consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 August 3, 1976 Hiegu!atory DocKet File USNuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 Re:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of July, 1976.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich.
1.{
',~
<l(. ;
APPENDlX C DOCKET NO. _ _..5..;:.0_.-2:;:;.5._.5 ___ _
.August 3. 1976 COMPLETED BY DIBollnow AVERAGE.DAILY UNIT POWER LEVEL MONTH July 1976
. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)
DAY (MWecnet) 1 384 "O*
641 2
0 18 645 3
0 19 624
.4 0
- 20.
551 5
14o 21
- o 6
556 22 0
7 622 23 0
8
>620 24 Oo.
9 591 25 0
10 499 26 266 11 515
- 27.
587-12 641 28 600
. 13 62I 29 601 14 604 30 537 l5 607 31
_556.
16 636 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the avaage daily unit power level in 1\\.1\\Ve-net for each day in the reporting month..
Compute to the nean:st whole mi.:gJwatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum.
dependable capacity for the net electrical rating of the unit. thcfl:: m:iy be occasions when the daily
~
avi.:rage power level exci:eds the I 00% lint: (or the restricted power level* line). In such cases. the ft (
.J aver:igi.: daily unit powi.:r output sheet should bi.: footnoted to. explain the apparent anomaly.
i **.
1.16<:-1
~........-..-='"--~~--=----.-~--..-. ~....-.,....,. _ __,,,..........,,.,_,__.,..,__~ -... _..
- c:
~*"'?..,.......-µ~~
~
APPENDIX D UNIT PALISADES DATE 6 ~~st 3, 1976 1 -7 4-8913
- cmIPLETED BY DIBollnow DOCKET N0._...::5...::0_-.=25~5<'.--__ _
OPERATING STATCS
- 1.
REPORTING PERIOD: __ 7.._6_0_7 __ 0_1 _________ THROUGH ___
7._,6,,,0<..j7'-3""'1...,._~-----
HOURS IN REPORTl'.':G PERIOD: ____ --L..4.:...4-'------------------------
- 2.
CURRENTLY ACTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 720
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _________ _
.. 4.
REASO_NS FOR RE:?T~ICTIQN (IF ;\\NY):*
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.. __ -.. -.. *. -
- 64o.3
- 6.
REACTOR RESERVE SHUTDOWN HOURS..*..*.
. :c_._:-~.'~c:~::::~'.'>.C~~~~~~:~~~tuRf~b_l~~2~6Y~~ ~c;*;.~: >;~~~'.~--~~. * : "'
555 8
- 9.
GROSS THER'.\\fAL ENERGY.-. -
- 10.
lL GENERATED ('.\\IWH) _
- __.....** __ *.* __ *.*
GROSS ELECTRICAL ENERGY
.:CD-:ERATED ().!\\VH) _.. : __.. *. _.... __.* _ **.*
NET ELECTRICAL ENERGY GENERATED (MWH)
RL\\CTORAVAILABILITYFACTOR(l) - *..* _ -..
UNIT AVAILABILITY FACTOR (2)....*..*, *.*
l 1NIT CAPACITY FACTOR (3). -.. __.*...* - **
UNIT FORCED OUTAGE RATE (4) - _..... - **.*
326,710
.. 304,.414*: ~..
86.1%
14.1%
56.8%*
25.3%
YR TO DATE 1,846.1 1,669.0.
975,860 ~t~.
910; 010 ~,~~'
36.1%
24.7%
CU~!ULA TIVE TO DATE F(, 933.1 16,642.8 8,122,510 7, 591, 656..
44~6%*
- 4i.li'.q6***:
-30. 5% -
51.9%.
- 12.
- 13.
- 14.
- 15.
- 16.
SHt:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATE!? DA TE OF STARTUP:-------------
- 18.
UNJTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
{l)
REACTOR A YAILABILITY FACTOR (2) t::-HT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR t:SIT FORCED Ol'T AGE RATE INITIAL CRITICALITI INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
XlOO HOURS IN REPORTING PERIOD NET ELECTRICAL POWFR GE~ERATED DATE LAST DATE FORECAST ACHIEVED MAX. DEPENDAULE CAPACITY (MWc-NET) X HOURS IN REl'ORT!NG l'ERIOU FORCED OUTAGE HOURS
XlOO HOURS GENERATOR ON LINE.+ FORCED OUTAGE HOURS Ll6-D-l
. -~ *. s t..
. ::;, cc;;;; r+.1,.
- .*!*~.~---
- ~-~ >.;=*....
- a.
- ~'**"'";:'I'-*.***... ?"" **?. a.i :".,c..Wf'.-.V"!-.>
. -~f/1 _.. t
- _-?. r***
--. _.. ~..,,___,,, __
..;._~--....,--..... --.... ~.-cc~~l*---;,.., __
~,,,........... ___,._,~. ~
.. -.-~,~~*~~~.-~~-.~~-~---... -~-~~-~~~*toL.~~,****~"*"'"*~.--,,~*~,,;...,......,,,~-~~~.. :~.-
I I'
~-.
,..-~-~\\
~**-,\\
..-~*o.oi,.+-ss...,'llSitttllM~ -*""'"""b..,.*.. *..,.;..,. ____
t.wli."'Ollt~""'"'""'"-'k*r""'t"..,tt-* _....,....
,...,,........ _..,_...,._,...........,...,., _..itf...,.......,,he...
- ' -*-**~
I..
- ,,,.)'
NO.
DATE 5
760701 6
760720 SU.MMARY:
\\
APPENf)1x E
. ~~
UNIT SHUTDOWNS REPORT MONTH
'JULY 1976 TYPE F*FORCED DURATIPN S*SCHEDULED * (HOURS)
REASON (1)
F.
75.2 H
113
- A METHOD OF
~HUTTING DOWN THE REACTOR (2)
Remained Critical I
0' 3
DOCK ET NO, ---'5_.o_-"'""25'"""5 ___
~
UNIT NAME PALISADES DATE August 3,.1976 COMPLETED 13Y DIBollnow '.
CORR.ECTIVE ACTIONS/COMMENTS Generator noise anomaly.
Loss of load trip - corrected for switchyard*difficulties (1) REASON A--EQUIPMENT FAILURE'(EXPLA!N)
B-MAINT, OR TEST (2) METHOD I
I-MANUAL 2-MANUAL C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND SCRAM 3-AUTOMATIC _A:
LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTliER (EXPLAIN)
~