Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades
ML24183A125
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/2024
From: John Moses
NRC/NMSS/DREFS
To: Gould G
Swan Creek Black River Confederated Ojibwa Tribes of Michigan
References
EPID L-2024- LNE-0003
Download: ML24183A125 (1)


Text

Gerald Gould, Chairman Swan Creek Black River Confederated Ojibwa Tribes of Michigan P.O. Box 2937 1220 Court Street Saginaw, MI 48602

SUBJECT:

INITIATION OF SCOPING PROCESS TO PREPARE AN ENVIRONMENTAL ASSESSMENT FOR THE ENVIRONMENTAL REVIEW OF HOLTEC DECOMMISSIONING INTERNATIONAL, LLCS LICENSING AND REGULATORY REQUESTS FOR REAUTHORIZATION OF POWER OPERATIONS AT PALISADES NUCLEAR PLANT (EPID NUMBER: L-2024-LNE-0003) (DOCKET NUMBER: 50-0255)

Dear Chairman Gerald Gould:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review for a series of licensing and regulatory requests submitted by Holtec Decommissioning International, LLC (HDI) that seek NRC approvals to reauthorize power operations at the Palisades Nuclear Plant (PNP). These requests include an exemption request, a license transfer request, and license amendment requests. Concurrently, the U.S. Department of Energys (DOE) Loan Programs Office (LPO)s proposed action, pursuant to its authority under Title 17 of the Energy Policy Act of 2005, as amended, is the consideration of providing Federal financial assistance (a loan guarantee) to support the reauthorization of power operations at PNP. Accordingly, the DOE LPO will serve as a cooperating agency on the environmental review while the NRC will serve as the lead Federal agency for the environmental review under the National Environmental Policy Act of 1969, as amended (NEPA) and Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended. The purpose of this letter is to inform you about the NRCs environmental review activities. provides a table which lists the submittals received and the NRCs Agencywide Documents Access and Management Systems (ADAMS) accession numbers for each submittal and the associated NRC acceptance letters. This information can also be found on the NRCs website at https://www.nrc.gov/info-finder/reactors/pali.html.

The PNP is located in Van Buren County, Michigan, along the shore of Lake Michigan, approximately 2.5 miles northwest of Covert Township (Enclosure 2). PNP permanently ceased operations on May 20, 2022, after more than 40 years of commercial operation. In early 2023, HDI, the licensee for PNP, expressed an interest in returning the plant to an operational status.

As mentioned, HDI is pursuing several licensing and regulatory actions to restore the operational licensing basis for the plant. The NRC will review HDIs submittals to ensure that HDIs proposal to restore the licensing basis of the plant to an operational status will comply with NRC safety, security, and environmental requirements. The licensing and regulatory requests, if approved, would allow for the placement of fuel into the reactor vessel and restart of July 1, 2024 G. Gould

power operations in Unit 1 for the duration of the renewed facility operating license term, which expires in 2031.

By letter dated June 18, 2024 (ML24169A434), the NRC accepted the last submittal associated with the licensing and regulatory requests to potentially reauthorize power operations at PNP.

As part of the review of these requests, the NRC staff is preparing an environmental assessment (EA) as required by Title 10 of the Code of Federal Regulations (10 CFR) Part 51, the NRCs regulations that implement NEPA. The NRC staff published a Notice of Intent (NOI) in the Federal Register on June 27, 2024 ( 89 FR 53659), thereby initiating the NRCs environmental review under NEPA. This notice informs the public that the NRC intends to conduct a 30-day scoping period to gather the information necessary to prepare an EA related to the review of the licensing and regulatory requests for the potential reauthorization of power operations at PNP.

In accordance with 36 CFR 800, Protection of Historic Properties, Section 800.8(c), the NRC is using the NEPA process to comply with Section 106 of the NHPA, in lieu of the procedures set forth in 36 CFR 800.3 through 800.6. Pursuant to 36 CFR 800.2(a)(2), NRC will serve as the lead federal agency for NRCs undertaking and DOE LPOs undertaking. The EA will include identification of historic and cultural resources and historic properties, an analysis of potential effects of the proposed actions, as well as the NRC staffs preliminary determinations. The NRC is in the process of determining the direct and indirect Area of Potential Effect (APE) for the exemption request.

As discussed in the NOI, the NRC and DOE LPO are providing the public with the opportunity to participate in a hybrid environmental scoping meeting to be held on July 11, 2024, at 6:00 p.m.

eastern time (ET), at Mendel Center, Grand Upton Hall, at Lake Michigan College, 1100 Yore Ave, Parking Lot 3, Benton Harbor, Michigan, 49022, and will also hold an open house from 5:00 p.m. to 6:00 p.m. ET. Additional information including an agenda for the meeting can be found on the NRCs Public Meeting Schedule website at https://www.nrc.gov/pmns/mtg. 1 At this meeting, the NRC and DOE LPO staff will present an overview of the environmental review process, hold a brief question and answer session, and will solicit comments on the scope of the environmental review. Members of the public will have an opportunity to provide comments during the meeting.

In accordance with the NRCs January 9, 2017, Tribal Policy Statement (82 FR 2402), the NRC wishes to ensure that State-recognized Tribes are afforded the opportunity to participate in the NRCs licensing and regulatory processes. The NRC invites you to submit any comments or concerns that you may have on the scope of the environmental review by July 29, 2024.In addition to the public scoping meeting, comments may be submitted by any of the following methods or directly to the points of contact listed below:

  • Email comments to: PalisadesRestartEnvironmental@nrc.gov;
  • Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff; or

1 The meeting announcement can be found by going to the NRCs public meeting website at https://www.nrc.gov/pmns/mtg and locating the July 11 th public scoping meeting entry. Additional information about the meeting (e.g., agenda) can be found by clicking the links in the scoping meeting entry.

The NRC expects to issue the draft EA for public review and comment by January 2025. A copy of the draft EA will be made available for your review and comment.

If you have any questions concerning the NRCs environmental review, please contact Jennifer Davis, staff archaeologist at 301-415-3835 or via email at Jennifer.Davis@nrc.gov; or the environmental project manager, Laura Willingham, at 301-415-0857 or via email at Laura.Willingham@nrc.gov.

Sincerely, John M. Moses, Deputy Director Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket No. 50-255

Enclosures:

1. Holtec Decommissioning International, LLC, Submittals to Reauthorize Power Operations at the Palisades Nuclear Plant
2. Figure 1 - A map of the Palisades Site Layout (see dashed line for the site boundary) from the 2006 Supplemental Environmental Impact Statement (see Figure 2-3 in ML062710300) cc: Listserv Signed by Moses, John on 07/01/24

ML24183A125 *via Email OFFICE PM:REFS/ETR1 LA:REFS/EPM2 PM:REFS/EPM3 BC:REFS/EPM3 BC:REFS/ETR1 NAME JDavis AWalker-Smith LWillingham DBarnhurst MRome DATE 6/20/2024 6/20/2024 6/26/2024 6/27/2024 6/28/2024 OFFICE OGC DD:REFS NAME MASpencer* JMoses DATE 6/28/2024 7/1/2024

Holtec Decommissioning International, LLC, Submittals to Reauthorize Power Operations at the Palisades Nuclear Plant

Holtec Decommissioning International, LLC ADAMS1 NRC Acceptance Submittal Accession No. Letter ADAMS Accession No.

Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82, dated ML23271A140 ML23291A440 September 28, 2023.

Application for Order Consenting to Transfer of Control of License and Conforming License ML23340A161 ML24012A242 Amendments, dated December 6, 2023.

Request to Revise Operating License and Technical Specifications to Support Resumption ML23348A148 ML24022A117 of Power Operations, dated December 14, 2023.

Request to Revise the Administrative Technical Specifications to Support Resumption of Power ML24040A089 ML24060A221 Operations, dated February 9, 2024.

Request to Reinstate the Palisades Emergency Plan to Support Resumption of Power ML24122C666 ML24141A119 Operations, dated May 1, 2024.

Request to Revise the Main Steam Line Break Methodology for Palisades Nuclear Plant to ML24145A145 ML24169A434 Support Resumption of Power Operations, dated May 24, 2024.

1 Publicly available documents can be found online in the NRC's Agencywide Documents Access and Management Systems (ADAMS) Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209 or 301-415-4737, or by email to PDR.Resource@nrc.gov.

Enclosure 1 Figure 1 - A map of the Palisades Site Layout (see dashed line for the site boundary) from the 2006 Supplemental Environmental Impact Statement (see Figure 2-3 in ML062710300)

Enclosure 2