- 1 consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 May 3, 1976 USNuclear Regulatory Commiss:r:
Mail and Records Section Washington, D.C., 20555 Re; LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of April, 1976.
William E. Adams General Engineer c.c.: JGKeppler, NRC RBDeWitt RBSewell DEVanFarowe, Div. of Radiological Health Lansing, Mich.
~
)
- -c * ~
APPENDIX C
- \\,-
DOCKET NO. 50-255 UNIT Palisades DATE 5-3-76 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL.
MONTH April 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)
DAY (MWe-net) 1 0
17*
0 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24
- o.
9 0
25 0
10 0
26 0
11 0
- 27.
0 12
. 28 0
13 0
29 0
14 0
30 0
l5 0
31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily 1
average power levd exceeds the 100% line (or the restricted power level* line). In such cases, the
(:.
aver:ige daily unit power output sheet should be footnoted to explain the ap.parcnt anomaly.
,I
-1 1.16-C 1
--- ~=~-~--.. ---~~* -~-~-~=~~~-~*--*::*-*==-=~"'7'.~
APPENDIX D UNIT --=P:...::a::::l::.:i::..:S::.::a="=d:::;e.,_s!"'-.._ __
DATE 5-0-76 616-764-8913
. COMPLETED BY DIBollnow DOCKET No.~50.=:..--=2:.5!...<5~----
OPERATING STATCS
- 1.
REPORTING PERIOD: __
7,_6_0.;_4c...0;...::l=----------- THROUGH 760430 HOURS IN REPORTl'.':G PERIOD: __
7-'-'1~9o<....--___
=-=-=------'-------------------,,-~--
- 2.
CURRENTLY At.:THORIZED POWER LEVEL (M.Wth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):
630
- 4.
REASONS FOR RESTRICTION (IF ANY):
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
(I}
CUMULATIVE THIS REPORTING PERIOD YR TO DATE TO DATE HOURS REACTOR WAS CRITICAL.............
0 0
16~087 REACTOR RESERVE SHUTDOWN HOURS 0
0 0
HOURS GENERA TOR ON LINE.......... *.. *.
0 0
142273.8 UNJT RESERVE SHUTDOWN HOURS..... *. * *.
- 0 0
0 GROSS THERMAL ENERGY GENERATED (:>!WH).......*.* _. *. *......
0 0
23,019,960 GROSS ELECTRICAL ENERGY
-GENERATED (:>IWH)... : * -........ : *..*..
0 0
. 7.21462.650 0
6,681,638
- 0.
42:4t.*
0 32° %.
0
- 28.1'1> -
0 54.1~
NET ELECTRICAL ENERGY GENERATED (MWll)....*. _..*...*.....*.. _......
REACTOR AVAILABILITY FACTOR(!).... -...*
UNIT AVAILABILITY FACTOR (2)......... - *.
l'NIT CAPACITY FACTOR (3)...............
UNIT FORCED OUTAGE RATE (4)........*..*
0 0
0 0
SHL:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA TE OF STARTUP: ___
5_-_6_--'-7_6_._* ______
UNITS IN TEST STATUS (PRIOR TO Cm.1MERCIAL OPERATION) REPORT THE FOLLOWING:
REACTOR A \\'AILABll..ITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RE,\\CTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST FORECAST DATE ACHIEVED (2) l:NIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE
-XlOO HOURS IN REPORTING PERIOD UNIT CAPACITY FACTOR NFT ELECTRIC' AL POWF.R GFNERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING l'ERlO})
CNIT FORCED Ol1TAGE RATE FORCED OUTAGE HOURS
~~---~-~-~--~-~-~----XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-l
~
'.-.~.~.-
...... ---=-.. '
.--~,-~-;::: '\\
-*.' ~
r
~ l.
APPE.NDIX E DOCKET NO. -~50_;.;._2..:o...5:::-5 ___
\\
UNIT SHUTDOWNS UNIT NAME _P_a_l_i_sa_d_e_s__
j l DA TE ___.5_-...:;;..3--'7_6___
I.
p~
.,..~~~:
~
,~
............... ~-.o,;;**jill:**
.,,..""'"'"'h~S*it!""**...
O.i(""-*'11..._.,. -*.....
11....
..,...,...;,*...,,*w..:.;,*..,.......,..,.
..,0...,,. ll""llu"""""'
c£_.....
1t,_.,..._.,............ +-'l
~.
COMPLETED UY __
D_IB_o_l_l_n_ow__
f
~
REPORT MONTH _A....;;;;p;..._r_il_l9;._7;..._6 __
TYPE METHOD OF l
9\\
F*FORCED DURATION
$HUTTING DOWN NO.
DATE S*SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS 10 751220 s
280.4 c
3 Item #1 is a continuing Ref'ueling Outage noted as Item #10 l
s 2903.
c (1) REASON (2) METHOD A**EQUIPMENT FAILURE' (EXPLAIN)
!-MANUAL B* MAINT. OR TEST 2-MANUAL C-*REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERATIONALERROR (EXPLAIN)
H-OTHE!t (EXPLAIN)
- 1
- ~
l l
SUMMARY
')'
...