MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Operating Report
MONTHYEARPNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-035, Report of Changes, Tests and Experiments and Summary of Commitment Changes2019-10-0909 October 2019 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML0710902472007-04-11011 April 2007 Generator Tube Integrity Assessment from the 2006 Refueling Outage ML0428804722004-10-0707 October 2004 Core Operating Limits Report- Revision 13 ML0424001062004-08-24024 August 2004 Core Operating Limits Report - Revision 12 ML0411904322004-04-21021 April 2004 2003 Non-Radiological Environmental Operating Report ML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18353B4751975-08-29029 August 1975 Semiannual Report of Operations, Number 9, for Period of January 1 Through June 30, 1975 2022-03-24
[Table view] Category:Monthly
MONTHYEARML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18347A8351975-08-0707 August 1975 Monthly Operating Data for July 1975 ML18346A2041975-07-24024 July 1975 April & May 1975 Effluent Reports, Required by Interim Special Tech Spec of Provisional Operating License ML18347A8361975-07-0202 July 1975 Monthly Operating Data for June 1975 ML18347A8371975-06-0303 June 1975 Monthly Operating Data for May 1975 ML18347A8391975-05-0202 May 1975 Monthly Operating Data for April 1975 ML18347A7781975-04-24024 April 1975 Steam Generator Flushing Report No. 4, Covering Period March 6, 1975 Through March 27, 1975 ML18347A8401975-04-0101 April 1975 Monthly Operating Data for March 1975 ML18347A7791975-03-26026 March 1975 Corrected Steam Generator Flushing Report No 3. Typographical Error in Total Pounds of Phosphate for B Sg. It Should Have Been 299 Not 229 1978-09-01
[Table view] |
Text
consumers
~egulatory Docket Ale. Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 3, 1971 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of December 1976.
William E. Adams, General Engineer cc: JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich.
Document Control 195
. -- -~-----*-*.;,.-.-~-------~ ,
APPENDIX D Palisades UNIT---------
DATE
- January 3, 197i7 616 z,54 891:3
- CO~IPLETEE> By _D_I_B_o_l_l_n_o_w_ _ __
DOCKET No._5_0_-_2..5:. _5_____
OPERATING STATCS
- 1. REPORTING PERIOD: _ _7_6_1_2_0_1_ _ _ _ _ _ _ _ _ THROUGH 761231 HOt:RS IN REPORTl'.'\G PERIOD: 744
~
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (i\IWe*NET)-6..8..4..._
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET): _ _ _ _ _ _ _~---
- 4. REASONS FOR RESTRICTION (If ANY):
THIS CU~tUL\ TIVE REPORTING PERIOD YR TO DATE TO DATE 5 *. HOURS REACTOR WAS CRITICAL. . * * . . * . . * * *
' HOURS . . . * * * .
- 6. REACTOR RESERVE SHUTDOWN
- 7. . HOURS GENERA TOR ON Lll';E * . . . . * . . * * . . * *
- 8. l.rNJT RESERVE SHUTDOWN HOURS . . . . . * . * * * *
- 9. GROSS THER~IAL ENERGY :
GENERATED (~IWH) .*****.*.**.**.*.**** 1,531,608 9,663,024 32,682,984
- 10. GROSS ELECTRIC AL ENERGY.
-GENERATED (:.IWH) *** : * * * . * * . . * * * * * * * *
- 491,480 3,038,550 10,185,200
- 11. NET ELECTRICAL ENERGY GENERATED 464,343 2,847,033 9,528,679
{~!WH)
- 12. RE.-\CTOR AVAILABILITY FACTOR (l) . . . . . . . . .
98.0% 59 .. 0% 48.5%'
- 13. UNIT AVAILABILITY FACTOR(:!) * . * . . . . . * * * . 95.7% 55*.2% 45.2%
- 14. l'NIT C"..\P ..\CITY FACTOR (3) ..*....*....*.*
91.2% 47.4% 34 .. 9%
- 15. UNIT FORCED Ol'TAGE RATE (4) . . . . . . . . * . .
- 16. SHL;TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17. IF SlWT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-----------~~
- 18. UNITS IN TEST STATUS (PRIOR TO Cm.l~!ERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0;\1MERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR A\'AILABILlTY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE t=:'~IT AVAILABILITY FACTOR -~-~-~--~~~-~x100 HOURS IN REPORTl:-;G PERIOD NET ELECTRICAL POWFR GF'.'IERATED (3) lfNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY lMWc-NET) X HOURS IN REPORTING l'EKIOLJ FORCED OUTAGE !!OURS t:="IT FORCED Ol'TAGE RATE -~-~~~~-~~~-~~-~---~~x100 HOURS GENERATOR ON Llt\E +FORCED OUTAGE HOURS l.l 6*D-1
- -- AJ>PENDIX C 0- 255 DOCKET No? ------
.UNIT Palisades DATE Jan. 3, 1977 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH December 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (1\lWe-net) 1 326 17* 666 2 0 18 673 399 670 3 19 686
.4 20. 663 5 654 21 661 667 664 6 22
'~ 655
~- 7 23 661 8
663 24 656 i:*
9 652 25 672 672 666 10 26 11 652 27. 667 12 662 28 669 663 13 29 663 14 669 30 666 1"5 676 31 662 673 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the avaage daily unit power level in l\1\Vc-net for each day in the reporting month.
Compute to tht! ncan.:st whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum.
dcpcnclablc capacity for the net dcctrical rating of the unit. there may be occasions when the daily
_. average power level exceeds the I 00% line (or the rcstrkted power level* line). In such cases, the
) average daily unit power output shed should be footnoted to explain tile apparent anomaly. . .
1.16-C- I
ff~:~\
.*(~~.....:~.' ** 1 ,:.i.l"1:££i/6'"4¥\~~-
... '41'""*~-*........,,......
, ..... ) '"'"'.'""t~"",."'*......; ..................Jio'i'""'......*;.;..'a_
..* I 5
I f .*: . j
APPENDIX E 50-255 '\
DOCKET NO.
., \.
UNIT SHUTDOWNS UNIT NAME Palis.ades \
COMPLETED BY DIBollnow r t
- t REPORT MONTH __D_e_c_e_m_b_er_l_9_7_6_ f I
TYPE METHOD OF F*FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2). CORRECTIVE ACTIONS/COMMENTS 18 761201 F 32.2 A 3 Unit tripped due to loss of load caused by a malfunction of the generator voltage regulator.
I
, I (1) REASON (2) METHOD A- -EQUIPMENT FAILURE' (EXPLAIN) I-MANUAL B- MAINT. OR TEST 2-MANUAL C-*REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E--OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*Ol'ERATIONAL ERROR (EXPLAIN)
H-OTJ-!ER (EXPLAIN)
SUMMARY
Plant operat~d at a nominal 100% power _-throughout th!:! month.
t' L_ _ _
.-1