{{#Wiki_filter:consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
{{#Wiki_filter:consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission                                                 \:o t:i Mail and Records Section                                               (/)      03 Washington, D.C., 20555                                                 :~l      .(ll>
                                                                        '*-      :.-0
                                                                      ~:.".'.:  ::0 Re:   LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978.
Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978.
William E. Adams, General Engineer cc:
{Jt~L William E. Adams, General Engineer cc:   JGKepp~er, USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich.
USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich. AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich. Document Control -(2) 950-22.35.10 t:i \:o (/) 03 .(ll> '*-:.-0
AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich.
::0 CONSUMERS POWER CO. PALISADES NUCLEAR PLANT DOCKET 50-255  
Document Control - (2) 950-22.35.10
 
CONSUMERS POWER CO.
PALISADES NUCLEAR PLANT DOCKET 50-255


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78 3-6-78 3-13-78 3-15-78 3-16-78 3-20-78 3-22-78 3-23-78 3-24-78 3-28-78 3-30-78 The Plant was in a refueling shutdown condition.
OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78     The Plant was in a refueling shutdown condition.
Completed plugging of tubes in both Steam Generators.
3-6-78        Completed plugging of tubes in both Steam Generators.
Completed refurbishment of Control Rod Drive packages.
Completed refurbishment of Control Rod Drive packages.
Completed modifications to the 345KV line. Completed ISI piping inspections.
3-13-78        Completed modifications to the 345KV line.
Completed repairs to the Main Steam Isolation Valves. Completed repairs to the Containment Air Coolers. Completed main generator inspection and repairs. Completed refurbishment of Primary Coolant Pump P-55B oil lift system. Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808). Commenced the Integrated Leak Rate Test (ILRT). Completed the ILRT. Completed modifications to the Reactor vessel head cooling system.
3-15-78        Completed ISI piping inspections.
*,(°' . OPERATING DAT A REPORT OPERATING STATUS I. Unit Name: Palisades Plant 2. Reporting Period: 3. Licensed Thermal Power (MWt): 4. Nameplate Rating (Gross MWe):
3-16-78        Completed repairs to the Main Steam Isolation Valves.
to 3-31-78 2530 811.7 5. Design Electrical Rating (Net MWe): 6. Maximum Dependable Capacity (Gross MWe): 805
3-20-78        Completed repairs to the Containment Air Coolers.
Completed main generator inspection and repairs.
3-22-78        Completed refurbishment of Primary Coolant Pump P-55B oil lift system.
3-23-78        Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808).
3-24-78        Commenced the Integrated Leak Rate Test (ILRT).
3-28-78        Completed the ILRT.
3-30-78        Completed modifications to the Reactor vessel head cooling system.
 
OPERATING DAT A REPORT DOCKET NO. 50-255 DATE    4-4-78 COMPLETED BY      DTBoJ    inoK TELEPHONE      616-764-913 OPERATING STATUS I. Unit Name:                                   Palisades Plant Notes
: 2. Reporting Period:                        3~1-78 to 3-31-78
: 3. Licensed Thermal Power (MWt):                                2530
: 4. Nameplate Rating (Gross MWe):                               811.7
: 5. Design Electrical Rating (Net MWe):                          805
: 6. Maximum Dependable Capacity (Gross MWe):
* 675
* 675
* 635 7. Maximum Dependable Capacity (Net !\!We): Notes DOCKET NO. DATE COMPLETED BY TELEPHONE 50-255 4-4-78 DTBoJ inoK 616-764-913
: 7. Maximum Dependable Capacity (Net !\!We):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: 11. Hours Jn Reporting Period 12. Number Of Homs.Reactor Was Critical*
* 635
: 13. Reactor Reserve Shurdown Hours 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy GeP..erated (MWH) 17. Gross Electrical Energy Generated
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 18. Net Electrical Energy Generated (M\VH) 19. 20. 21. Unit Service Factor I Unit Availability F.actor Unit C::ipacity f3ctor (Using MDC Net) Unit Capacity Fa'cror (Using DER Net) 23. Unit Forced Outage Rate This Month o* 0 0 0 0 0 -----0 0 0 0 0 0 Yr.-to-Date 2160 124.9 124.8 270,336 81,640 76,464 5.8 5.8 5.6 0 24. Shutdov,;ns Scheduled Over Next 6 Months (Type. D::ite. and Dur:Hion c>f Each): 25. If Shut Down At End Of Report Period. Estim::ited Date of St:::rtup:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 26. Units In Test Status (Prior to Commercial Operation):
: 10. Reasons For Restrictions, If Any:
INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION forecast Cumul:.itive
,(°'
*55,071 29.,524.3 27,957.0 50,292,000 15,668,250 14,689,831 50.8 42.0 33.1 40.4 Achieved
* .
* Based on Condenser Backpressure Limitations . (t) /77)
This Month            Yr.-to-Date        Cumul:.itive
{ * :;:. eVERAGE DAILY UNIT POWER LEVEL. e MONTH -March 1978 '-DAY A VER AGE DAILY POWER LEVEL (MWe-Net) 0 2 0 3 o* 0 4 5 0 6 0 0 7 8 0 9 0 10 0 11 0 12 0 0 13 14 0 15 0 16 0 INSlRUCTIONS DAY 17 18 19 20 21 22 _ _, 24 25 26 27 28 29 30 31 DOCKET NO. UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 3-04-78 DIBollnow 616-764-8913 A VER..\GE DAILY POWER LEVEL (MWe-Net) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlll1th.
: 11. Hours Jn Reporting Period o*                  2160            *55,071
Compute to the nearest whole megawatt.
: 12. Number Of Homs.Reactor Was Critical*                       0                    124.9          29.,524.3
: 13. Reactor Reserve Shurdown Hours 0
: 14. Hours Generator On-Line                                     0                    124.8          27,957.0
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy GeP..erated (MWH) 0              270,336        50,292,000
: 17. Gross Electrical Energy Generated (~!WH)      -----        0                81,640        15,668,250
: 18. Net Electrical Energy Generated (M\VH)                     0                76,464        14,689,831
: 19. Unit Service FactorI                                        0                        5.8                50~8
: 20. Unit Availability F.actor                                   0                      5.8                50.8
: 21. Unit C::ipacity f3ctor (Using MDC Net)                     0                        5.6                42.0 Unit Capacity Fa'cror (Using DER Net)                       0                      ~.4                33.1
: 23. Unit Forced Outage Rate 0                       0                   40.4
: 24. Shutdov,;ns Scheduled Over Next 6 Months (Type. D::ite. and Dur:Hion c>f Each):
: 25. If Shut Down At End Of Report Period. Estim::ited Date of St:::rtup:
: 26. Units In Test Status (Prior to Commercial Operation):                       forecast            Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION
* Based     on Condenser Backpressure Limitations
                                                                                                                  . (t) /77)
 
eVERAGE DAILY UNIT POWER LEVEL.                 e DOCKET NO.
50-255 UNIT        Palisades DATE 3-04-78 COMPLETED BY            DIBollnow TELEPHONE          616-764-8913 MONTH             -March 1978
                              '-
DAY       A VER AGE DAILY POWER LEVEL                          DAY        A VER..\GE DAILY POWER LEVEL (MWe-Net)                                                  (MWe-Net) 0                                17                  0 2                             0                                                     0 18 o*                                                   0 3                                                              19 0                                                    0 4                                                             20 5                             0                              21                    0 6                             0                                                     0 22
{                                0
__,
* 7                                                             -,~
0 0                                                   0 8                                                            24 9                              0                                                   0 25 0                                                   0 10                                                            26 11                              0                             27                   0 12 0                                                   0 28 0                                                   0 13                                                            29 0                                                   0 14                                                            30 15 0                                                   0 31 16                              0 INSlRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlll1th. Compute to the nearest whole megawatt.
(9/77)
(9/77)
No. Date 1 780106 F: Forced S: Sche<l ulcd (\J /77) UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH_ March 1978 ,.-L_ r-1 3 ::JJ ...... -:::; '-' Licensee -0 .::: "" *-<:.> n. -::l V> -v ..c ::; O'.'. "" >-, "'" -'"' r-..r: o::::. ;E VJ s 2,035.2 c 1 Reason: A-Equipment Failure (Explain)
:;:.
B-Maintenance or Test C-Rcfucling D-Reguiatory Restriction 8 Event Report None E-Opcrator Training & License Examination F-A<lministrative G-Opcrational Error (Explain)
 
!I-Other (Explai11) tt -c E..q-
                                                                                                                                                                      -
<l.l <l.l -* <l.l -"O 0 -0 0 V> >-. -i;:::r;_;
UNIT SHUTDOWNS AND POWER REDUCTIONS                               DOCKET NO. ___;5:....:0:......--=2-=5-=5--,-_- '~ -
VJ u 0 u *--* 3 --Method: ! -Manual 2-Manual Scram. 3-Automatic Scram. 4-0t her (Exp la in) : N/A -DOCKET NO. UNIT NAME DATE COMPLETED BY TELEPHONE
UNIT NAME          Palisades*
___;5:....:0:......--=2-=5-=5--,-_--Palisades*  
DATE        4-4-78 COMPLETED BY            DIBollnow REPORT MONTH_ March 1978                                                 616-764-8913 TELEPHONE
,. 4 5 4-4-78 DIBollnow 616-764-8913 Cause & Corrective Action to Prevent Recurrence
                                                                                            -
,,. Exhibit G -Inst ructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) Exhibit I -Same Sm1rrc}}
: ,.
                                                            ,.-L_
r-1   3     ::JJ ......
c
                                                                                                  ~V'I
                        - <:.>   *--   :::;
                                                        ~
                                                  -0 .:::
                                                        -
                                                                '-'
                                                                ""
v Licensee      E..q-
                                                                                      <l.l <l.l   -*
0
                                                                                                        <l.l
                                                                                                        -0 Cause & Corrective No.            Date  n.
                          >-,    """'" -
::l
                                        ~
V>
                                              '"' ..c ::;
                                                    ~
O'.'. Event      -V> "O
                                                                                    >-. -
                                                                                          ~
                                                                                                *~ 0 i;:::r;_;
Action to r-         ::j~
o::::.       ~    ~  ..r:             Report tt    VJ    u      0                     Prevent Recurrence
                                                  ;E VJ        ~                              u 8
                                                                                  *--*
1        780106        s 2,035.2        c          1            None            -         -           N/A
                                                                                                                                    ,,.
3                                  4 F: Forced          Reason:                                                      Method:                              Exhibit G - Inst ructions S: Sche<l ulcd    A-Equipment Failure (Explain)                                ! -Manual                            for Preparation of Data B-Maintenance or Test                                        2-Manual Scram.                      Entry Sheets for Licensee C-Rcfucling                                                  3-Automatic Scram.                  Event Report (LER) File (NUREG-D-Reguiatory Restriction                                    4-0t her (Exp la in)                0161)
E-Opcrator Training & License Examination F-A<lministrative                                                                            5 G-Opcrational Error (Explain)                                                                    Exhibit I - Same Sm1rrc
(\J /77)                !I-Other (Explai11)}}

Revision as of 09:08, 20 October 2019

Monthly Operating Data & Summary of Operating Experience for March 1978
ML18347A797
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/07/1978
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A797 (5)


Text

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 7, 1978 USNuclear Regulatory Connnission \:o t:i Mail and Records Section (/) 03 Washington, D.C., 20555  :~l .(ll>

'*-  :.-0

~:.".'.:  ::0 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data, of Operating Experience for the Palisades Nuclear month of March 1978.

{Jt~L William E. Adams, General Engineer cc: JGKepp~er, USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVan Farowe, Div. of Radiological Health Lansing, Mich.

AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich.

Document Control - (2) 950-22.35.10

CONSUMERS POWER CO.

PALISADES NUCLEAR PLANT DOCKET 50-255

SUMMARY

OF OPERATING EXPERIENCE FOR PERIOD MARCH 1 THROUGH MARCH 31, 1978 3-::-1-78 The Plant was in a refueling shutdown condition.

3-6-78 Completed plugging of tubes in both Steam Generators.

Completed refurbishment of Control Rod Drive packages.

3-13-78 Completed modifications to the 345KV line.

3-15-78 Completed ISI piping inspections.

3-16-78 Completed repairs to the Main Steam Isolation Valves.

3-20-78 Completed repairs to the Containment Air Coolers.

Completed main generator inspection and repairs.

3-22-78 Completed refurbishment of Primary Coolant Pump P-55B oil lift system.

3-23-78 Completed repairs to Containment purge supply and exhaust valves (CV-1805, 1806, 1807, and 1808).

3-24-78 Commenced the Integrated Leak Rate Test (ILRT).

3-28-78 Completed the ILRT.

3-30-78 Completed modifications to the Reactor vessel head cooling system.

OPERATING DAT A REPORT DOCKET NO. 50-255 DATE 4-4-78 COMPLETED BY DTBoJ inoK TELEPHONE 616-764-913 OPERATING STATUS I. Unit Name: Palisades Plant Notes

2. Reporting Period: 3~1-78 to 3-31-78
3. Licensed Thermal Power (MWt): 2530
4. Nameplate Rating (Gross MWe): 811.7
5. Design Electrical Rating (Net MWe): 805
6. Maximum Dependable Capacity (Gross MWe):
  • 675
7. Maximum Dependable Capacity (Net !\!We):
  • 635
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

,(°'

  • .

This Month Yr.-to-Date Cumul:.itive

11. Hours Jn Reporting Period o* 2160 *55,071
12. Number Of Homs.Reactor Was Critical* 0 124.9 29.,524.3
13. Reactor Reserve Shurdown Hours 0
14. Hours Generator On-Line 0 124.8 27,957.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy GeP..erated (MWH) 0 270,336 50,292,000
17. Gross Electrical Energy Generated (~!WH) ----- 0 81,640 15,668,250
18. Net Electrical Energy Generated (M\VH) 0 76,464 14,689,831
19. Unit Service FactorI 0 5.8 50~8
20. Unit Availability F.actor 0 5.8 50.8
21. Unit C::ipacity f3ctor (Using MDC Net) 0 5.6 42.0 Unit Capacity Fa'cror (Using DER Net) 0 ~.4 33.1
23. Unit Forced Outage Rate 0 0 40.4
24. Shutdov,;ns Scheduled Over Next 6 Months (Type. D::ite. and Dur:Hion c>f Each):
25. If Shut Down At End Of Report Period. Estim::ited Date of St:::rtup:
26. Units In Test Status (Prior to Commercial Operation): forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0:\-1:\lERCf..\L OPERATION
  • Based on Condenser Backpressure Limitations

. (t) /77)

eVERAGE DAILY UNIT POWER LEVEL. e DOCKET NO.

50-255 UNIT Palisades DATE 3-04-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH -March 1978

'-

DAY A VER AGE DAILY POWER LEVEL DAY A VER..\GE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 17 0 2 0 0 18 o* 0 3 19 0 0 4 20 5 0 21 0 6 0 0 22

{ 0

__,

  • 7 -,~

0 0 0 8 24 9 0 0 25 0 0 10 26 11 0 27 0 12 0 0 28 0 0 13 29 0 0 14 30 15 0 0 31 16 0 INSlRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlll1th. Compute to the nearest whole megawatt.

(9/77)

.

-

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ___;5:....:0:......--=2-=5-=5--,-_- '~ -

UNIT NAME Palisades*

DATE 4-4-78 COMPLETED BY DIBollnow REPORT MONTH_ March 1978 616-764-8913 TELEPHONE

-

,.

,.-L_

r-1 3  ::JJ ......

c

~V'I

- <:.> *--  :::;

~

-0 .:::

-

'-'

""

v Licensee E..q-

<l.l <l.l -*

0

<l.l

-0 Cause & Corrective No. Date n.

>-, """'" -

l

~

V>

'"' ..c ::;

~

O'.'. Event -V> "O

>-. -

~

  • ~ 0 i;:::r;_;

Action to r-  ::j~

o::::. ~ ~ ..r: Report tt VJ u 0 Prevent Recurrence

E VJ ~ u 8
  • --*

1 780106 s 2,035.2 c 1 None - - N/A

,,.

3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Sche<l ulcd A-Equipment Failure (Explain)  ! -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Reguiatory Restriction 4-0t her (Exp la in) 0161)

E-Opcrator Training & License Examination F-A<lministrative 5 G-Opcrational Error (Explain) Exhibit I - Same Sm1rrc

(\J /77) !I-Other (Explai11)