consumers

~egulatory Docket Ale. Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 3, 1971 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of December 1976.

William E. Adams, General Engineer cc: JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich.

Document Control 195

. -- -~-----*-*.;,.-.-~-------~ ,

APPENDIX D Palisades UNIT---------

DATE

January 3, 197i7 616 z,54 891:3
  • CO~IPLETEE> By _D_I_B_o_l_l_n_o_w_ _ __

DOCKET No._5_0_-_2..5:. _5_____

OPERATING STATCS

1. REPORTING PERIOD: _ _7_6_1_2_0_1_ _ _ _ _ _ _ _ _ THROUGH 761231 HOt:RS IN REPORTl'.'\G PERIOD: 744

~

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (i\IWe*NET)-6..8..4..._
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET): _ _ _ _ _ _ _~---
4. REASONS FOR RESTRICTION (If ANY):

THIS CU~tUL\ TIVE REPORTING PERIOD YR TO DATE TO DATE 5 *. HOURS REACTOR WAS CRITICAL. . * * . . * . . * * *

  • 729.4 5,183.9 21,270.9

' HOURS . . . * * * .

6. REACTOR RESERVE SHUTDOWN
7. . HOURS GENERA TOR ON Lll';E * . . . . * . . * * . . * *
  • 711.8. 4,850.4 192824.2
8. l.rNJT RESERVE SHUTDOWN HOURS . . . . . * . * * * *
9. GROSS THER~IAL ENERGY :

GENERATED (~IWH) .*****.*.**.**.*.**** 1,531,608 9,663,024 32,682,984

10. GROSS ELECTRIC AL ENERGY.

-GENERATED (:.IWH) *** : * * * . * * . . * * * * * * * *

  • 491,480 3,038,550 10,185,200
11. NET ELECTRICAL ENERGY GENERATED 464,343 2,847,033 9,528,679

{~!WH)

12. RE.-\CTOR AVAILABILITY FACTOR (l) . . . . . . . . .

98.0% 59 .. 0% 48.5%'

13. UNIT AVAILABILITY FACTOR(:!) * . * . . . . . * * * . 95.7% 55*.2% 45.2%
14. l'NIT C"..\P ..\CITY FACTOR (3) ..*....*....*.*

91.2% 47.4% 34 .. 9%

15. UNIT FORCED Ol'TAGE RATE (4) . . . . . . . . * . .
  • 4.3% 14.2% 48.2%
16. SHL;TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SlWT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-----------~~
18. UNITS IN TEST STATUS (PRIOR TO Cm.l~!ERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0;\1MERCIAL OPERATION HOURS REACTOR WAS CRITICAL (l) REACTOR A\'AILABILlTY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE t=:'~IT AVAILABILITY FACTOR -~-~-~--~~~-~x100 HOURS IN REPORTl:-;G PERIOD NET ELECTRICAL POWFR GF'.'IERATED (3) lfNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY lMWc-NET) X HOURS IN REPORTING l'EKIOLJ FORCED OUTAGE !!OURS t:="IT FORCED Ol'TAGE RATE -~-~~~~-~~~-~~-~---~~x100 HOURS GENERATOR ON Llt\E +FORCED OUTAGE HOURS l.l 6*D-1

    • -- AJ>PENDIX C 0- 255 DOCKET No? ------

.UNIT Palisades DATE Jan. 3, 1977 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH December 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (1\lWe-net) 1 326 17* 666 2 0 18 673 399 670 3 19 686

.4 20. 663 5 654 21 661 667 664 6 22

'~ 655

~- 7 23 661 8

663 24 656 i:*

9 652 25 672 672 666 10 26 11 652 27. 667 12 662 28 669 663 13 29 663 14 669 30 666 1"5 676 31 662 673 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the avaage daily unit power level in l\1\Vc-net for each day in the reporting month.

Compute to tht! ncan.:st whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum.

dcpcnclablc capacity for the net dcctrical rating of the unit. there may be occasions when the daily

_. average power level exceeds the I 00% line (or the rcstrkted power level* line). In such cases, the

) average daily unit power output shed should be footnoted to explain tile apparent anomaly. . .

1.16-C- I

ff~:~\

.*(~~.....:~.' ** 1 ,:.i.l"1:££i/6'"4¥\~~-

... '41'""*~-*........,,......

, ..... ) '"'"'.'""t~"",."'*......; ..................Jio'i'""'......*;.;..'a_

..* I 5

  • (~~.

I f .*: . j

  • ~ ..

APPENDIX E 50-255 '\

DOCKET NO.

., \.

UNIT SHUTDOWNS UNIT NAME Palis.ades \

  • uamuary 3, 1977 l DATE i

COMPLETED BY DIBollnow r t

  • t REPORT MONTH __D_e_c_e_m_b_er_l_9_7_6_ f I

TYPE METHOD OF F*FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2). CORRECTIVE ACTIONS/COMMENTS 18 761201 F 32.2 A 3 Unit tripped due to loss of load caused by a malfunction of the generator voltage regulator.

I

, I (1) REASON (2) METHOD A- -EQUIPMENT FAILURE' (EXPLAIN) I-MANUAL B- MAINT. OR TEST 2-MANUAL C-*REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E--OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*Ol'ERATIONAL ERROR (EXPLAIN)

H-OTJ-!ER (EXPLAIN)

SUMMARY

Plant operat~d at a nominal 100% power _-throughout th!:! month.

t' L_ _ _

.-1