consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 June 1, 1976 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of May, 1976.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt RB Sewell DEVa.ilFarowe, Div. of Radiological Health Lansing Mich.
~~~~~)
- 1.
J J '*. '
APPENDIX C DOCKET NO.
50-255.
UNIT Palisades DA TE June *1, 1976 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH May 1976 AVERAGE DAILY POWER LEVEL DAY fMWe-net) 1 2
3 4
5 6
7 8
9 10 11 12 13 14 l5 16 0
0 0
0 0
0 0
0 61 101 0
0 0
0 AVERAGE DAILY POWER LEVEL DAY (MWe-net) 17*
0 18 57 19 114 20 104 21 272 22 381 23 489 24
. ?19 25 523 26 559
- 27.
591 28 917
- 29 633 30 648 31 6)3 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-n(:!t for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be 1.1scd to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level-line). In such cases, the
. aver:ige daily unit power output sheet should be footnoted to explain the ap.parent anomaly.
I '
LIKI
""'~~~~~?."~~~-*"t""l'~kµ,qc,
,.,1"4:,'* *....,.,.
, '?>*...,_~~~*~~-"'!':,..f5'5,.';..'~-*:,P'\\_..;;":"*:'°:"~~--;.-:;~*~~..,~~~~>::::;tP-r.'~"":,.'".;yr1 -~
~
~
.--*-"***-.. ~-... *-*~-------------*-*--~-~~~-
.--------==...._:.__...__~-===::::.,,. *~~
...,,,.,-~*-*
-o ck~.... ~**
- ,;! J1 APPENDIX D UNIT _P_a_l_i_s_a_d_e_s __
DATE_J_u_n_~_l~'-1~9~7_6 __
COMPLETED BY DIBollnow/916-164-8913 DOCKET No._5_0_-_2.._55 ____
OPERA TING ST A TUS
- 1.
REPORTING PERIOD:
760501 THROUGH 760531
:-:------~
HOURS IN REPORTl.'.'\\G PER!OD: __
__,'-4"-4.;.._ _______________________ _
- 2.
CURRENTLY AlTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 720
- 3.
LOWEST POWER LEVEL TO WHICH SPEC!FICALL Y RESTRICTED (IF ANY) (MWe-NET): __________ _
- 4.
REASONS FOR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
~68.6 6,
REACTOR RESERVE SHUTDOWN HOURS.......
0
- 7.
HOURS GENERA TOR ON LINE.........*.....
392.2
- 8.
UNJT RESER VE SHUTDOWN HOURS...........
- 9.
GROSS THER\\1AL ENERGY GENERATED (~IWH).....................
569, 280
- 10.
GROSS ELECTRICAL ENERGY
-GENERATED (~IWH).....................
168,290 NET ELECTRICAL ENERGY GENERATED 152,949
- 11.
(MWll) 24.0%
REACTOR AVAILABILITY FACTOR (1).........
UNIT AVAILABILITY FACTOR (2).........*..
l 1NITCAPACITY FACTOR (3)...............
UNIT FORCED OUTAGE RATE (4)............
52.7%
28.6%
YR TO DATE 568.6 0
392.2 0
569,280 168,290 152,949
.12.* 8%
10.8%'
--~5.8%
24.0%
CUMULATIVE TO DATE
.16, 555.6 0
15.367 0
23,589,240 "7,314,940 6,834.587 42'.8%
"39.7°/o:
" 28.7%"
53.6%
- 12.
- 13.
- 14.
- 15.
I6.
SIWTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
None
- 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________ _
- 18.
UNITS IN TEST STATUS (PRIOR TO COM:.!ERCIAL OPERATION) REPORT THE FOLLOWING:
(l)
REACTOR AVAILABILITY FACTOR L:NIT A VAILAB!LITY FACTOR (3)
UNIT C'APACITY FACTOR
(-!)
CSIT FORCED Ol'TAGE RATE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERA T!ON HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
XIOO HOURS IN REPORTING PERIOD NF.T ELECTRICAL POWFR GFNERATED DA TE LAST DA TE FORECAST ACHIEVED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l'E!UOL) fORCED OUTAGE HOURS
-~-~-~-~-------~~-~~~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS l.16-D-J
I ~ I l l
~1 NO.
DATE 10 751220 l
2 750512
SUMMARY
I rvt t 1
a
\\
TYPE F*FORCED DURATIPN S*SCHEDULED * (HOURS) s 280.4 18 2240.7 F
124.1 e>t'brftt*;
-*-.. i "L.
APPENDIX E UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY
~
-~
50.-255 Palisades 6-1-76 DIBollnow
)o. *.
~-
- n.
c '
t i
"'. i
.. I l
\\
REPORT MONTH -------
- 1 I
REASON (1) c c
A METHOD OF
~HUTTING DOWN THE REACTOR (2) 3 3
.1 CORR.ECTIVE ACTIONS/COMMENTS Item #1 is a Continuing Refueling Outage as ltem #10 Repair CRDM Seal Leakag~
'\\
(1) REASON (2) METHOD.
A--EQUIPMENT FAILURE'(EXPLAIN)
I-MANUAL
.B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM
- D-REGULATORY RESTRICTION 3-AUTOMATIC E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION f-ADMINISTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
- H-OTHER (EXPLAIN)