consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 August 3, 1976 Hiegu!atory DocKet File USNuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 Re:

LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of July, 1976.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich.

1.{

',~

<l(. ;

APPENDlX C DOCKET NO. _ _..5..;:.0_.-2:;:;.5._.5 ___ _

UNIT Palisades DA TE

.August 3. 1976 COMPLETED BY DIBollnow AVERAGE.DAILY UNIT POWER LEVEL MONTH July 1976

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)

DAY (MWecnet) 1 384 "O*

641 2

0 18 645 3

0 19 624

.4 0

20.

551 5

14o 21

  • o 6

556 22 0

7 622 23 0

8

>620 24 Oo.

9 591 25 0

10 499 26 266 11 515

27.

587-12 641 28 600

. 13 62I 29 601 14 604 30 537 l5 607 31

_556.

16 636 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the avaage daily unit power level in 1\\.1\\Ve-net for each day in the reporting month..

Compute to the nean:st whole mi.:gJwatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum.

dependable capacity for the net electrical rating of the unit. thcfl:: m:iy be occasions when the daily

~

avi.:rage power level exci:eds the I 00% lint: (or the restricted power level* line). In such cases. the ft (

.J aver:igi.: daily unit powi.:r output sheet should bi.: footnoted to. explain the apparent anomaly.

i **.

1.16<:-1

~........-..-='"--~~--=----.-~--..-. ~....-.,....,. _ __,,,..........,,.,_,__.,..,__~ -... _..

- c:

~*"'?..,.......-µ~~

~

APPENDIX D UNIT PALISADES DATE 6 ~~st 3, 1976 1 -7 4-8913

  • cmIPLETED BY DIBollnow DOCKET N0._...::5...::0_-.=25~5<'.--__ _

OPERATING STATCS

1.

REPORTING PERIOD: __ 7.._6_0_7 __ 0_1 _________ THROUGH ___

7._,6,,,0<..j7'-3""'1...,._~-----

HOURS IN REPORTl'.':G PERIOD: ____ --L..4.:...4-'------------------------

2.

CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 720

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _

.. 4.

REASO_NS FOR RE:?T~ICTIQN (IF ;\\NY):*

THIS REPORTING PERIOD

  • 5.

HOURS REACTOR WAS CRITICAL.. __ -.. -.. *. -

  • 64o.3
6.

REACTOR RESERVE SHUTDOWN HOURS..*..*.

. :c_._:-~.'~c:~::::~'.'>.C~~~~~~:~~~tuRf~b_l~~2~6Y~~ ~c;*;.~: >;~~~'.~--~~. * : "'

555 8

9.

GROSS THER'.\\fAL ENERGY.-. -

10.

lL GENERATED ('.\\IWH) _

  • __.....** __ *.* __ *.*

GROSS ELECTRICAL ENERGY

.:CD-:ERATED ().!\\VH) _.. : __.. *. _.... __.* _ **.*

NET ELECTRICAL ENERGY GENERATED (MWH)

RL\\CTORAVAILABILITYFACTOR(l) - *..* _ -..

UNIT AVAILABILITY FACTOR (2)....*..*, *.*

l 1NIT CAPACITY FACTOR (3). -.. __.*...* - **

UNIT FORCED OUTAGE RATE (4) - _..... - **.*

326,710

.. 304,.414*: ~..

86.1%

14.1%

56.8%*

25.3%

YR TO DATE 1,846.1 1,669.0.

975,860 ~t~.

910; 010 ~,~~'

36.1%

24.7%

CU~!ULA TIVE TO DATE F(, 933.1 16,642.8 8,122,510 7, 591, 656..

44~6%*

  • 4i.li'.q6***:

-30. 5% -

51.9%.

12.
13.
14.
15.
16.

SHt:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATE!? DA TE OF STARTUP:-------------

18.

UNJTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:

{l)

REACTOR A YAILABILITY FACTOR (2) t::-HT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR t:SIT FORCED Ol'T AGE RATE INITIAL CRITICALITI INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE


XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWFR GE~ERATED DATE LAST DATE FORECAST ACHIEVED MAX. DEPENDAULE CAPACITY (MWc-NET) X HOURS IN REl'ORT!NG l'ERIOU FORCED OUTAGE HOURS


XlOO HOURS GENERATOR ON LINE.+ FORCED OUTAGE HOURS Ll6-D-l

. -~ *. s t..

. ::;, cc;;;; r+.1,.

  • .*!*~.~---
~-~ >.;=*....
  • a.
  • ~'**"'";:'I'-*.***... ?"" **?. a.i :".,c..Wf'.-.V"!-.>

. -~f/1 _.. t

    • _-?. r***

--. _.. ~..,,___,,, __

..;._~--....,--..... --.... ~.-cc~~l*---;,.., __

~,,,........... ___,._,~. ~

.. -.-~,~~*~~~.-~~-.~~-~---... -~-~~-~~~*toL.~~,****~"*"'"*~.--,,~*~,,;...,......,,,~-~~~.. :~.-

I I'

~-.

,..-~-~\\

~**-,\\

..-~*o.oi,.+-ss...,'llSitttllM~ -*""'"""b..,.*.. *..,.;..,. ____

t.wli."'Ollt~""'"'""'"-'k*r""'t"..,tt-* _....,....

,...,,........ _..,_...,._,...........,...,., _..itf...,.......,,he...

' -*-**~

I..

    • ,,,.)'

NO.

DATE 5

760701 6

760720 SU.MMARY:

\\

APPENf)1x E

. ~~

UNIT SHUTDOWNS REPORT MONTH

'JULY 1976 TYPE F*FORCED DURATIPN S*SCHEDULED * (HOURS)

REASON (1)

F.

75.2 H

113

  • A METHOD OF

~HUTTING DOWN THE REACTOR (2)

Remained Critical I

0' 3

DOCK ET NO, ---'5_.o_-"'""25'"""5 ___

~

UNIT NAME PALISADES DATE August 3,.1976 COMPLETED 13Y DIBollnow '.

CORR.ECTIVE ACTIONS/COMMENTS Generator noise anomaly.

Loss of load trip - corrected for switchyard*difficulties (1) REASON A--EQUIPMENT FAILURE'(EXPLA!N)

B-MAINT, OR TEST (2) METHOD I

I-MANUAL 2-MANUAL C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND SCRAM 3-AUTOMATIC _A:

LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)

H-OTliER (EXPLAIN)

SCRAM

~