consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 May 3, 1978 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data, and a summary of Operating Experience for the Palisades Nuclear Plant for the month of April 1978.
WEAdams General Engineer cc:
JGKeppler, USNRC RBDeWitt DABixe.1 GHPetitjean CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
AKozlowski, Mich. Dept. of Labor RCallen, Mich. Public Service Comm., Lansing, Mich.
Document Control -
(2) 950-22.35.10
OPERATING DATA REPORT OPERA TING STATUS I. Unit Name:
Palisades 7804.01 - 780430
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. l\\foximum Dependable Capacity (Gross 71-1We): *
- 7. Maximum Dependable Capacity (Net MWe):
2530 81L7 805
- 675.
- 635.
Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 5-2-78
- DIBollnov;r 616-764-8913
- q. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restricrions, If Any:
- 11. Hours Jn Reporting Period
- 12. Number Of H01:rs Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (i\\lWH)
- 18. Net Electrical Energy Generated (\\lWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit C:ip:icity Factor (Using MDC Net)
This Month 428.* 4 223. 2*
381,600 111,17_Q_ ___ _
101,584*
31.0%
31.0%
Yr.-to-Date 2 '879*
553.3 348.0 Cumubtive 55,790-29,95~.7 28,180.2
--~6=5=1
~*
9'-=3~6 5 0 '6 7 3' 6 00 192,810 15,779,420 178,048 14~791,415 1_2. l %
50.5%
12.1%
50.5%
22.2%
--~~---9.7%
41.8%
17.5%
7~.7%
32.9%
Unil C::pacity Factur (Using DER Net)
- 23. Unit Forced Outage Rate 5.5%
3_.6_% ______ 4_0.2%
2-J.. Shutdowns Scheduled Over Next 6 Months (Type. DJte. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated D:ite of St::irtup: -------------------
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INiTIAL ELECTRICITY CO\\l:VIERCl.-\\L OPERATION Forecast Achieved
- Based on Condenser Backpressure Limitations
. (CJ/77)
~
VERAGE DAILY UNIT POWER LEVEL
- DOCKET NO.
50-255 UNIT Palisades DATE 5~2-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH April 1978 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 0
2 0
18 0
0 0
3 19 4
0 20 52 5
0 21 78 0
28 6
22 7
0 23 283 8
0 24 309 0
393 9
25 iO 0
26 508 11 0
27 622 12 0
28 665 -
13 0
29 662 14 0
30 644 0
15 31 16 0
INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting mllnth. Compute to the nearest whole megawatt.
(9/77)
Nu.
Datc I
1 78-01-06 2
78-04-21 F: Forced S: Scheduled (9/77)
UNIT SHUTDOWNS ANO POWER REDUCTIONS REPORT MONTH __ April 1978 r.r-L.
r1
!:.I).;:;
'J
- ~
~ *=
~
D.
=-j
~;~
f-
~T er:
~~ -
o:::.
- f VJ ~
0 s
2498.6 c
1 F
32.4 A
3 Reason:
A-Equipment Failure (Expl:Jin)
B-iv1aintenancc or Test C-Refucling D-Rcgulatory Restriction Licensee Event Report :tt None None E-Opcrntor Training & License Examinatiun F-Ac.l mi nist rat ivc G-Opcrational Error (Explain)
I !-Other (Explain)
~
(\\)V)
I::
(\\)
O.>
(\\)
0 -0
-0
- 0:- 0 V>
~
J;*()
i::c_.,
0 u 3
Method:
!-Manual 2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
- 2.
DOCKET NO.
50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 5-2-78 DIBollnow 616-764=8913-Cause & Corrective Action to Prevent Recurrence Feedwater Pump Trip 4
5 Exhibit G - Instructions for Preparation of Data Entrv Sheets for Licensee Eve1{t Report (LERl File (NUREG-0161)
Exhibit l - Sami: Soun:~
Consumers Power Co.
Palisades Nuclear Plant Docket 50-255
SUMMARY
OF OPERATING EXPERIENCE FOR PERIOD APRIL 1 THROUGH APRIL 30, 1978 4-1-78 4-5-78 4-7-78 4-8-78 4-12-78 0
The plant was in the refueling shutdown condition, with the 1978 outage in progress.
Completed filling and venting the Primary Coolant System.
The NRC issued Amendments 38 and 39 to the Palisades Provisional Operating License.
Amendment 38 modified Technical Specification testing requirements relating to the control rod drive position indication system, and Amendment 39 established a new operating allowance for steam generator tube degradation.
The Primary Coolant System was brought to operating temperature and pressure.
The NRC issued Amendment 40 to the Palisades Provisional Operating License.
This amendment modified the Limiting Conditions of Operation for the Iodine removal system.
o The reactor was brought to criticality.
(Initial criticality for Core III.)
Low power physics testing was commenced.
4-16-78 Low power physics testing was completed.
4-19-78 A reactor trip occurred.
The trip resulted from low steam generator water level.
The reactor was brought to criticality within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4-20-78 The generator was put on line, ending the outage which commenced on January 6, 1978.
The outage lasted 2,498.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
4-21-78 A reactor trip occurred because of a low steam generator water level.
The low level resulted from feedwater pump trip which was caused by a faulty vibration trip device.
During this outage, repairs were made to two CRDM's to resolve a position indication problem (reference LER 78-009), and to replace a faulty motor-gearbox-brake assembly (reference LER 78-010).
The reactor was made critical on the same day.
4-22-78 o
The generator was placed on line, ending an outage of 32.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> duration.
o After power was raised to 50%, power was held in order to perform equilibrium Xenon physics testing.
4-27-78 Power escalation to 90% of full power was completed.
Reactor power was limited to 90% by axial power distribution limits.
During the escalation in power, operational testing of the full-flow condensate polishing system was in progress.