Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 February 2, 1978 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of January 1978.

William E. Adams, General Engineer cc:

JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.

AKozlowski, Mich. Dept. of Labor RCallen, Mich. Pub. Survice Comm., Lansing, Mich.

Document Control - 950-22.35.10 (2 copies)

OPERATING DATA REPORT OPERATING STATUS I. Unit Name:

Palisades

2. Reporting Period:

1-1-77 to 1-31-77

3. Licensed Th~nnal Power (MWt):
4. Namepla!.~_Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

2530 811. 7 805

  • 675
  • 635 Notes DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 2-1-78 DIBollnow, 616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated {MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)

This Month 744 124.9 124.8 270,336 81,640 76 464 16.8%

16.8%

16.2%

T1 Unit Capacity Factor (Using DER Net)

12. 8%

Unit Forced Outage Rate 0

Yr.-to-Date 744 124.9 124. 8, 270,336 81,640 76,464 16.8%

16.8%

16. 2%.

12.8%

0

23.
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units.In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION April 1978 Forecast

~:.

Cumulative S-3,655 29,524.3 27,957.0 50,292,000 15,668,250 14;689,831 52.1%

52.1%

43.1%

. 34;0%

40.4%

Achieved (9/77)

.. - ~.~

1 78-01-06 F: Forced S: Scheduled UNIT.SHUTDOWNS AND POWER REDUCTIONS.

REPORT MONTH. January 1978

.-QJ c: -

0.

I- "

i
"l 3
t o-s 691.2 Reason:

c 1

A-Eq uipmcnt Failure (Explain)

U1M11l11h111nt1Ci!P nf Tutti r-l~urucllng

  • D-Rcgulatliry Rcstrli.:tion Lkcnscc Event Report#

E-Operator Training & License Exa111inatl1i11 F-Administrativc G-Opcrational Error (Explain)*

  • H-Other (Explain)
  • 3 Method:

I-Manual

~

QJVl t:

QJ 0 "O

.0. 0 Eu 0 u f1 *M1111 u11l Sut11111, J-Aulomatk Scrum, 4-0lhcr (Explain)

- t
l.

DOCKET NO.

50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 2-1-78 I

DIBollnow 616-764-8913 4

  • cause & Currec.:iivc Action to Prevent Recurrence
  • r,.

Exhibit G *Instructions for Preparathm of Data l~nt1*y Shlluts l'ur Ll..:1111suu Event Report (LER) File (NU REG*

0161)

Exhibit I_* Same Source

  • e AVERAGE DAILY UNIT POWER LEVEL.

DOCKET NO.

50-255 UNIT Palisades DATE 2-1-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH January 1978 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 658 17 0

2 641 18 0

628 0

3 19 4

626 20 0

5 611 21 0

6 21 22 0

7 0

23 0

e 0

8 24 9

0 25 0

IO 0

26 0

0 l 1 27 12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSlRUCTIONS

..

  • On this format, list the average daily unit power level in MWe-Net for each day iQ the reporting month. Compute to

. the nearest whole megawatt.

~ '*.

(9/77) r*.

  • '.1*
    • ,*...