flle C'/l';
consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C.
20555 RE:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear
- 71~mber l975.
Howard R. Vernick Associate Engineer CC:
JGKeppler, NRC RBDeWitt RBSewell 1.9:1
~:_....,:-__...........__..,,,___~----............_.__
I APPENDIX 0-UNIT Palisades Plant DATE __
l_/7_/_7_5~-----
. CO'fPLETE B
H. R. Vernick DY _______
DOCKET N0. __
5_0_/_2_5_5 __ _
OPERATIKG STATt:S
- 1.
REPORTING PERIOD: __
~7~5_1_2_0_i_. ________ THROUGH __ _,_7""-5-=l-=2'-"'3'=1'----------
HOURS IN REPORTl:\\G PERIOD: ___ ~_4_4_..,.--------------------=..,..--
- 2.
CURRENTLY ACTHORIZED POWER LEVEL ('.\\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
- 3.
LO\\\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\\!We-NE1'): __
6_3_0 ______ -:--
.4.
REASONS FOR ~ESTRICTION (IF AN.Y):
THIS.
REPORTING PERIOD S *
. HOURS REACTOR WAS CRITICAL..*...' ******.
- 6.
REACTOR RESERVE SHUTDOWN HOURS *.*****
7.. HOURS GENERATOR ON LINE.*.. ~.*...******
8.. \\JNJT RESERVE SHUTDOWN HOURS. *.* ~ *******
- 9.
GROSS THER'.\\IAL ENERGY.
GENERATED ('.\\tWH) **.*****.************
10; GROSS.ELEqRICAL ENERGY
- 11.
-GENERA TEDJ'.\\IWII)... :.......*.*.******
NET ELECTRICAL ENERGY GENERATED
('.\\!\\\\'II)
REACTOR AVAILABILiTY fACTOR (1).********
UNIT A \\"AILABILITY FACTOR (2)..*.********.
l'NIT C AP.-\\Cl1Y FACTOR (3)..*..*****.****
l 1NIT FORCED Ol!TAGE RATE (4)......****.*
463.6 0
463.6 0
537,672 154,850 138,558.
. 62. 3%
62.3%.
21.2%*
0%
YR TO DATE 5,850.1 0
. 5.652.7 0
8,906,400 2,642,400 2;427,933 66.8%.
. 64. 5%.
40.5%
32.6%
CUl\\IULA TIVE TO DATE 16,087 0
14.973.8 0
23-,019~960 1,146~650 6,681,638
--.,..-......,4~5: 9%
---~h
..... 2:1%
___ _._2...... 7. 9%
- -~5_4.1%
- 12.
. 13.
- 14.
15.
. 16.
smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Refueling, 12/20/75, 3 months
- 17.
IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\\IATED DATE or STARTUP: _3_/_2_9_* _/_7_6_* --------
- 18.
UNITS IN TEST STATCS C. RIOR TO CO'.\\l'.\\IERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
~EACTOR A \\'AILABILITY FACTOR (2) l?NIT A\\'AILABILITY FACTOR INITl!\\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
-~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\\\TR GF~F.RATED DATE LAST DATE FORECAST ACHIEVED
- .MAX. Dl-.l'ENDABLE CAPACITY (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL>
FORCED oL:TA(;E llOL:Rs
-~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\\E-+ FORCED OUTAGE HOURS I. I 6-D* l
. e Plant Statistics for Month of:
December* 1975....
Net*Plant Output, Mwhe Gross Generation, Mwhe Station Power, Mwhe -
- On Days Generating On Days Not. Generating Reactor Heat Produced, Mwht Hours Critical Hours Generating Capacity Factor Station Power, % of Gross (Days Generating)
CoJ!.e Ave. Burnup, Mwd/MTU Batch A Ave. Burnup, Mwd/}lmJ<~**
Batch A Lead Bundles, lV!i~/MTU (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47)
Batch B_Ave. Burnup, Mwd/MTU
.Batch B L::!ad Bundles, Mwd/MTU (B-20, B-17, B-49, B-52)
Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU
( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12)
- Month Year to Date Total to Date 138,558
- 2,4~7,933 154,850 2,6~2,4ob-16,292 1,014 214,467
.20,492.
537,672
- 8;906,4Qo 463.6 5,850;1
.. 463.6.
. 5,65i:1 27.2%
10.5%
40.5%
8.1%
. 6,881, _638_..
. 7,146,650.
- 465,012 113,-902 23,019,960 16,087 14,973.8 2.7.9%
6.5%
ll,347.3*
11,102.9 11,716.64
.13,093-5 14,194.6 12,900.0 Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours0.00854 days <br />0.205 hours <br />0.00122 weeks <br />2.80809e-4 months <br /> on 12/20 for scheduled outage'..
Availability (%)
Plant Reactor Month 62.3 62.3
- _Year to Date 64.5 66.8.
- This number represents the core average burnups calculated by INCA.
The corresponding core average burnup calculated from thermal considerations is 11,430.1.
/
i I I i I t*
APPENDIX C
- j,,
DOCKET NO.
50-255' *.
- UNIT Palisades Plant DATE l/y_/_76 __
COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
{.M\\Vc-net)
.. DAY (MWe-net) 1 484 17*.
. 480 2
268*
18 4 1
/
3
-24J:
.19' 4
4 241
- 20.
10 5
235 21 6*
237
- 22 7
237 23 s
240 24 9
237 25 10 235
. 26 11*
250
- 27.
12
- . 259
- 28 13 261.
- 29.
14 266 30 1"5 264 31 16 421
~...
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\\Vc-net for each day in the reporting month.
Compute to the nearest whole megawatt.
- These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly.
- 1. J 6-C* l
~:
I
- I
.I l
j NO.
10
..=.:*-,,
!~::'\\
.....,.2~*-***W~'r~txMilleilGrd~**~r2*rw 1-..*******>n..-............ _.,, __
...,.,~m_..*-*~*u***
1~::..... ~**-.--.1,,
\\
TYPE F*FORCED DURATIPN DATE S*SCHEDULED (HOU.RS) 751220 s
280.4 APPENDIX E UNIT SHUTDOWNS REPORT MONTH December 1975 METHOD OF SHUTTING DOWN REASON (1)
THE REACTOR (2) c 3
\\
-~
DOCKET NO. 50-255 UNIT NAME Palisades-Plant DATE 1/7176 COMPLETED l3Y H. *R. Vernick.
CORR.ECTIVE ACTIONS/COMMENTS While coming down 'in power for the sch~duled outage, there was a Reactor Protective System flow trip.
. '\\
\\
(l) REASON (2) METHOD.
A**EQUIPMENT FAlLURE'(EXPLAlN)
I-MANUAL B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-*OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATI VE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTliER (EXPLAIN)
SUMMARY
- The unit operated at. 45% tl;Lis month until. December 16,.:1975 when power was increased to 80%.
Load :i;-emained at 80%.until the unit came-off the line.for a scheduled refueling on December 20, 1975-t *
\\
t
. ' I I
~
- r.
\\
e.