Monthly Operating Data for April 1976
ML18347A825
Person / Time
Site: Palisades 
Issue date: 05/03/1976
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A825 (4)


Text

.'l

  • 1 consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 May 3, 1976 USNuclear Regulatory Commiss:r:

Mail and Records Section Washington, D.C., 20555 Re; LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of April, 1976.

William E. Adams General Engineer c.c.: JGKeppler, NRC RBDeWitt RBSewell DEVanFarowe, Div. of Radiological Health Lansing, Mich.

~

)

  • -c * ~

APPENDIX C

  • \\,-

DOCKET NO. 50-255 UNIT Palisades DATE 5-3-76 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL.

MONTH April 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)

DAY (MWe-net) 1 0

17*

0 2

0 18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24

  • o.

9 0

25 0

10 0

26 0

11 0

27.

0 12

. 28 0

13 0

29 0

14 0

30 0

l5 0

31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily 1

average power levd exceeds the 100% line (or the restricted power level* line). In such cases, the

(:.

aver:ige daily unit power output sheet should be footnoted to explain the ap.parcnt anomaly.

,I

-1 1.16-C 1

--- ~=~-~--.. ---~~* -~-~-~=~~~-~*--*::*-*==-=~"'7'.~

APPENDIX D UNIT --=P:...::a::::l::.:i::..:S::.::a="=d:::;e.,_s!"'-.._ __

DATE 5-0-76 616-764-8913

. COMPLETED BY DIBollnow DOCKET No.~50.=:..--=2:.5!...<5~----

OPERATING STATCS

1.

REPORTING PERIOD: __

7,_6_0.;_4c...0;...::l=----------- THROUGH 760430 HOURS IN REPORTl'.':G PERIOD: __

7-'-'1~9o<....--___

=-=-=------'-------------------,,-~--

2.

CURRENTLY At.:THORIZED POWER LEVEL (M.Wth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):

630

4.

REASONS FOR RESTRICTION (IF ANY):

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

(I}

CUMULATIVE THIS REPORTING PERIOD YR TO DATE TO DATE HOURS REACTOR WAS CRITICAL.............

0 0

16~087 REACTOR RESERVE SHUTDOWN HOURS 0

0 0

HOURS GENERA TOR ON LINE.......... *.. *.

0 0

142273.8 UNJT RESERVE SHUTDOWN HOURS..... *. * *.

  • 0 0

0 GROSS THERMAL ENERGY GENERATED (:>!WH).......*.* _. *. *......

0 0

23,019,960 GROSS ELECTRICAL ENERGY

-GENERATED (:>IWH)... : * -........ : *..*..

0 0

. 7.21462.650 0

6,681,638

0.

42:4t.*

0 32° %.

0

  • 28.1'1> -

0 54.1~

NET ELECTRICAL ENERGY GENERATED (MWll)....*. _..*...*.....*.. _......

REACTOR AVAILABILITY FACTOR(!).... -...*

UNIT AVAILABILITY FACTOR (2)......... - *.

l'NIT CAPACITY FACTOR (3)...............

UNIT FORCED OUTAGE RATE (4)........*..*

0 0

0 0

SHL:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DA TE OF STARTUP: ___

5_-_6_--'-7_6_._* ______

UNITS IN TEST STATUS (PRIOR TO Cm.1MERCIAL OPERATION) REPORT THE FOLLOWING:

REACTOR A \\'AILABll..ITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RE,\\CTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST FORECAST DATE ACHIEVED (2) l:NIT AVAILABILITY FACTOR HOURS GENERATOR ON LINE


-XlOO HOURS IN REPORTING PERIOD UNIT CAPACITY FACTOR NFT ELECTRIC' AL POWF.R GFNERATED MAX. DEPENDABLE CAPACITY (MWe-NET) X HOURS IN REPORTING l'ERlO})

CNIT FORCED Ol1TAGE RATE FORCED OUTAGE HOURS

~~---~-~-~--~-~-~----XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-l

~

'.-.~.~.-

...... ---=-.. '

.--~,-~-;::: '\\

-*.' ~

r

~ l.

APPE.NDIX E DOCKET NO. -~50_;.;._2..:o...5:::-5 ___

\\

UNIT SHUTDOWNS UNIT NAME _P_a_l_i_sa_d_e_s__

j l DA TE ___.5_-...:;;..3--'7_6___

I.

p~

.,..~~~:

~

,~

............... ~-.o,;;**jill:**

.,,..""'"'"'h~S*it!""**...

O.i(""-*'11..._.,. -*.....

11....

..,...,...;,*...,,*w..:.;,*..,.......,..,.

..,0...,,. ll""llu"""""'

c£_.....

1t,_.,..._.,............ +-'l

~.

COMPLETED UY __

D_IB_o_l_l_n_ow__

f

~

REPORT MONTH _A....;;;;p;..._r_il_l9;._7;..._6 __

TYPE METHOD OF l

9\\

F*FORCED DURATION

$HUTTING DOWN NO.

DATE S*SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS 10 751220 s

280.4 c

3 Item #1 is a continuing Ref'ueling Outage noted as Item #10 l

s 2903.

c (1) REASON (2) METHOD A**EQUIPMENT FAILURE' (EXPLAIN)

!-MANUAL B* MAINT. OR TEST 2-MANUAL C-*REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERATIONALERROR (EXPLAIN)

H-OTHE!t (EXPLAIN)

  • 1
  • ~

l l

SUMMARY

')'

...