Category:Operating Report
Jump to navigation
Jump to search
(previous page) (next page)
Category Used between: 7 January 1971 to 5 May 2025
Plant
University
Fuel Processing
- BWX Technologies (0)
- Barnwell (0)
- Claiborne (0)
- Consolidated Interim Storage Facility (0)
- Eagle Rock (0)
- Erwin (0)
- Framatome ANP Richland (0)
- Global Nuclear Fuel (0)
- HI-STORE (0)
- Holtec (0)
- Orano USA (0)
- Paducah Gaseous Diffusion Plant (0)
- Portsmouth Gaseous Diffusion Plant (0)
- Triso-X (0)
- West Valley Demonstration Project (0)
- Wood River Junction (0)
Laboratory
- 05000470 (0)
- Battelle Memorial Institute (0)
- Dow Chemical Company (0)
- General Atomics (0)
- Hermes (0)
- Idaho National Laboratory (0)
- Knolls Atomic Power Laboratory (0)
- Los Alamos National Laboratory (0)
- Lynchburg Research Center (0)
- National Bureau of Standards Reactor (11)
- National Institute of Standards and Technology (0)
- National Renewable Energy Lab (0)
- Northwest Medical Isotopes (0)
- Oak Ridge National Laboratory (0)
- PM-1 (0)
- PM-2A (0)
- Pacific Northwest National Laboratory (0)
- Plum Brook (0)
- SHINE Medical Technologies (1)
- SM-1 (0)
- SM-1A (0)
- Sandia National Laboratories (0)
- Tuxedo (0)
- U.S. Geological Survey (0)
- Vanowen (0)
- Waltz Mill (0)
Hospital
- Advocate Illinois (0)
- Avera McKennan Hospital (0)
- Banner Boswell Medical Center (0)
- Bard Brachytherapy (0)
- Dermatology of Seattle and Bellevue (0)
- Fred Hutchinson Cancer Center (0)
- George Washington Hospital (0)
- Karmanos Cancer Institute (0)
- Kennedy Memorial Hospital (0)
- Lincoln Memorial Hospital (0)
- Northwestern Memorial Hospital (0)
- Piedmont Hospital (0)
- UMass Memorial Health Medical Center (0)
- University Hospitals of Cleveland (0)
- West Virginia University Hospital (0)
Manufacturer
- 05200045 (0)
- Braun Intertec Corporation (0)
- Electric Boat (0)
- Martinez Refining Company (0)
- Mistras Group (0)
- Reliable Testing Services (0)
- Sacyr Construction (0)
- Screaming Eagle Coal (0)
- Tilden-Mine (0)
Agency
Pages in category "Operating Report"
The following 200 pages are in this category, out of 621 total.
(previous page) (next page)0
3
- 3F0602-04, May 2002 Monthly Operating Report for Crystal River Unit 3
- 3F1107-07, Core Operating Limits Report, Cycle 16, Revision 0 and Revision 1
- 3F1205-05, Core Operating Limits Report, Cycle 15, Revision 0 and Revision 1
- 3F1206-06, Transmittal of Crystal River, Unit 3 - 10 CFR 50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report
B
- BSEP 12-0098, Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment
- BW020028, Core Operating Limits Report Cycle 10 Sequence Number 4
- BYRON 2002-0005, To Byron Stations 1 and 2, Cycles 11a and 10a, Core Operating Limits Reports
- BYRON 2018-0109, 10 CFR 50.59 Summary Report
- BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report
C
- CP-201300139, Transmittal of 10CFR50.59 Evaluation Summary Report 017, 10CFR72.48 Evaluation Summary Report 002, and Commitment Material Change Evaluation Report 011
- CP-202000285, Pressure and Temperature Limits Report (Ptlr), ERX-07-003, Revision 5
- CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report
- CPSES-200201029, Cycle 7 Core Operating Limits Report
D
- DCL-02-062, Core Operating Limits Report, Cycle 12
- DCL-05-001, Pressure and Temperature Limits Report (Ptlr). Revision 3
- DCL-05-047, Pressure and Temperature Limits Report (PTLR-1), Revision 5
- DCL-07-049, Annual Nonradiological Environmental Operating Report
- DCL-13-030, Core Operating Limits Report for Unit 2 Cycle 18
- DCL-14-101, Core Operating Limits Report for Unit 2 Cycle 19
- DCL-18-071, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2017
- DCL-20-043, Thirty-Day Notification Report of Significant Emergency Core Cooling System Evaluation Model Changes That Affect Peak Cladding Temperature and 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Mode
G
H
- HL-6232, Cycle 21 Core Operating Limits Report
- HNP-04-122, Cycle 13 Core Operating Limits Report
- HNP-09-108, Submittal of Operating Report of Changes Pursuant to 10 CFR 50.59
- HNP-10-044, Annual Environmental (Nonradiological) Operating Report
- HNP-13-116, Cycle 19 Core Operating Limits Report, Revision 0
J
- JAFP-04-0190, In-Vessel Visual Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)
- JAFP-05-0187, Core Operating Limits Report Revisions 19 & 20 (Cycle 17 Update)
- JAFP-09-0117, Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008
- JAFP-19-0050, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2017 and 2018
L
- L-04-144, CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models
- L-05-077, Cycle 17 Core Operating Limits Report Mid-Cycle Revision
- L-05-134, July 2005 Monthly Operating Report for Beaver Valley Power Station Unit 1 & 2
- L-06-153, Report of Facility Changes, Tests and Experiments
- L-07-113, License Renewal Application. Appendix E: Applicants Environmental Report
- L-09-217, Submittal of Report of Facility Changes, Tests and Experiments
- L-19-050, Stations - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments
- L-19-052, Report of Facility Changes, Tests and Experiments
- L-19-201, Report of Facility Changes, Tests, and Experiments
- L-20-138, Report of ECCS Model Changes and Errors Pursuant to 10 CFR 50.46
- L-2004-097, Annual Radiological Environmental Operating Report
- L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owners Activity Report (OAR-1)
- L-2007-053, Annual Radiological Environmental Operating Report
- L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08
- L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009
- L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 2011
- L-2012-367, Cycle 20 Core Operating Limits Report
- L-2017-165, Report of 10 CFR 50.59 Plant Changes
- L-2020-065, Submission of Periodic Reports
- L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report
- L-2021-096, 10 CFR 50.59(d)(2) Summary Report
- L-2021-097, And Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report
- L-2022-016, Report of 10 CFR 50.59 Plant Changes
- L-2022-039, And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
- L-2023-051, Report of 10 CFR 50.59 Plant Changes
- L-2025-039, Annual Radiological Environmental Operating Report for Calendar Year 2024
- L-22-102, Report of Facility Changes, Tests, and Experiments
- L-23-222, Report of Facility Changes, Tests, and Experiments for the Period from October 9, 2021 to October 9, 2023
- L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments
- L-MT-14-046, Submittal of the Pressure and Temperature Limits Report (Ptlr), Revision 1
- L-MT-15-036, 2014 Annual Radiological Environmental Operating Report
- L-MT-18-053, Thirty Day Report of Changes in the Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46
- L-MT-19-036, Update to 2018 Report of Changes in the Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46
- L-PI-12-118, Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 1, Cycle 28, Revision 0
- L-PI-14-112, Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 1, Cycle 29, Revision 0
- LIC-04-0023, May 2004 Monthly Operating Report for Fort Calhoun Station, Unit 1
- LIC-05-0044, Annual Radiological Environmental Operating Report for 01/01/2004 Through 12/31/2004
- LIC-07-0040, Radiological Environmental Operating Report Technical Specification 5.9.4.b, January 01, 2006 - December 31, 2006
- LIC-13-0044, Omaha Public Power District - Transmittal of Fort Calhoun Station (Fcs), Unit No. 1, Core Operating Limit Report (Colr), Revision 41
- LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 2
- LR-N05-0196, Report of Changes, Tests and Experiments
- LR-N05-0197, Report of Changes, Tests and Experiments
- LR-N05-0587, November 2005 Monthly Operating Report for Hope Creek
- LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report
- LR-N08-0221, Submittal of Report Changes in the Application of Emergency Core Cooling System Evaluation Models as Required by 10 CFR 50.46
- LR-N13-0210, Annual 10 CFR 50.46 Report
- LR-N18-0136, Report of 10 CFR 72.48 Changes, Tests, and Experiments
- LR-N19-0003, Report of Changes, Tests, and Experiments
- LR-N19-0093, 2019 Annual 10 CFR 50.46 Report
- LR-N21-0055, Corrected Report of Changes, Tests, and Experiments
- LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments
M
- M190171, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2019
- ML013600520
- ML020080075
- ML020160524
- ML020580392
- ML020810254
- ML020840330
- ML020860034
- ML020990327
- ML021020267
- ML021140362
- ML021370029
- ML021440049
- ML021960448
- ML021960456
- ML022240123
- ML022340213
- ML022540256
- ML022830214
- ML022960520
- ML023190406
- ML023250221
- ML023310576
- ML023460012
- ML030100246
- ML030760176
- ML030920211
- ML031050390
- ML031410809
- ML031410827
- ML040200698
- ML040200707
- ML040210502
- ML040280417
- ML040290881
- ML041190432
- ML041420485
- ML042030316
- ML042400106
- ML042880472
- ML042890080
- ML042890081
- ML042940288
- ML043010426
- ML043070616
- ML043210142
- ML043350369
- ML043630429
- ML050140187
- ML050240371
- ML050530270
- ML050670505
- ML050740471
- ML050820233
- ML050840446
- ML050870454
- ML050940241
- ML050950302
- ML050960227
- ML051080060
- ML051170237
- ML051240116
- ML051240297
- ML051790240
- ML052280254
- ML052500400
- ML052580169
- ML052660232
- ML053070225
- ML053320593
- ML060040305
- ML060380537
- ML060410217
- ML061710503
- ML061710507
- ML062140066
- ML062370350
- ML063390090
- ML070580236
- ML070680178
- ML070730423
- ML070860217
- ML070870123
- ML070880036
- ML071070321
- ML071090247
- ML071560493
- ML071560504
- ML072270377
- ML072620444
- ML073170716
- ML073180255
- ML073300455
- ML073450500
- ML080520371
- ML081200804
- ML081650071
- ML083450712
- ML090330076
- ML090620593
- ML090980301
- ML091400182
- ML091680196
- ML092180406
- ML092180407
- ML093500093
- ML100780547
- ML101520236
- ML102460026
- ML102940362
- ML11111A196