consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 August 1, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of July 1977.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
Document Control
---A*--*****--* --------------*-**---------*-----
I.
4.
j i it" A. kCf'.:Utn.i:ory *
-~
J_.
APPENDIX D UNIT __
P_a_l_i~s..:;,;a..c;;d:..=e:..:;:s_~-
8-1-77 DATE--=--:---,-------~
616-764-8913 CO>!PLETE:El BY DIBollnow DOCKET ;so.-=5:...::0:....-.=2.:=..5.:=..5 __
OPERA Tl:\\G STATt..:S
- l.
REPDRTl::-:G PERIOD:
770)01 THROUGH ___
7:...7:...c0::..:7:...:3::..:1~------
HOt:RS IN ~EPORTl:\\G PERIOD:
7 44
"--~----------------------,-...;...,
- 2.
Ct:RRE~TLY ACTHORIZED POWER LEVEL {:0.!Wth) 2200. ~!AX. DEPE~DABLE C\\PAC!TY (:\\IWe-:-:E.T) _
_,6,,..3"""5._*..;....
- 3.
LOWEST POWER LEVEL TO WHICH SPEC!r!CALL Y RESTRICTED (IF ANY) (MWe-:-;ET): __ -'----------
- 4.
REASo:-:s FOR RESTRICTION (IF ANY):
TH!3 REPORTl:-:G PERIOD YRTO DATE CC.fliLAT!VE TO DATE
- 5.
HOURS REACTOR WAS CRITICAL.........*.**
722.9 4,793.8
- g6,064. 7 24,551.8
- 6.
REACTOR RESERVE SHUTDOWN HOURS.*****.*
- 7.
HOURS CE"ERATOR ON LINE.....*...**..**
719.1 4,727.6
- 8.
V~JT RESERVE Sl!UTDO\\VN HOURS..*.**.****
- 9.
- GROSS THER'.\\1.-\\L ENERGY i' 554 528.
GL"'ERATED (:\\!WH).* *. * *. *.. * *... *. * *. * *.
9~992~688 42,675,672.*
iO.
GROSS ELECTRlC AL ENERGY
- 11.
- 12.
- 13.
1-l.
- 15.
- 16.
- 17.
- 13.
l..;.)
-GENERATED ('.\\l\\\\"H) *** : *.**.* ; *. *.****, *.*.
!';ET ELECTRICAL ENERGY GENERATED.
('.\\lWll)
REACTOR AV,\\lLABILITY FACTOR (I)...*.....
eN!T AVAlL:\\BILITY fACTOR (2) *..*....***.
L'NIT <: AP.-\\CITY FACTOR.(3) *.*..**.**..***.
l!NIT FORCED Ol'TAGE RATE (4).,......* *...
470,340 441;340 97.2%:
96.7%
,93.4%
0%
3,134_,850 2 '949,113 94.2%
=-=--9.2.9%
~_!_.3%
1.9%.
. 13' 320 '050*
'12,477,792
.-,-_*5~~: ~ %
_.:._5_Q_.. 2 %
- 40. 9%
43.0%
SHl:H)OW:\\S SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (ST:\\TE TYPE, DATE, AND DUR:\\TIQ:-; OF EACH):
lF" SHlT DOWN.-\\TEND OF REPORT PERIOD, ESTl~!ATED DATE OF STARTt!P: "'"**_..,.._ _________
tiN!TS IN TEST ST.-\\TliS (PRIOR TO COM~IERC!AL OPERATION) REPORT THE fOLLOWlNG:
REACTOR AVAILABILITY FACTOR L::-.,:rrr\\VAILABIL.IT'( F;).CTOR.
t:~rr FOlKED Ol'TAGE RA"ff:.
. INITIAL tRIT1CAUTY INITIAL ELECTRICAL
- POWER GE!\\ER.-\\ TION CQ;\\!~!ERC!A L. OPERA T!ON HOU.RS RE:\\CTOR \\'/AS CRITICAL HOL'RS IN REPORTl~G PERIOD x 1.00 HOURS GENERATOR O~ Ll~E
~---------~-~x100
- HOURS IN REPOiUl:\\G PERIOD NET ELF.CTRIC\\L POWFR CE~H'.ATED DATE LAST FORECAST DATE AG!IEVED.
MAX. DEPENIHBLI*. C,\\l',\\CIT'i' l:'o!Wc-NETJ x. HOURS IN REl'ORT!N(.; l'J::~roL>
~~---~--'"-'--'-XlOO HCtiRS GENER.*\\ TOR. ON Ll;"\\!:: +FORCED OliTAGE HOUH.S
~~-
APPENDIX C DOCKET NO. 5o-25:S UNIT Palisades DATE 8-i COMPLETED BY DIBollnow AVERAGEDAlLY UNIT POWERLEVEL MONTH __
J"""'u_,.ly~1""'9_,_7_,_7 ____ _
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL.
DAY (l\\1We-net)
DAY (MWe-net}
1 647 17*
336 2
653 18 619 3
641 19 622
.4 623 20 622 5
626 21 631 6
622 22 644 7
629 23 650 8
634 24 639 9
635.
25 645 10 640 26 656
- 11 637 27 -
659 12 626 28 656 13 640 29 645 14 6Ja 30 40 l5 594 31 243 16 620 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the av~rage daily unit power level in ~1We-net for each day in the reporting month.
Compute to the nearest whole m~g:.iwatt.
These figures will be used to plot a graph for each r(:porting month. Note that by using maximum.
dcpcnd:.ibk capa..:ity for the net ekctrical rating of th:: unit. there m::iy be occJsions when the daily average pov-;cr \\evd exceeds the I oo*~(. line (or the rcstrii.:tcd power kvel-liac). In such C3S-:!S. the
- avc::ragc daily unit power output sh;:t:t should be footr~ot~d w cxpbin the ~pp2rent anomaly.
1.16-C-l
1,*'"4.46""""'~~~*'*~;;:""h4*:*,..,...,~.....,,,,,,,,.:*"'.....,,,.__.,k.,"'""
- fa*-
>lolW-*
.................. 'A'.w*<py *,,;'
... ----.. ~~-....~
"('....,.
~***~,~.,..'.........u:.,pru** N "tt' *If i rt I
I j.
- J
} '
l
°'
rr. -
NO.
DATE 8
770717 9
770730 TYPE F*FORCED S"SCHEDULED
.S DURATIPN (HOURS) 0 21.1 APPENDIX E UNIT SHUTDOWNS REPORT MONTH July 1977 METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
~.*......
1*
DOCKET NO._.;;...;;....~;;;.__ ___ *,_,
- UN IT NAME __
P_al_i_* s_a_d_e_s __._,.,
D/\\TE August 1, 19-77
.. COMPLETED 13 y __
D_IB_o_l_l_no_w __
CORR.ECTIVE ACTIONS/COMMENTS Power reduction. to. perform cleanup to the west condenser water box "from cooling tower fill -demins.
- 1.
Low oil level indication in Primary Coolant pump motor bearing reservoir.
- 2.
Repairs to reheater steam supply val vi ~. -
. (1) REASON (2) METHOD.*
A-*EQUIPMENT FAILURE'(EXPLAIN)
I-MANUAL
~
B* M/\\INT. OR TEST 2-MMWAL C* REFUELING SCRAM D-RECULATORY RESTRICTION 3-AUTOMATIC E-Ol't;.It/\\TOR TRAINING AND SCitA~l LICENSE EX/\\MJNATION F-ADMINISTI~ATIVE G-Ol'ER/\\TIONAL ERROR (EXPLAIN)
H-OTllER (EXPLAIN) 1
SUMMARY
Unit operated at a n<;>minal 100% except for the *po,wer r~duction and short outage listed above.