Monthly Operating Data for August 1977
ML18347A804
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 09/07/1977
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A804 (5)


Text

..

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 September 7, 1977 U.S.Nuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of August 1977.

William E. Adams, General Engineer cc:

JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.

A.Kozlowski, Mich. Dept. of Labor Document Control 950-22.35.10

RECi::i'/f.n fJOCUi'Ffff Fi~CC~.-::~*,s1jt.!:~ Uri~: i.

19Ti SEP 12 A~1 10 42

.*APPENDIX C DOCKET NO. _5...,...0_--"25.._5~--

UNIT _P_a_l_i_* s_a_d.... e_s__...._

DA TE __

se_p_t_._. _7_,~1,..,..9_77 COMPLETED BY _D_I_B_o_l_l_n~o_w __

616-764..:.8913 AVERAGE DAILY UNlT POWER LEVEL MONTH __

A_u_g_u_s_t~1_9_7_7_~--

AVERAGE DAILY POWER LEVEL AVERAGE DAILY PQ'WER LEVEL.

DAY (l\\1We-net)

DAY (l\\lWe-net) 1 642 17*

.....,. y 2

647 18 3

646 19

.4 639 20 5

637 21 639 6

22 7

634 23 8

638 24 9

635 25 70 10 641 26 504 11 644

27.

.618 12 641 28 625 13 641 29 642 14 647 30 646 1"5 635 31 16 13 DAILY UNIT POWER LEVEL FORi\\1 INSTRUCTIONS On this form, list the *werage daily unit power level in ~1We-net for each day in the reporting month.

Compute to the nt:arest whole meg:.iwatt.

These figures will be used to plot a graph for each reporting nionth. Note that by using maximum.

depcnd:.ibk capa-:ity for the nd electrical rating of th:: unit. there m::i.y bl! occasions when the daily average power lcvd exceeds the I oo*:;. line (or the rcstri<.:tcd power level-line). In such cases. the

  • av~rage daily unit power output sh~~t should b~ footiwtl:d w cxpl:.iin the ~pp.:!rent anom:?ly.

J.16-C-l.

I l '

I I

I I '

\\,_.

n v_.

I

    • ~inti*

I !

APPENDIX C OPERATING DATA REPORT DOCKET NO. _ 5_o_-_25_5_-___ _

UN IT _P_a_l_i_s_a_d_e_s __.,:._ __

DATE _s_e_p_t_. _7_, _1_9_7_7_...:-,-_

COMPLETED BY _D_I_B_o_l_l_n_ow __

~,__-

TELEPHONE _6_1_6-_7_6_4_-_8_91~3-_;,__ 1-OPERATING STATUS

1. REPORTING PERIOD: 770801 to 770831 GROSS HOURS IN REPORTING PERIOD: ____

7_4_4 ___ _

2. CURRENTLY AUTHORIZED POWER LEVEL (MWtl: __

2_2_0_0_

DESIGN ELECTRICAL RATING (MWe-Net):

805 MAX. DEPEND. CAPACITY {M\\.Ve-Netl: __

6_3_5 __ _

3. POWER LEVEL TO WHICH RESTRICTED (iF ANY) (MWe-Net): -------------
4. REASONS FOR.RESTRICTION (IF ANY):
5. NUMBER OF HOURS REACTOR WAS CRITICAL.***..**......*

THIS MONTH 541.4 6'. REACTORRESERVESHUTDOWNHOURS.*****.....**.... ____ O __ _

519.7 1: HOURS GENERATOR ON LINE.**.*.*****..*********...* ----

0

8. UNIT RESERVE SHUTDOWN HOURS *.*..,, **............. ----

a GROSSTHERMALENERGYGENERATED(MWH)..**....**... _1,122,840

10. GROSS ELECTRICAL ENERGY GENERATED (MWH).............
11. NET ELECTRICAL ENERGY GENERATED (MWH).*..****....*.
12. REACTOR SERVICE FACTOR.....*.*.....*....**........
13. REACTOR AVAILABILITY FACTOR..***.*..*.**.***....*.
14. UNIT SERVICE FACTOR...*.*......**.. * *.****.*...***
15. UNIT AVAILABILITY FACTOR..*...*...*********.**..*.

341,730 320,543 72.8%

72.8%

69.9%

69.9%

6 UN Y

(

67. 8%

1

  • IT CAPACIT FACTOR Using MDC).*...*.*.**..*****...

53.5%

17. UNIT CAPACITY FACTOR (Using Design MWel **.**..***...*.**

30.1%

18. UNll FORCED OUTAGE RATE *.**..***********.****.*.* ----

YR TO DATE 5., 335. 2 0

5,247.3 0

11,115,528 3,476,580 3,269,710 91.5%

91.5%

90.0%

90.0%

87.9%

69.4%

5. 7~
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

Refueling/Steam Generator Surveillance:

January 1978:

20. IF SHUT DOWN AT END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP: ______
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 FORECAST ACHIEVED

  • /

CUMULATIVE

. 26 '606.1 0

25,071.5.

0 43,798,512 13,661,780 12,798,389 53.6%

53.6%

50.5%

50.5%

41.3%

32.0%

42.8%

12 Weeks


*M""*

. J. ' *<.

'.~;Le<.
  • I r **;:**,

t t l' * ~c0**'

/,ffeji/~>

  • i<>*
    • a
.C)

! \\

NO.

DATE

.10 770816 i

  • 'I i

'I

.,1* ;.:r i','

'j..,.

', 1

/... * *:.-

_'~ _.*,.. *

... TYPE*

F: FORCED S: SCHEDULED

\\!{

-~

r* {*'

,~*. -~~ ;F ::.

, *I

~

I j.

  • .,... -. "*"* l

~ ',

c:*)

].

, I i'.

  • APPENDIX D ; l *.

j '..

  • 1
I
J -~~.*
** -.

-~~

~* *.

1\\* *-.:

UNIT* SHUTDOWNS AND POWER' REDUCTIONS

  • L.*

\\*.

DURATION (HOURS) 224.3 REPORT MONTH

  • August 1977 REASON (1)

A METHOD Of**.:

  • SHUTTING DOWN /:

THE REACTOR OR * '*

I REDUCING POWER (2)

.
~

. f ::r

. *.~*

  • {*

\\**-

... l

  • 1
  • I (1)

. REASON :

  • ... ii.

. A: EQUIPMENT FAILURE (E{(PLAIN)

B: MAINT. OR TEST C: REFUELING..

D: REGULATORY RESTRICTION E: OPERATOR:TRAINING AND

.. ll.!CENSE EXAMINATION F: ADMlNISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (l~Xi>LA.IN).

i

'Repair *a.Containment purge exhaust isola,tion valve.

(2)

METHOD.

I':

1: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM

. 4: OTHER (EXl'LAIN)

    • *. i

SUMMARY

:The Plan*t *.~p.~rated. at a nominal 100% power with the e~ception of the abo~e mentioned outage *

~:*. :

\\J I

..,,