MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Operating Report
MONTHYEARPNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-035, Report of Changes, Tests and Experiments and Summary of Commitment Changes2019-10-0909 October 2019 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML0710902472007-04-11011 April 2007 Generator Tube Integrity Assessment from the 2006 Refueling Outage ML0428804722004-10-0707 October 2004 Core Operating Limits Report- Revision 13 ML0424001062004-08-24024 August 2004 Core Operating Limits Report - Revision 12 ML0411904322004-04-21021 April 2004 2003 Non-Radiological Environmental Operating Report ML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18353B4751975-08-29029 August 1975 Semiannual Report of Operations, Number 9, for Period of January 1 Through June 30, 1975 2022-03-24
[Table view] Category:Monthly
MONTHYEARML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18347A8351975-08-0707 August 1975 Monthly Operating Data for July 1975 ML18346A2041975-07-24024 July 1975 April & May 1975 Effluent Reports, Required by Interim Special Tech Spec of Provisional Operating License ML18347A8361975-07-0202 July 1975 Monthly Operating Data for June 1975 ML18347A8371975-06-0303 June 1975 Monthly Operating Data for May 1975 ML18347A8391975-05-0202 May 1975 Monthly Operating Data for April 1975 ML18347A7781975-04-24024 April 1975 Steam Generator Flushing Report No. 4, Covering Period March 6, 1975 Through March 27, 1975 ML18347A8401975-04-0101 April 1975 Monthly Operating Data for March 1975 ML18347A7791975-03-26026 March 1975 Corrected Steam Generator Flushing Report No 3. Typographical Error in Total Pounds of Phosphate for B Sg. It Should Have Been 299 Not 229 1978-09-01
[Table view] |
Text
consumers flle C'/l'; Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear
- 71~mber l975.
Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1
~:_....,:- __ ...........__..,,,___~----............_.__
I APPENDIX 0-
- UNIT Palisades Plant DATE _ _ l_/7_/_7_5~-----
. CO'fPLETE DYB _H.__ R._Vernick
. " DOCKET N0. _ _5_0_/_2_5_5_ __ .*
OPERATIKG STATt:S
- 1. REPORTING PERIOD: _ _~7~5_1_2_0_i_.________ THROUGH _ __,_7""-5-=l-=2'-"'3'=1'----------
HOURS IN REPORTl:\G PERIOD: _ _ _~_4_4_..,.--------------------=..,..--
- 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
- 3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'): _ _6_3_0______-:--
.4. REASONS FOR ~ESTRICTION (IF AN.Y):
THIS. CUl\IULA TIVE REPORTING PERIOD YR TO DATE TO DATE S* . HOURS REACTOR WAS CRITICAL. .*.. .' ******. 463.6 5,850.1 16,087
- 6. REACTOR RESERVE SHUTDOWN HOURS *.***** ; 0 0 0
- 7. . HOURS GENERATOR ON LINE.*.. ~ .*...****** 463.6 . 5.652.7 14.973.8 8.. \JNJT RESERVE SHUTDOWN HOURS . *.* ~ ******* 0 0 0
- 9. GROSS THER'.\IAL ENERGY .
GENERATED ('.\tWH) **.*****.************ 537,672 8,906,400 23-,019~960 10; GROSS.ELEqRICAL ENERGY 154,850 2,642,400 1,146~650 11.
-GENERA TEDJ'.\IWII) . . . : . . . . . . . * . * . * * * * *
- NET ELECTRICAL ENERGY GENERATED
('.\!\\'II) 138,558. 2;427,933 6,681,638
- 12. REACTOR AVAILABILiTY fACTOR (1) . * * * * * * * * . 62. 3% 66.8% . --.,..-......,4~5: 9%
. 13. UNIT A \"AILABILITY FACTOR (2) ..*.********. 62.3%. . 64. 5%. ---~h..... 2:1%
- 14. l'NIT C AP.-\Cl1Y FACTOR (3) . . * . . * * * * * . * * *
- 21.2%* 40.5% _ _ __._2.7.. . 9%
15 . l 1NIT FORCED Ol!TAGE RATE (4) . . . . . . * * * * .
. 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Refueling, 12/20/75, 3 months . . . . *
- 17. IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*_/_7_6_*- - - - - - - -
- 18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE FORECAST ACHIEVED INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (I) ~EACTOR A \'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) l?NIT A\'AILABILITY FACTOR -~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR GF~F.RATED
- .MAX. Dl-.l'ENDABLE CAPACITY (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL>
FORCED oL:TA(;E llOL:Rs
-~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l
.e Plant Statistics for Month of: December* 1975 ....
- Month Year to Date Total to Date Net*Plant Output, Mwhe 138,558 :2,4~7,933 .6 ,881, _638_ ..
Gross Generation, Mwhe 154,850 2,6~2,4ob- . 7,146 ,650.
Station Power, Mwhe - i
- On Days Generating On Days Not. Generating 16,292 1,014 214,467
.20 ,492 .
- 465,012 113 ,-902 II Reactor Heat Produced, Mwht 537,672 *8;906,4Qo 23,019,960 iI t*
Hours Critical 463.6 5,850;1 16,087 Hours Generating .. 463.6 . . 5,65i:1 14,973.8 Capacity Factor 27.2% 40.5% 2.7.9%
/
Station Power, % of Gross 10.5% 8.1% 6.5%
(Days Generating)
CoJ!.e Ave. Burnup, Mwd/MTU ll,347.3*
Batch A Ave. Burnup, Mwd/}lmJ<~** 11,102.9 Batch A Lead Bundles, lV!i~/MTU 11,716.64 (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47)
Batch B_Ave. Burnup, Mwd/MTU .13,093-5
.Batch B L::!ad Bundles, Mwd/MTU 14,194.6 (B-20, B-17, B-49, B-52)
Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU 12,900.0
-. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12)
Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours0.00854 days <br />0.205 hours <br />0.00122 weeks <br />2.80809e-4 months <br /> on 12/20 for scheduled outage'. .
Availability (%) Month *_Year to Date Plant 62.3 64.5 Reactor 62.3 66.8.
- This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1.
APPENDIX C
.. * . ::j,,
DOCKET NO. 50- 255' *.
- UNIT Palisades Plant DATE l/y_/_76_ _
COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY {.M\Vc-net) .. DAY (MWe-net) 1 484 17*. . 480 2 268* 18 4 1
/
3 -24J: . .19' 4 4 241 20. 10 5 235 21 6* 237 *22 7 237 23 s 240 24 .. .... -:- . .
- ~:
9 237 25 10 235 . 26 11* 250 27.
12 *. 259 *28 13 ,- 261. 29.
14 266 30 1"5 264 31
~ .. .
16 421 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month.
Compute to the nearest whole megawatt.
- These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly.
I
- 1. J6-C* l
!~::'\
..=.:*-,,
.....,.2~*-***W~'r~txMilleilGrd~**~r2*rw1-..*******>n..-............_.,,__...,.,~m_..*-*~*u***1~::.....~**-.--.1,, ...-...-..... - - - - . . - - - - - - - - - - - - - - - - - - - - . . _ . . . . . ,____...._-..,._
.I
-~
\
.** \
. 't I
I APPENDIX E DOCKET NO. 50-255 ~ !
r.
UNIT SHUTDOWNS UNIT NAME Palisades- Plant 1/7176 DATE Vernick.
\
COMPLETED l3Y H. *R.
REPORT MONTH December 1975 TYPE METHOD OF F*FORCED DURATIPN SHUTTING DOWN NO. DATE S*SCHEDULED (HOU.RS) REASON (1) THE REACTOR (2) CORR.ECTIVE ACTIONS/COMMENTS 10 751220 s 280.4 c 3 While coming down 'in power for the
' sch~duled outage, there was a Reactor
.. Protective System flow trip.
. '\
\
(l) REASON (2) METHOD .
.. A**EQUIPMENT FAlLURE'(EXPLAlN) I-MANUAL B* MAINT. OR TEST 2-MANUAL
. C- REFUELING SCRAM
. \
D-REGULATORY RESTRICTION E-*OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATI VE 3-AUTOMATIC SCRAM e.
G-Ol'ERATIONAL ERROR
,. (EXPLAIN)
.. H-OTliER (EXPLAIN)
SUMMARY
- The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%.
Load :i;-emained at 80%.until the unit came- off the line.for a scheduled refueling on December 20, 1975-l j . ,.