consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 September 7, 1977 U.S.Nuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of August 1977.
William E. Adams, General Engineer cc:
JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
A.Kozlowski, Mich. Dept. of Labor Document Control 950-22.35.10
RECi::i'/f.n fJOCUi'Ffff Fi~CC~.-::~*,s1jt.!:~ Uri~: i.
19Ti SEP 12 A~1 10 42
.*APPENDIX C DOCKET NO. _5...,...0_--"25.._5~--
UNIT _P_a_l_i_* s_a_d.... e_s__...._
se_p_t_._. _7_,~1,..,..9_77 COMPLETED BY _D_I_B_o_l_l_n~o_w __
616-764..:.8913 AVERAGE DAILY UNlT POWER LEVEL MONTH __
A_u_g_u_s_t~1_9_7_7_~--
AVERAGE DAILY POWER LEVEL AVERAGE DAILY PQ'WER LEVEL.
DAY (l\\1We-net)
DAY (l\\lWe-net) 1 642 17*
.....,. y 2
647 18 3
646 19
.4 639 20 5
637 21 639 6
22 7
634 23 8
638 24 9
635 25 70 10 641 26 504 11 644
- 27.
.618 12 641 28 625 13 641 29 642 14 647 30 646 1"5 635 31 16 13 DAILY UNIT POWER LEVEL FORi\\1 INSTRUCTIONS On this form, list the *werage daily unit power level in ~1We-net for each day in the reporting month.
Compute to the nt:arest whole meg:.iwatt.
These figures will be used to plot a graph for each reporting nionth. Note that by using maximum.
depcnd:.ibk capa-:ity for the nd electrical rating of th:: unit. there m::i.y bl! occasions when the daily average power lcvd exceeds the I oo*:;. line (or the rcstri<.:tcd power level-line). In such cases. the
- av~rage daily unit power output sh~~t should b~ footiwtl:d w cxpl:.iin the ~pp.:!rent anom:?ly.
J.16-C-l.
I l '
I I
I I '
\\,_.
n v_.
I
- ~inti*
I !
APPENDIX C OPERATING DATA REPORT DOCKET NO. _ 5_o_-_25_5_-___ _
UN IT _P_a_l_i_s_a_d_e_s __.,:._ __
DATE _s_e_p_t_. _7_, _1_9_7_7_...:-,-_
COMPLETED BY _D_I_B_o_l_l_n_ow __
~,__-
TELEPHONE _6_1_6-_7_6_4_-_8_91~3-_;,__ 1-OPERATING STATUS
- 1. REPORTING PERIOD: 770801 to 770831 GROSS HOURS IN REPORTING PERIOD: ____
7_4_4 ___ _
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWtl: __
2_2_0_0_
DESIGN ELECTRICAL RATING (MWe-Net):
805 MAX. DEPEND. CAPACITY {M\\.Ve-Netl: __
6_3_5 __ _
- 3. POWER LEVEL TO WHICH RESTRICTED (iF ANY) (MWe-Net): -------------
- 4. REASONS FOR.RESTRICTION (IF ANY):
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL.***..**......*
THIS MONTH 541.4 6'. REACTORRESERVESHUTDOWNHOURS.*****.....**.... ____ O __ _
519.7 1: HOURS GENERATOR ON LINE.**.*.*****..*********...* ----
0
- 8. UNIT RESERVE SHUTDOWN HOURS *.*..,, **............. ----
a GROSSTHERMALENERGYGENERATED(MWH)..**....**... _1,122,840
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).............
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).*..****....*.
- 12. REACTOR SERVICE FACTOR.....*.*.....*....**........
- 13. REACTOR AVAILABILITY FACTOR..***.*..*.**.***....*.
- 14. UNIT SERVICE FACTOR...*.*......**.. * *.****.*...***
- 15. UNIT AVAILABILITY FACTOR..*...*...*********.**..*.
341,730 320,543 72.8%
72.8%
69.9%
69.9%
6 UN Y
(
- 67. 8%
1
53.5%
- 17. UNIT CAPACITY FACTOR (Using Design MWel **.**..***...*.**
30.1%
- 18. UNll FORCED OUTAGE RATE *.**..***********.****.*.* ----
YR TO DATE 5., 335. 2 0
5,247.3 0
11,115,528 3,476,580 3,269,710 91.5%
91.5%
90.0%
90.0%
87.9%
69.4%
- 5. 7~
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
Refueling/Steam Generator Surveillance:
January 1978:
- 20. IF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP: ______
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 FORECAST ACHIEVED
- /
CUMULATIVE
. 26 '606.1 0
25,071.5.
0 43,798,512 13,661,780 12,798,389 53.6%
53.6%
50.5%
50.5%
41.3%
32.0%
42.8%
12 Weeks
*M""*
. J. ' *<.
- '.~;Le<.
- I r **;:**,
t t l' * ~c0**'
/,ffeji/~>
- i<>*
- a
- .C)
! \\
NO.
DATE
.10 770816 i
- 'I i
'I
.,1* ;.:r i','
'j..,.
- ', 1
/... * *:.-
- _'~ _.*,.. *
... TYPE*
F: FORCED S: SCHEDULED
\\!{
-~
- r* {*'
,~*. -~~ ;F ::.
, *I
~
I j.
- .,... -. "*"* l
~ ',
c:*)
].
, I i'.
- APPENDIX D ; l *.
j '..
- 1
- I
- J -~~.*
- ** -.
-~~
- ~* *.
1\\* *-.:
UNIT* SHUTDOWNS AND POWER' REDUCTIONS
- L.*
\\*.
DURATION (HOURS) 224.3 REPORT MONTH
- August 1977 REASON (1)
A METHOD Of**.:
- SHUTTING DOWN /:
THE REACTOR OR * '*
I REDUCING POWER (2)
- .
- ~
. f ::r
. *.~*
- {*
\\**-
... l
- 1
- I (1)
. REASON :
- ... ii.
. A: EQUIPMENT FAILURE (E{(PLAIN)
B: MAINT. OR TEST C: REFUELING..
D: REGULATORY RESTRICTION E: OPERATOR:TRAINING AND
- .. ll.!CENSE EXAMINATION F: ADMlNISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (l~Xi>LA.IN).
i
'Repair *a.Containment purge exhaust isola,tion valve.
(2)
METHOD.
I':
1: MANUAL 2: MANUAL SCRAM.
3: AUTOMATIC SCRAM
. 4: OTHER (EXl'LAIN)
- *. i
SUMMARY
- :The Plan*t *.~p.~rated. at a nominal 100% power with the e~ception of the abo~e mentioned outage *
~:*. :