ML18347A801
| ML18347A801 | |
| Person / Time | |
|---|---|
| Site: | Palisades (DPR-020) |
| Issue date: | 04/01/1977 |
| From: | Adams W Consumers Power Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A801 (5) | |
Text
- ..,
L consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 April 1, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
-..,-r.r,
~ M '-*'.~
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of March 1977.
William E. Adams General Engineer CC:
JGKeppler, NRC RBDeWitt RB Sewell CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
Document Control
_J
APPENDIX C DOCKET NO.
50-255 UNIT Palisades DATE April 1, 1977 COMPLETED BY DIBollnow AVERAGE.DAILY UNIT POWER LEVEL MONTH March 197Z AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1Wc-net)
DAY (MWe~net) 1 669 17*
673 2
676.
18 663 3
669
- 19 672
.4 666 20 671 5
673 21 674 6
674 22 669 7
679 23 671 8
663 24 "67Q 9
667 25 10 668 26 11 656
- 27.
90 12 663 28 286 13 665 29 628 14 667 30 677 l5 666 31 672.
16 672 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this fonn, list the average daily unit power level in M\\Ve-net for each day in the reporting month.
Compute to the nean:st whole mcg:iwatt.
These figures will. be used to plot a graph for each reporting month. Note that by using maximum.
dependable capacity for the nt:t clectrii:al rating of the unit. then~ may be occasions when the daily
- average power level excr:eds the I 00% line (or the rcstrii.:tcd power level-line). In such cases. the
. :) aver:ige daily unit power output sheet should be footnoted to explain the ap.parcnt anomaly.
1.16-C-I 1
I
-* -~----*~**-* --~ __.. ------~-----~
APPENDIX D OPERATING STATCS Palisades UNIT--..--------
DATE __
A~p~r~i~lri.~l~,~19~7~7:.,...,......,.
616-764-891_3 CO~IPLETED BY --'D=I~B~o.=1.::1'-".!n:!:o~w~--
DOCKET N0. __
5_0_-_2_5_5_* ---
- 1.
REPORTING PERIOD: ___
7_7_0_3_0_1_* ------- THROUGH __
7_7_0_3_3_1 __..;.__..;. _ __.~--
HOURS IN REPORTIXG PERIOD: ____
..J..7-"4~4,___,..,,..,-----------------~....... --
- 2.
CURRENTLY ALlTHORIZED POWER LEVEL (:\\1Wth) 2200 MAX. DEPEND..\\BLE CAPACITY (.MWe-NET}
635
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __________ _
- 4.
REASO~S FOR RESTRICTION (IF ANY):
TlHS REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL.......*.*.**
- 6.
REACTOR RESERVE SHUTDOWN HOURS ****.*.
- 7.. HOURS GENERA TOR ON LINE...*.*...******
- 8.
UNJT RESERVE SHUTDOWN HOURS....***.**,
- 9.
GROSS THER~fAL ENERGY 704.4 695.2 GENERATED (:\\!WH) *.**** * *.. ** * * *. * * *....
- 1, 507, 152.
- 10.
GROSS ELECTRIC' AL ENERGY
- 11.
-GENERATED (:\\IWH)... : **.*...*..*.*****
NEJ ELECTRICAL ENERGY GENERATED
(~iWH) **..**.**...***......***.*..*
472,280 443,633.
- 94. 7%
CUMULATlVE YR TO DATE TO DATE 22106.4 23,377.3
- 22087.8 21,912.0 4,362,528 37,045,512 1,376,780 11,561,980 l,225,213 1028242592 97.5%
50.8%
- 12.
- 13.
- 14.
- 15.
- 16.
RE.-\\CTOR AVAILABILITY FACTOR (I).*..*...*
UNIT AVAILABILITY FACTOR (2) **...**.***.
l'NITC.\\PACITY FACTOR (3)..*.**.*..., *..
UNIT FORCED OUTAGE RATE (4) *....*......
93.4%
26.Z%
47.6%.. -
93.2%
94.5%
37.8%
6.6%
3.3%
45.8%
SHVTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHt:T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ____________
- 18.
UNITS IN TEST STATUS (PRIOR TO co:-.nlERCIAL OPERATION) REPORT THE FOLLOWING:
{l)
REACTOR A \\'AILABILITY FACTOR l=:'-llT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON Ll~E
XlOO HOURS IN REPORTING PERIOD NFT ELFCTRICAL POWFR GF:-IERATEO DATE LAST FORECAST DATE ACHIEVED (3) llNIT CAPACITY FACTOR MAX. DEPEND.\\HLE CAPACITY (MWc-NET) X HOURS IN REPORTING l;E~lOU L':'>tlT FORCED Ol'TAGE RATE FORCED OUTAGE HOURS
~-------------------~x100 HOURS GENERATOR o:-; Ll~E +FORCED OUTAGE HOURS 1.16-D-l
. :.-:-w.
- . ; w
.r*.<- *."."7.t
- c. 'i'-=.C*.;
..~ r
~------------------ ------------------------- ---
~
~
I I_:.~--~-~--*""~~--~-_...__i ____ ~ -.""'**.... ------~-- _, ____ -
- =.
- . -~.
~
(.,.!
,~
r*
APP~-;;DIX E DOCKET NO. ---'"--""-"""""""-----
- i.
j_*
UNIT SHUTDOVVNS UNIT NAME Palisades I
DATE _April 1, lfil.'._
'coMPLETED IJY DIBollnow REPORT MONTH __
._Ma_rc_h ___ _
TYPE METHOD OF F*FORCED DURATIPN
~HUTTING DOWN NO.
DATE S*SCHEOULED (HOURS)
REASON (1)
THE REACTOR (2)
CORR.ECTIVE ACTIONS/COMMENTS 4
770325 F
35.6
.:.A 3
Feedwater Pump.Ti:ip 5
770327 F
13.2 lA 3
- F~edwater*Pu:mp Trip*
~
9' i;r:
. '\\
(1) REASON (2) METHOD.
,9 A* *EQUll'MENT FAILURE"(EXPLAIN)
I-MANUAL B* Mt\\!NT. OR TEST 2-MANUAL C-llEFUEL!NG SCRAM D-REGULATOit Y gESTJllCT!ON 3-1\\UTOMATIC E-Ol'EHATOlt TltA!NlNG /\\NU SCRl\\~I I
~
LICENSE EXAMINATION
~
F-ADMINISTllATlVE G-Ol'ER/\\TION/\\L ERRO.R (EXl'LAIN)
H-OTHER (EXPLAIN) l
- ,, ~
. l*.
l I
j
SUMMARY
The unit*operat~d satisfactorly at a.nominal *100% power with the except-ion 'of.. *the outages noted.above::*
I "J.
RECEIVED OOCUME!JT PHOC:ESSING Uri/ T 191/ APR 6 PM f 43
-*.. ~-
J