Text
,...t.
'ti9-:---,_~*;;;::;;.::---.,
- i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen:
Re:
License Reports DPR-20 Docket No.:
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*
JAM: DB cc:
J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J
\\-_
I
~-*O
- .-
- .h APPENDIX C
- DOCKET NO. -~5_0-_2~5~5 __
UNIT __
P_a_l_i_s_a_d_e_s_
DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net)
DAY (MWe-net) 1 505 17*.
495 2
504 18 I"
482 3
506 19' 488 4
494 20 408 5
427 21 0
6 504 22 7
507 23 0
B 503 24
. 0 9
504 25 0
. 10 5.DO 26 o*
11 428
- 27.
6 12 505 28 0
13 211 29 0
14 208 30 1"5 505 31 16
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the
- --~
Q*:**.
- averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.
(9
-~..
. L 1.10.C-l.
.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~l"""."1'>1'"*"~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -*
- ~. l !
- ~ l..
- ~
. j 0
' TYPE F-FORCED NO.
DATE S-SCHEDULED 3
750620 F.
4 750630 F
- "*W*****-'~iw->i'i*<rn1'"'1w
- l;L,'
....,,_,._.,...bc,.......... _...,.,:...o
......... w.... *--~--.......,--,,_,. _........_.
\\*,_..........,
DURATION (HOURS) 227.3 7.9
~
0 APPENDIX E UNlT SHUTDOWNS
.o DOCKETNO. --"-50_-_25~5 ___ _
UNIT NAME Palisades
- DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __
METHOD OF
$HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
l Shutdown to Repair CRDM Seal Leak R
2 Feedwater Pump trip
'\\
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC*
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR.
(EXPLAIN)
H-OTHER (EXPLAIN)
I
SUMMARY
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down.
The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.
'i
~
~
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---*
l
'j *. '.... _;.-
- e
( 0 c;**,*Q.'.
>[*.*
APPENDIX D*
,/
UNIT __
P_a_l_i_s_a_d_e_s __
DATE July 2 J.;975
- 616-764-8913.
' COMPLETED BY __
J_._A_._M_e_in_c_k_e_
DOCKET N0. __
5_0_-_2'--5 5'-----
OPERATING STATt;S
- 1.
REPORTING PERIOD: ___
7_5_0_6_0_l ________ THROUGH ___
7'-5_0_6-'3_0 __ ~----
HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,---
- 2.
CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth).
2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4
- 3.
LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
6_3~0 _____ _
- 4.
REASONS FOR RESTRICTION (IF AN,Y):
Power.restricted to 2100 Mvrt due to reduced*
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.
THIS CUMULATIVE REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL........*....
- 6.
REACTOR RES!ORYE SHUTDOWN HOURS......*
- 7.
HOURS GENERA TOR ON LINE. *...........*.*
- 8.
UNJT RESERVE SHUTDOWN HOURS. *.. ~......*
- 9.
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*.
- 10.
GROSS ELECi:RICAL ENERGY
- 11.
l :!.
- 13.
- 14.
GENERA TED ('.\\!Wll)................*....
NET ELECTRICAL ENERGY GENERATED
(!\\!Will...................*..*.*....
REACTOR AVAILABILITY fACTOR (!).........
UNIT AVAILABILITY FACTOR (2)...**.**.*..
l 1NIT C-AP.*\\CITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)...*.....*..
492.7
/" 0 485.5 0
873,360 257,000 68.4~
61.4' 0 48.4%
32.6%
YR TO DATE 1,976.5 0
1,887.3 0
3,175,872 952,840 881,977 "45.5%
' 43*.4~
29.7°/o
_26.6%
TO DATE 12,213.4 0
11, 208. 4 0
17,289,432 5,457,090 5,135,682 39.9%.
_,;.;36_._6%;
28.J%
60.8%
- 15.
- 16.
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Steam Generator inspect1:si~l1~~st, 8 weeks_.
- 17.
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *.
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J