Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 November 1, 1977 U.S.Nuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of October 1977.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt DAB ix el CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.

AKozlowski, Mich. Dept. of Labor Document Control 950-22.35.10 (2 copies)

RCallen, Mich. Pub. Serv. Comm., Lansing, Mi.

  • ....,.,i' OPERATING DATA REPORT OPERATING STATUS
1. Unit Name:

Palisades Notes

. 2. Reporting Period:

10-1-77 to 10-31-77

3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):

81L 7

5. Design Electrical Rating (Net.MWe):

805

6. Maximum Dependable Capacity (Gro~ MWe):

6 7 5

7. Maximum Dependable Capacity (Net MWe):

635 DOCKET NO.

DATE COMPLETED BY TELEPHONE

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

50-255 11-1-77 DIBollnow 616-764-8913

.10. Reasons For Restrictions, If Any: -----*---------'------------=-~-

This Month Yr.-to-Date Cumulative

  • 11. Hours In Reporting Period 745 7,296
12. Number Of Hours Reactor Was CritiCal 745 6,744.9
13. Reactor Reserve Shutdown Hours 0
0. --
14. Hours Generator On-Line 745 6,648~7
15. Unit Reserve Shutdown Hours

. 0 0

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 1,630,296 512,740 14' 177*, 304 4,432,730
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100%

4,170,418.

483,279

.91.J,%

  • 20. Unit Availability Factor 100%

91.1%

21. Unit Capacity Factor (Using MDC Net) 102. 2%

90.0%

22. Unit Capacity Factor (Using DER Net) 180. 6%

71.0%

23. Unit Forced Outage Rate 0%

5.4%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

51;447.

28,015.8 0..

26 ;472. 9

. 0 46,860,288 14' 617 ;930 13 '69.9 '097

. 51. 5%

51.5%

4L9%

33.1%.

41. 6%

' __._f:

--~R""e_f""'u""':e""'l""ic:.:n""g"-/.::.S..:. *..:..G..:. *.::.S..:::u.::.r..:..v.::.e.;;:i..:::l..:::l.::.ac:::n:.::::c..::ec_.::6..::u..::t.:::a:i:ig..::e-'-..:--=.J.:::a.:!n.:::u.:::a.=.r.z..Y_:::.l::..9~7~7_--=l:::.2_..!!W.=e.=e~k~s ___ _.;_ __

__;_...,....~*....

r *

~.~~. 7. _,. =

25. If Shut Down At End Of Report Period, Estimated Date of Startup'.
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.

  • ~*

Forecast Achie~ea *

~-.. *,: :.

(9/77)

  • =<.oqr_rza

.. ~. :

,,.....,,.,.' ~

.~.

  • l _.:_._;,;._ __ *

.;!!mllE..,.., ----------~.:__

_::.~:.....*J _________

      • _* _*_* _* *-----:----..... ---*-***_* _* _*..;::*-->>:=.:~::

1

'C-~

C"..

  • .. )

r~

~

~

- ~J

\\,*~-.... 1,:

-~

~ :r ~

APPENDIX D UNIT SHU"J:DOWNS AND POWER REDUCTIONS REPORT MONTH Oetober 1977 METHOQ OF TYPE SHUTTING DOWN

.I F: FORCED DURATION THE REACTOR QR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

  • REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS NONE (1)

~EASON

.~-*

f..: EQUIPMENT FAILURE (EXPLAIN)

  • ~; ~i\\l~T* Q~ TEST
  • C: ~EFl./Hll;4P I

p; ~EGU~f\\TORY.RESTRICTION E: OPERA'fOR-TRAINING AND LlCENSE EXAMINATION f: ADMIN~STRATIVE G; 0!'~\\J{f\\tl9J'4AL ERROR (EXPLAIN) ll: P'l'llL!ll. mxPLAIN)

I (2)

METHOD l: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4: OTllER (EXPLAIN)

SUMMARY

The Plant operated at a nominal *100% powe~ le~el fo!l'.1 *the. first* 15 days of.* the m~~th.

  • For the*.
  • rem~inder. of.the month the Plant operated at. approximately 99% power l~ve\\ d

__ ue to !a.!eedwater

  • heater being out \\>f service~-

.r~ ~

APPENDIXB AVERAGE DAILY UNIT POWER LEVEL MONTH __

o_c_t_ob_e_r_l_9_7_7 _ __,.. __

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 656 2

659' 3

661 4

661 5

658 6

661

  • 7 660 8

657..

9 663 659 10*

11 q62 12 663 13 670 14 664 15 631 16 630 DOCKET NO. _

5_0_-_25_5 ____ _

. UNIT _P_a1_:1_* s_* a_d_e_s ___ _

DATE _1_1-_1_-_7_7 ___ _

COMPLETED BY _n_r_B_o~l-ln_o_w ___

TELEPHONE 616--764~8913 I DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17

. 639 18 634 645 19 20 645 21 636 642 22 23 645

2'4 637
  • 25 632 638 26 27 637 28 641 644 29 30-640 627

~

~

f.

t'.

t:f i r, t 1:

ii

    • fi ti J; r:

~J i:i f fj v

¥1

~j t ~

31.

Iil INSTRUCTIONS n

On this form, list the average daily unit power level in MWe-Net for each day in"the reporting month. Compute to tho: U nearest whole megawatt.

[i f1.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity 1' used for the net electrh:al rating of the unit. there may be. occasions \\vhen the daily average power \\evd exceeds th.: '.'

100% line (or the restricted power level line). In such cas.:s, the average daily unit power output sheet shou!i.l h: [*;

footnoted to explain the apparent anomaly.

f.i 1.16-8 ii

RECEIVED DOCUMENT PROCESSir~G lJNiT 19T7 NOV 7 PM I 4 9