Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 November 1, 1977 U.S.Nuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of October 1977.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt DAB ix el CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
AKozlowski, Mich. Dept. of Labor Document Control 950-22.35.10 (2 copies)
RCallen, Mich. Pub. Serv. Comm., Lansing, Mi.
- ....,.,i' OPERATING DATA REPORT OPERATING STATUS
- 1. Unit Name:
Palisades Notes
. 2. Reporting Period:
10-1-77 to 10-31-77
- 3. Licensed Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
81L 7
- 5. Design Electrical Rating (Net.MWe):
805
- 6. Maximum Dependable Capacity (Gro~ MWe):
6 7 5
- 7. Maximum Dependable Capacity (Net MWe):
635 DOCKET NO.
DATE COMPLETED BY TELEPHONE
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
50-255 11-1-77 DIBollnow 616-764-8913
.10. Reasons For Restrictions, If Any: -----*---------'------------=-~-
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745 7,296
- 12. Number Of Hours Reactor Was CritiCal 745 6,744.9
- 13. Reactor Reserve Shutdown Hours 0
- 0. --
- 14. Hours Generator On-Line 745 6,648~7
- 15. Unit Reserve Shutdown Hours
. 0 0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 1,630,296 512,740 14' 177*, 304 4,432,730
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100%
4,170,418.
483,279
.91.J,%
- 20. Unit Availability Factor 100%
91.1%
- 21. Unit Capacity Factor (Using MDC Net) 102. 2%
90.0%
- 22. Unit Capacity Factor (Using DER Net) 180. 6%
71.0%
- 23. Unit Forced Outage Rate 0%
5.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
51;447.
28,015.8 0..
26 ;472. 9
. 0 46,860,288 14' 617 ;930 13 '69.9 '097
. 51. 5%
51.5%
4L9%
33.1%.
- 41. 6%
' __._f:
--~R""e_f""'u""':e""'l""ic:.:n""g"-/.::.S..:. *..:..G..:. *.::.S..:::u.::.r..:..v.::.e.;;:i..:::l..:::l.::.ac:::n:.::::c..::ec_.::6..::u..::t.:::a:i:ig..::e-'-..:--=.J.:::a.:!n.:::u.:::a.=.r.z..Y_:::.l::..9~7~7_--=l:::.2_..!!W.=e.=e~k~s ___ _.;_ __
__;_...,....~*....
r *
~.~~. 7. _,. =
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup'.
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.
- ~*
Forecast Achie~ea *
~-.. *,: :.
(9/77)
- =<.oqr_rza
.. ~. :
,,.....,,.,.' ~
.~.
- l _.:_._;,;._ __ *
.;!!mllE..,.., ----------~.:__
_::.~:.....*J _________
- _* _*_* _* *-----:----..... ---*-***_* _* _*..;::*-->>:=.:~::
1
'C-~
C"..
- .. )
r~
- ~
~
- ~J
\\,*~-.... 1,:
-~
~ :r ~
APPENDIX D UNIT SHU"J:DOWNS AND POWER REDUCTIONS REPORT MONTH Oetober 1977 METHOQ OF TYPE SHUTTING DOWN
.I F: FORCED DURATION THE REACTOR QR NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
- REDUCING POWER (2)
CORRECTIVE ACTIONS/COMMENTS NONE (1)
~EASON
.~-*
f..: EQUIPMENT FAILURE (EXPLAIN)
- ~; ~i\\l~T* Q~ TEST
- C: ~EFl./Hll;4P I
p; ~EGU~f\\TORY.RESTRICTION E: OPERA'fOR-TRAINING AND LlCENSE EXAMINATION f: ADMIN~STRATIVE G; 0!'~\\J{f\\tl9J'4AL ERROR (EXPLAIN) ll: P'l'llL!ll. mxPLAIN)
I (2)
METHOD l: MANUAL 2: MANUAL SCRAM.
3: AUTOMATIC SCRAM 4: OTllER (EXPLAIN)
SUMMARY
The Plant operated at a nominal *100% powe~ le~el fo!l'.1 *the. first* 15 days of.* the m~~th.
- For the*.
- rem~inder. of.the month the Plant operated at. approximately 99% power l~ve\\ d
__ ue to !a.!eedwater
- heater being out \\>f service~-
.r~ ~
APPENDIXB AVERAGE DAILY UNIT POWER LEVEL MONTH __
o_c_t_ob_e_r_l_9_7_7 _ __,.. __
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 656 2
659' 3
661 4
661 5
658 6
661
- 7 660 8
657..
9 663 659 10*
11 q62 12 663 13 670 14 664 15 631 16 630 DOCKET NO. _
5_0_-_25_5 ____ _
. UNIT _P_a1_:1_* s_* a_d_e_s ___ _
DATE _1_1-_1_-_7_7 ___ _
COMPLETED BY _n_r_B_o~l-ln_o_w ___
TELEPHONE 616--764~8913 I DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17
. 639 18 634 645 19 20 645 21 636 642 22 23 645
- 2'4 637
- 25 632 638 26 27 637 28 641 644 29 30-640 627
~
~
f.
t'.
t:f i r, t 1:
ii
- fi ti J; r:
~J i:i f fj v
¥1
~j t ~
31.
Iil INSTRUCTIONS n
On this form, list the average daily unit power level in MWe-Net for each day in"the reporting month. Compute to tho: U nearest whole megawatt.
[i f1.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity 1' used for the net electrh:al rating of the unit. there may be. occasions \\vhen the daily average power \\evd exceeds th.: '.'
100% line (or the restricted power level line). In such cas.:s, the average daily unit power output sheet shou!i.l h: [*;
footnoted to explain the apparent anomaly.
f.i 1.16-8 ii