Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 February 2, 1978 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of January 1978.
William E. Adams, General Engineer cc:
JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
AKozlowski, Mich. Dept. of Labor RCallen, Mich. Pub. Survice Comm., Lansing, Mich.
Document Control - 950-22.35.10 (2 copies)
OPERATING DATA REPORT OPERATING STATUS I. Unit Name:
Palisades
- 2. Reporting Period:
1-1-77 to 1-31-77
- 3. Licensed Th~nnal Power (MWt):
- 4. Namepla!.~_Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
2530 811. 7 805
- 675
- 635 Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 2-1-78 DIBollnow, 616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated {MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
This Month 744 124.9 124.8 270,336 81,640 76 464 16.8%
16.8%
16.2%
T1 Unit Capacity Factor (Using DER Net)
- 12. 8%
Unit Forced Outage Rate 0
Yr.-to-Date 744 124.9 124. 8, 270,336 81,640 76,464 16.8%
16.8%
- 16. 2%.
12.8%
0
- 23.
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units.In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION April 1978 Forecast
~:.
Cumulative S-3,655 29,524.3 27,957.0 50,292,000 15,668,250 14;689,831 52.1%
52.1%
43.1%
. 34;0%
40.4%
Achieved (9/77)
.. - ~.~
1 78-01-06 F: Forced S: Scheduled UNIT.SHUTDOWNS AND POWER REDUCTIONS.
REPORT MONTH. January 1978
.-QJ c: -
- 0.
I- "
- i
- "l 3
- t o-s 691.2 Reason:
c 1
A-Eq uipmcnt Failure (Explain)
U1M11l11h111nt1Ci!P nf Tutti r-l~urucllng
- D-Rcgulatliry Rcstrli.:tion Lkcnscc Event Report#
E-Operator Training & License Exa111inatl1i11 F-Administrativc G-Opcrational Error (Explain)*
- H-Other (Explain)
- 3 Method:
I-Manual
~
QJVl t:
QJ 0 "O
.0. 0 Eu 0 u f1 *M1111 u11l Sut11111, J-Aulomatk Scrum, 4-0lhcr (Explain)
- - t
- l.
DOCKET NO.
50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 2-1-78 I
DIBollnow 616-764-8913 4
- cause & Currec.:iivc Action to Prevent Recurrence
- r,.
Exhibit G *Instructions for Preparathm of Data l~nt1*y Shlluts l'ur Ll..:1111suu Event Report (LER) File (NU REG*
0161)
Exhibit I_* Same Source
- e AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO.
50-255 UNIT Palisades DATE 2-1-78 COMPLETED BY DIBollnow TELEPHONE 616-764-8913 MONTH January 1978 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 658 17 0
2 641 18 0
628 0
3 19 4
626 20 0
5 611 21 0
6 21 22 0
7 0
23 0
e 0
8 24 9
0 25 0
IO 0
26 0
0 l 1 27 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSlRUCTIONS
..
- On this format, list the average daily unit power level in MWe-Net for each day iQ the reporting month. Compute to
. the nearest whole megawatt.
~ '*.
(9/77) r*.