ML18347A833

From kanterella
Jump to navigation Jump to search
Monthly Operating Data for September 1975
ML18347A833
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 10/06/1975
From: Brienzo K
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A833 (4)


Text

......

Gentlemen:

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of September, 1975.

Kenneth D. Brienzo Associate Engineer cc:

JGKeppler, NRC RBDeWitt RBSewell 10829

APPENDIX l>

Palisades.

UNIT--------

DATE-~l~0_-~6-_7~5'------

616-764-8913

. COMPLETED BY __,..KD=B=r-=i,,.e=n=z=o __

DOCKET N0._...:;5..;:;0_-==.25.!...5"-----

OPERATING STATt:S

l.

REPORTING PERIOD: __

7_5_0_9_0_1_* ------------ THROUGH ------'-7-'-5_0.:...9.::..30 ______

HOURS IN REPORTl::-:G PERIOD: ___

7_,__2_0 __ -=---------------------=-:--

2.

CURRENTLY ALTllORIZED POWER LEVEL (~1Wth).

2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684

3.

LOWEST POWER LEVEL TO WlllCH SPECIFICALL y RESTRICTED (IF ANY) (MWe-NH): ___

6_,,.3:..;_o ______ _

.4.

REASONS FOR RESTRICTION (IF AN.Y):

Power restricted to 2100 MWT due to~ reduced Pr"imary

THIS CUMULATIVE REPORTING PERIOD S *

. HOURS REACTOR WAS CRITICAL..***.' *******

6.

REACTOR RESERVE SHUTDOWN HOURS..*****

7.

. HOURS GENERA TOR ON LINE.*.. *..*..*******

8.

lrNJT RESER VE SHUTDOWN HOURS. * *. ~ **..*** ;

9.

GROSS THER:'\\IAL ENERGY GENERA TED (:'\\IWH).**.*****************.

JO.*

GROSS.I:'LEqRICAL ENERGY

-GENERATED.(:'\\!Wll)... : ***.*.*.******.***

11.

NET ELECTRICAL ENERGY GENERATED (MWll)

12. 'REACTOR AVAILABILITYfACTOR (1)..*******
13.

UNIT A\\"AIL.-\\BILITY 1-"ACTOR (2)...**.**..**

14.

l'NIT C AP..\\C'ITY FACTOR (3).....**....****

15.

l 1NIT FORCED OllTAGE RATE (4)......... <..

632.4

O 625.. 3

.. 0 977,856 294,260

  • 270 2 1],~

. 87.8%

86.8%

54.8%

12.3%

YR TO DATE TO DATE 3 2921.5 1.42128.4 0

0 3 2794.8

  • 132115-2 0

0 6,019,320 20J132*, 880 1,774~000 6";-278 J 250 1z622 z *.032*

-2 1882, :Z4P

.. 59:9~

21-210 43.i~ *.

39.8.. *.

36.3~

22.8~

  • 41.9%

.57.4~

16.

SlWTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE. A ND DURATION OF EACH):

17.

IF Slll'.T DOWN AT END OF REPORT PERIOD, ESTI.MATED DATE Of STARTUP: ____________ _

18.

UNITS IN TEST STA TVS (PRIOR TO CO~l~IERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

. REACTOR A \\'AILABILITY FACTOR (2)

UNIT AVAILABILITY FACTOR (3)

VNIT C' APACITY FACTOR L'NIT FORCED Ol'TAGE RATE INITlr\\L CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GEN£RATOR ON LINE

~-~----------XlOO HOURS IN REPORTING PERIOD NF.T El.FCTRICAL PO\\\\TR GFNFRATED DATE LAST FORECAST DATF ACHIE/. D

  • MAX. Dl-.l'END.-\\1.lLI*: CAPACITY (M\\l'c-NET) X HOURS IN RU'ORTIN<..; l'ERIOL>

FOltCED ol:TAGE l!Ol:Rs

--~~-~-----~-----------XlOO llOURS GENERATOR ON Lll':E +FORCED OUTAGE HOURS J.16-D*I

APPEND.IX C co DOCKET NO.

50-255.

UNIT --Palisades

~

('(J DATE Il.:0-6-75 COMPLETED BY KDBrienzo AVERAGE DAILY UNIT POWER LEVEL MONTH Se:12tember 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (f\\1Wc-net)

DAY (MWe-net) 1 422 17*.

543 2

423 18 458 I

3 424 19; 498 4

432 20 506 5

415 21 508 6

0 22 509 7

0 23

. 511 8

0 24 5-08 9

0 25 508 10 65 26 507.

11 145

27.

511 12 225 28 511 13 220 29 511 14 373' 30 510 1'5 447 31 16 427 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for. each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the I 00% line (or the restricted power level* line). In such cases, the c; o av~rage daily unit power output sheet should be footnoted to explain the apparent anomaly.

1.16-C-l L

.,..* ~~1.;\\'1':'.(t,.,,.* '.***~~,... r....... ~*""'"'"'*'"':<1"*-.:l~*~~~~r'~'?'-?'""'~"!f,*~~*~~

.... y~.... ¥"."'*'rfil'i~~~r..:o'r;;)!l!f".":t"'fl -

t"( ;*a+;:rw~e* ~

nnnhha't *st *e;t' * ***ttf &m tth I '

0 TYPE F*FORCED NO.

DATE S*SCHEDULED 8

750906 F

0-

~ -

11 t>>'e*

~-~

/~--~****-------------------------------------------

h

~1

\\

DURATION (HOURS) 87.6 0

APPENDIX E Uf'JIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED UY

.o 50-255 Palisades 75 "KDBrienzo

  • REPORT, MONTH __ s_e_;p_t_em_b_e_r_l_;97_;5_

METHOD OF

~HUTTING DOWN REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS A

l Shutdown to repair Control Rod drive mechanisms.

I

'-I.

(1) REASON (2) METHOD A*-EQUIPMENT FAILURE"(EXPLAIN)

I-MANUAL B-*MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I

D-REGULATORY RESTRICTION 3-AUTOMATIC*

E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERA Tl ON AL ERROR (EXPLAIN)

H-OTHI::R (EXPLAIN)

. ' 'i

l i

  • i. '

I I

! I l I