{{#Wiki_filter:consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen: | {{#Wiki_filter:consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission \:o t:i Mail and Records Section (/) 03 Washington, D.C., 20555 :~l .(ll> | ||
'*- :.-0 | |||
~:.".'.: ::0 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen: | |||
Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978. | Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978. | ||
William E. Adams, General Engineer cc: | {Jt~L William E. Adams, General Engineer cc: JGKepp~er, USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich. | ||
USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich. AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich. Document Control -(2) 950-22.35.10 | AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich. | ||
Document Control - (2) 950-22.35.10 | |||
CONSUMERS POWER CO. | |||
PALISADES NUCLEAR PLANT DOCKET 50-255 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78 | OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78 The Plant was in a refueling shutdown condition. | ||
Completed plugging of tubes in both Steam Generators. | 3-6-78 Completed plugging of tubes in both Steam Generators. | ||
Completed refurbishment of Control Rod Drive packages. | Completed refurbishment of Control Rod Drive packages. | ||
Completed modifications to the 345KV line. Completed ISI piping inspections. | 3-13-78 Completed modifications to the 345KV line. | ||
Completed repairs to the Main Steam Isolation Valves. Completed repairs to the Containment Air Coolers. Completed main generator inspection and repairs. Completed refurbishment of Primary Coolant Pump P-55B oil lift system. Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808). Commenced the Integrated Leak Rate Test (ILRT). Completed the ILRT. Completed modifications to the Reactor vessel head cooling system. | 3-15-78 Completed ISI piping inspections. | ||
3-16-78 Completed repairs to the Main Steam Isolation Valves. | |||
3-20-78 Completed repairs to the Containment Air Coolers. | |||
Completed main generator inspection and repairs. | |||
3-22-78 Completed refurbishment of Primary Coolant Pump P-55B oil lift system. | |||
3-23-78 Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808). | |||
3-24-78 Commenced the Integrated Leak Rate Test (ILRT). | |||
3-28-78 Completed the ILRT. | |||
3-30-78 Completed modifications to the Reactor vessel head cooling system. | |||
OPERATING DAT A REPORT DOCKET NO. 50-255 DATE 4-4-78 COMPLETED BY DTBoJ inoK TELEPHONE 616-764-913 OPERATING STATUS I. Unit Name: Palisades Plant Notes | |||
: 2. Reporting Period: 3~1-78 to 3-31-78 | |||
: 3. Licensed Thermal Power (MWt): 2530 | |||
: 4. Nameplate Rating (Gross MWe): 811.7 | |||
: 5. Design Electrical Rating (Net MWe): 805 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
* 675 | * 675 | ||
: 7. Maximum Dependable Capacity (Net !\!We): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: 11. Hours Jn Reporting Period 12. Number Of Homs.Reactor Was Critical* | * 635 | ||
: 13. Reactor Reserve Shurdown Hours 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy GeP..erated (MWH) 17. Gross Electrical Energy Generated | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
: 18. Net Electrical Energy Generated (M\VH) 19. 20 | : 9. Power Level To Which Restricted, If Any (Net MWe): | ||
: 26. Units In Test Status (Prior to Commercial Operation): | : 10. Reasons For Restrictions, If Any: | ||
INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION | ,(°' | ||
* . | |||
* Based on Condenser Backpressure Limitations . (t) /77) | This Month Yr.-to-Date Cumul:.itive | ||
: 11. Hours Jn Reporting Period o* 2160 *55,071 | |||
Compute to the nearest whole megawatt. | : 12. Number Of Homs.Reactor Was Critical* 0 124.9 29.,524.3 | ||
: 13. Reactor Reserve Shurdown Hours 0 | |||
: 14. Hours Generator On-Line 0 124.8 27,957.0 | |||
: 15. Unit Reserve Shutdown Hours | |||
: 16. Gross Thermal Energy GeP..erated (MWH) 0 270,336 50,292,000 | |||
: 17. Gross Electrical Energy Generated (~!WH) ----- 0 81,640 15,668,250 | |||
: 18. Net Electrical Energy Generated (M\VH) 0 76,464 14,689,831 | |||
: 19. Unit Service FactorI 0 5.8 50~8 | |||
: 20. Unit Availability F.actor 0 5.8 50.8 | |||
: 21. Unit C::ipacity f3ctor (Using MDC Net) 0 5.6 42.0 Unit Capacity Fa'cror (Using DER Net) 0 ~.4 33.1 | |||
: 23. Unit Forced Outage Rate 0 0 40.4 | |||
: 24. Shutdov,;ns Scheduled Over Next 6 Months (Type. D::ite. and Dur:Hion c>f Each): | |||
: 25. If Shut Down At End Of Report Period. Estim::ited Date of St:::rtup: | |||
: 26. Units In Test Status (Prior to Commercial Operation): forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION | |||
* Based on Condenser Backpressure Limitations | |||
. (t) /77) | |||
eVERAGE DAILY UNIT POWER LEVEL. e DOCKET NO. | |||
50-255 UNIT Palisades DATE 3-04-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH -March 1978 | |||
'- | |||
DAY A VER AGE DAILY POWER LEVEL DAY A VER..\GE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 17 0 2 0 0 18 o* 0 3 19 0 0 4 20 5 0 21 0 6 0 0 22 | |||
{ 0 | |||
__, | |||
* 7 -,~ | |||
0 0 0 8 24 9 0 0 25 0 0 10 26 11 0 27 0 12 0 0 28 0 0 13 29 0 0 14 30 15 0 0 31 16 0 INSlRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlll1th. Compute to the nearest whole megawatt. | |||
(9/77) | (9/77) | ||
:;:. | |||
- | |||
<l.l <l.l -* <l.l -"O | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ___;5:....:0:......--=2-=5-=5--,-_- '~ - | ||
UNIT NAME Palisades* | |||
DATE 4-4-78 COMPLETED BY DIBollnow REPORT MONTH_ March 1978 616-764-8913 TELEPHONE | |||
,. | - | ||
,,. Exhibit G -Inst ructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) Exhibit I -Same Sm1rrc}} | : ,. | ||
,.-L_ | |||
r-1 3 ::JJ ...... | |||
c | |||
~V'I | |||
- <:.> *-- :::; | |||
~ | |||
-0 .::: | |||
- | |||
'-' | |||
"" | |||
v Licensee E..q- | |||
<l.l <l.l -* | |||
0 | |||
<l.l | |||
-0 Cause & Corrective No. Date n. | |||
>-, """'" - | |||
::l | |||
~ | |||
V> | |||
'"' ..c ::; | |||
~ | |||
O'.'. Event -V> "O | |||
>-. - | |||
~ | |||
*~ 0 i;:::r;_; | |||
Action to r- ::j~ | |||
o::::. ~ ~ ..r: Report tt VJ u 0 Prevent Recurrence | |||
;E VJ ~ u 8 | |||
*--* | |||
1 780106 s 2,035.2 c 1 None - - N/A | |||
,,. | |||
3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Sche<l ulcd A-Equipment Failure (Explain) ! -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Reguiatory Restriction 4-0t her (Exp la in) 0161) | |||
E-Opcrator Training & License Examination F-A<lministrative 5 G-Opcrational Error (Explain) Exhibit I - Same Sm1rrc | |||
(\J /77) !I-Other (Explai11)}} |
Revision as of 09:08, 20 October 2019
ML18347A797 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 04/07/1978 |
From: | Adams W Consumers Power Co |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML18347A797 (5) | |
Text
consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission \:o t:i Mail and Records Section (/) 03 Washington, D.C., 20555 :~l .(ll>
'*- :.-0
~:.".'.: ::0 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978.
{Jt~L William E. Adams, General Engineer cc: JGKepp~er, USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich.
AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich.
Document Control - (2) 950-22.35.10
CONSUMERS POWER CO.
PALISADES NUCLEAR PLANT DOCKET 50-255
SUMMARY
OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78 The Plant was in a refueling shutdown condition.
3-6-78 Completed plugging of tubes in both Steam Generators.
Completed refurbishment of Control Rod Drive packages.
3-13-78 Completed modifications to the 345KV line.
3-15-78 Completed ISI piping inspections.
3-16-78 Completed repairs to the Main Steam Isolation Valves.
3-20-78 Completed repairs to the Containment Air Coolers.
Completed main generator inspection and repairs.
3-22-78 Completed refurbishment of Primary Coolant Pump P-55B oil lift system.
3-23-78 Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808).
3-24-78 Commenced the Integrated Leak Rate Test (ILRT).
3-28-78 Completed the ILRT.
3-30-78 Completed modifications to the Reactor vessel head cooling system.
OPERATING DAT A REPORT DOCKET NO. 50-255 DATE 4-4-78 COMPLETED BY DTBoJ inoK TELEPHONE 616-764-913 OPERATING STATUS I. Unit Name: Palisades Plant Notes
- 2. Reporting Period: 3~1-78 to 3-31-78
- 3. Licensed Thermal Power (MWt): 2530
- 4. Nameplate Rating (Gross MWe): 811.7
- 5. Design Electrical Rating (Net MWe): 805
- 6. Maximum Dependable Capacity (Gross MWe):
- 675
- 7. Maximum Dependable Capacity (Net !\!We):
- 635
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
,(°'
- .
This Month Yr.-to-Date Cumul:.itive
- 11. Hours Jn Reporting Period o* 2160 *55,071
- 12. Number Of Homs.Reactor Was Critical* 0 124.9 29.,524.3
- 13. Reactor Reserve Shurdown Hours 0
- 14. Hours Generator On-Line 0 124.8 27,957.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy GeP..erated (MWH) 0 270,336 50,292,000
- 17. Gross Electrical Energy Generated (~!WH) ----- 0 81,640 15,668,250
- 18. Net Electrical Energy Generated (M\VH) 0 76,464 14,689,831
- 19. Unit Service FactorI 0 5.8 50~8
- 20. Unit Availability F.actor 0 5.8 50.8
- 21. Unit C::ipacity f3ctor (Using MDC Net) 0 5.6 42.0 Unit Capacity Fa'cror (Using DER Net) 0 ~.4 33.1
- 23. Unit Forced Outage Rate 0 0 40.4
- 24. Shutdov,;ns Scheduled Over Next 6 Months (Type. D::ite. and Dur:Hion c>f Each):
- 25. If Shut Down At End Of Report Period. Estim::ited Date of St:::rtup:
- 26. Units In Test Status (Prior to Commercial Operation): forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION
- Based on Condenser Backpressure Limitations
. (t) /77)
eVERAGE DAILY UNIT POWER LEVEL. e DOCKET NO.
50-255 UNIT Palisades DATE 3-04-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH -March 1978
'-
DAY A VER AGE DAILY POWER LEVEL DAY A VER..\GE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 17 0 2 0 0 18 o* 0 3 19 0 0 4 20 5 0 21 0 6 0 0 22
{ 0
__,
- 7 -,~
0 0 0 8 24 9 0 0 25 0 0 10 26 11 0 27 0 12 0 0 28 0 0 13 29 0 0 14 30 15 0 0 31 16 0 INSlRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlll1th. Compute to the nearest whole megawatt.
(9/77)
- .
-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ___;5:....:0:......--=2-=5-=5--,-_- '~ -
UNIT NAME Palisades*
DATE 4-4-78 COMPLETED BY DIBollnow REPORT MONTH_ March 1978 616-764-8913 TELEPHONE
-
- ,.
,.-L_
r-1 3 ::JJ ......
c
~V'I
- <:.> *-- :::;
~
-0 .:::
-
'-'
""
v Licensee E..q-
<l.l <l.l -*
0
<l.l
-0 Cause & Corrective No. Date n.
>-, """'" -
- l
~
V>
'"' ..c ::;
~
O'.'. Event -V> "O
>-. -
~
- ~ 0 i;:::r;_;
Action to r- ::j~
o::::. ~ ~ ..r: Report tt VJ u 0 Prevent Recurrence
- E VJ ~ u 8
- --*
1 780106 s 2,035.2 c 1 None - - N/A
,,.
3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Sche<l ulcd A-Equipment Failure (Explain) ! -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Reguiatory Restriction 4-0t her (Exp la in) 0161)
E-Opcrator Training & License Examination F-A<lministrative 5 G-Opcrational Error (Explain) Exhibit I - Same Sm1rrc
(\J /77) !I-Other (Explai11)