic circuit fuses to preclude spurious equipment operation.
Documents 870707 telcon clarifying util 870313 exemption request for pulling RHR sos logic circuit fuses to preclude spurious equipment operation.
DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: A001D     COPIES RECEIVED: LTR     ENCL     SIZE:
General Distribution ACCESSION NBR: 8707230446 DOC.DATE: 87/07/15 NOTARIZED:
TITLE: OR Submittal: General Distribution NOTES:
NO FACIL: 50-254 Quad-Cities Stations Unit ii Commonwealth Edison Co.50-265 Quad-Cities Stations Unit 2i Commonwealth Edison Co.AUTH.NAME AUTHOR AFFILIATION JOHNSON'.M.Commonwealth Edison Co.REClP.NAME RECIPIENT AFFILIATION MURLEYi T.E.Office of Nuclear Reactor Regulationi Director (Post 870411 NOTES: RECIPIENT ID CODE/NAME PD3-2 LA ROSS>T COPIES LTTR E 1 1 CL RECIPIENT ID CODE/NAME PD3-2 PD COPIES LTTR ENCL INTERNAL: ARM/DAF/LFMB NRR/DEST/ADS NRR/DOEA/TSB OGC/HDS1 RES/DE/EIB EXTERNAL: EQhG BRUSKEi 8 NRC PDR NRR/DEST/*DE NRR/DEST/CEB NRR/ILRB EG LE 01 LPDR NSIC  
RECIPIENT       COPIES          RECIPIENT         COPIES ID CODE/NAME       LTTR E CL     ID CODE/NAME       LTTR ENCL PD3-2 LA                1          PD3-2 PD ROSS> T                1 INTERNAL: ARM/DAF/LFMB                       NRR/DEST/*DE NRR/DEST/ADS                       NRR/DEST/CEB NRR/DOEA/TSB                       NRR/      ILRB OGC/HDS1                           EG    LE      01 RES/DE/EIB EXTERNAL: EQhG BRUSKEi 8                     LPDR NRC PDR                           NSIC
)l'p)I Commonwealt Iso n One First National Plaza, Chicago, Illinois ress ep y to: ost ice ox Chicago, Illinois 60690-0767 July 15, 1987 Mr.Thomas E.Murley, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, DC 20555  
 
  )l
  'p
)I
 
Commonwealt                 Iso n One First National Plaza, Chicago, Illinois ress ep y to: ost       ice ox Chicago, Illinois 60690 - 0767 July 15, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555


==Subject:==
==Subject:==
Quad Cities Units 1 and 2 Clarification of Information Pertaining to Fuse Pulling to Preclude Spurious Equipment Operation and Safe Shutdown Exemption Requests NRC Docket Nos.50-254 and 50-265  
Quad     Cities Units         1 and 2 Clarification of Information Pertaining to   Fuse   Pulling to Preclude Spurious Equipment Operation and Safe Shutdown Exemption Requests NRC Docket Nos. 50-254 and 50-265


==Reference:==
==Reference:==
Letter from I.M. Johnson to H.R. Denton dated March 13, 1987
==Dear Mr. Murley:==


Letter from I.M.Johnson to H.R.Denton dated March 13, 1987  
On a  July 7,      1987 telephone conversation with members of your staff, information  and  clarification concerning the following items was requested:
: 1. Clarification oE the Eifth sentence of Section 12.1.1 of the exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operaton.
: 2. InEormation concerning breaker control power fuse pulling for safe shutdown path L. (Correction to March 13, 1987 letter.)
: 3. The time    factor involved in pulling              RHR  system logic circuit fuses.
As a clarification to our exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operation, the fifth sentence of Section 12.1.1 should read, "These rooms, however, are located in the Northern and Southern Zone Groups and, therefore, could be inaccessible if the Eire occurred in Fire Areas TB-I or TB-III."
8707230446 8707is                                                                          ool PDR    ADOCN, 05000254 p                      PDR


==Dear Mr.Murley:==
T.E. Murley                                                           July 15,   1987 In the above referenced letter, we had inadvertently left out the number of breakers that would have their control power fuses pulled and the time frame for the fuse pulling for safe shutdown path L. These are listed         as follows:
On a July 7, 1987 telephone conversation with members of your staff, information and clarification concerning the following items was requested:
Safe Shutdown Path         Number of Breakers               Time Frame 10                 14 minutes after   scram.
1.Clarification oE the Eifth sentence of Section 12.1.1 of the exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operaton.2.InEormation concerning breaker control power fuse pulling for safe shutdown path L.(Correction to March 13, 1987 letter.)3.The time factor involved in pulling RHR system logic circuit fuses.As a clarification to our exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operation, the fifth sentence of Section 12.1.1 should read,"These rooms, however, are located in the Northern and Southern Zone Groups and, therefore, could be inaccessible if the Eire occurred in Fire Areas TB-I or TB-III." 8707230446 8707is PDR ADOCN, 05000254 p PDR ool T.E.Murley July 15, 1987 In the above referenced letter, we had inadvertently left out the number of breakers that would have their control power fuses pulled and the time frame for the fuse pulling for safe shutdown path L.These are listed as follows: Safe Shutdown Path Number of Breakers Time Frame 10 19 14 minutes after scram.3 hours after scram.The number of RHR logic circuit fuses pulled to preclude spurious equipment operation must be pulled within 14 minutes of the reactor scram to ensure that the unit dedicated diesels will be available for powering the safe shutdown makeup pumps.Please direct any questions you may have regarding this matter to this office.Very truly you s, I.M.Johnso Nuclear Licensing Administrator lm cc: T.Ross-NRR NRC Region III Administrator Quad Cities Resident Inspector 3328K}}
19                  3 hours after scram.
The number of RHR logic circuit fuses pulled to preclude spurious equipment operation must be pulled within 14 minutes of the reactor scram to ensure that the unit dedicated diesels will be available for powering the safe shutdown makeup pumps.
Please direct any questions you may have regarding   this matter to this office.
Very truly you s, I. M. Johnso Nuclear Licensing Administrator lm cc:   T. Ross NRR NRC Region III Administrator Quad Cities Resident Inspector 3328K}}

Latest revision as of 10:09, 22 October 2019

Documents 870707 Telcon Clarifying Util 870313 Exemption Request for Pulling RHR Sys Logic Circuit Fuses to Preclude Spurious Equipment Operation
ML17342B409
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/15/1987
From: Johnson I
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
3328K, NUDOCS 8707230446
Download: ML17342B409 (5)


Text

REGULATOR WFORMATION DISTRIBUTION 'S EM (BIDS)

ACCESSION NBR: 8707230446 DOC. DATE: 87/07/15 NOTARIZED: NO DOCKET FACIL: 50-254 Quad-Cities Stations Unit ii Commonwealth Edison Co. 05000254 50-265 Quad-Cities Stations Unit 2i Commonwealth Edison Co. 05000265 AUTH. NAME AUTHOR AFFILIATION JOHNSON'. M. Commonwealth Edison Co.

REClP. NAME RECIPIENT AFFILIATION MURLEYi T. E. Office of Nuclear Reactor Regulationi Director (Post 870411

SUBJECT:

Documents 870707 telcon clarifying util 870313 exemption request for pulling RHR sos logic circuit fuses to preclude spurious equipment operation.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD3-2 LA 1 PD3-2 PD ROSS> T 1 INTERNAL: ARM/DAF/LFMB NRR/DEST/*DE NRR/DEST/ADS NRR/DEST/CEB NRR/DOEA/TSB NRR/ ILRB OGC/HDS1 EG LE 01 RES/DE/EIB EXTERNAL: EQhG BRUSKEi 8 LPDR NRC PDR NSIC

)l

'p

)I

Commonwealt Iso n One First National Plaza, Chicago, Illinois ress ep y to: ost ice ox Chicago, Illinois 60690 - 0767 July 15, 1987 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Quad Cities Units 1 and 2 Clarification of Information Pertaining to Fuse Pulling to Preclude Spurious Equipment Operation and Safe Shutdown Exemption Requests NRC Docket Nos. 50-254 and 50-265

Reference:

Letter from I.M. Johnson to H.R. Denton dated March 13, 1987

Dear Mr. Murley:

On a July 7, 1987 telephone conversation with members of your staff, information and clarification concerning the following items was requested:

1. Clarification oE the Eifth sentence of Section 12.1.1 of the exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operaton.
2. InEormation concerning breaker control power fuse pulling for safe shutdown path L. (Correction to March 13, 1987 letter.)
3. The time factor involved in pulling RHR system logic circuit fuses.

As a clarification to our exemption request for pulling RHR system logic circuit fuses to preclude spurious equipment operation, the fifth sentence of Section 12.1.1 should read, "These rooms, however, are located in the Northern and Southern Zone Groups and, therefore, could be inaccessible if the Eire occurred in Fire Areas TB-I or TB-III."

8707230446 8707is ool PDR ADOCN, 05000254 p PDR

T.E. Murley July 15, 1987 In the above referenced letter, we had inadvertently left out the number of breakers that would have their control power fuses pulled and the time frame for the fuse pulling for safe shutdown path L. These are listed as follows:

Safe Shutdown Path Number of Breakers Time Frame 10 14 minutes after scram.

19 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after scram.

The number of RHR logic circuit fuses pulled to preclude spurious equipment operation must be pulled within 14 minutes of the reactor scram to ensure that the unit dedicated diesels will be available for powering the safe shutdown makeup pumps.

Please direct any questions you may have regarding this matter to this office.

Very truly you s, I. M. Johnso Nuclear Licensing Administrator lm cc: T. Ross NRR NRC Region III Administrator Quad Cities Resident Inspector 3328K