  • consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 September 8, 1975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C.

20555 RE:

License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of August, 1975-Kenneth D. Brienza Associate Engineer CC:

JGKeppler, NRC RBDeWitt RBSewell

1

-~

--.-~ ~- ---~..

.'.~

t"

,,,~.. -*r----;~.---


.~- _____..... _....,..,...

--~--..........., *. -....,* £.Z:"; -* *.

e-*

APPENDIX C

. I.

(-(*)

DOCKETN0._5_0-_2_5_5_.*_*_. _

UNIT _P_al_i_s_a_d_es __

DATE _9_/2_/_7_5 __

.(~

1 t

I

.** ",1>

  • K. D. Brienza COMPLETED BY -----

AVERAGE DAILY UNIT POWER LEVEL Auguit 1975 MONTH~~~~~~~~~~

DAY 1

2 3

4 5

. 6.

7 8

9.

10 11*

12 13 14 15 16 AVERAGE DAILY POWER LEVEL (MW~-nct) 4ii 335*

_339 347 352 358.:

354 "353

.349 346 347 186 143*

345 415 503 AVERAGE DAILY POWER LEVEL

  • .DAY

(.MWe-net) 17*.

2-39 18 0

,r

.. 19;*

o.

20.

0 21 0

0

. *22

~ 23 0

24

.75

  • 25 136

. 26 206.

27.

278 28 348-

. 29.

412 30

. 216".

31

. 32J DAILY UNIT POWER LEVEL FOR~t INSTRUCTIONS On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.

Compute to the Jl('an:st whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily

(:*. average p~wer ~eve[ excl'cds the I OO~o line (or the rcstrktcd power level* line). In such cases, the

\\average d;.11ly unit power output sheet should be footnoted to expl;1in the apparent anomaly.

((

~.

~ L~-*~~-.. ~*. **--*.. -*--~~...,..~~-:6~-*

.. P.-* ~

O;:J""'!"

(U~ i_t.':lf'C*Qijl4JfLjf't}liti1::04) ~*"°".'*'!! ~14'!31\\ ~'??e*,~i'!i"fifi1' 4.,"- ?i~\\;te>.Cf.F.,... c4(a;:.'i",.'!.,.t

"~-'"'.

0 APPENDIX D' Palisades UNIT--------

DATE __ 9_/_2_/_7_5 __ _

. COMPLETED BY K. D. Bi-ienzo 616-764-8913 DOCKET N0._5_0_-_2_5_5 ___ _

OPERATING STATL"S

l.

REPORTING PERIOD: ___

-'7:..::5;._o......;8_.;;o...::1:;._' _______ THROUGH -----'7

..... 5'-"0'-"8'-3-1..._ ____ _

HOURS IN REPORTl:>:G PERIOD: ___ __.7_4_4 ___________________ _

2.
3.
4.
s.
6.
7.
8.
9.
10.
11.
12.
13.

Ct:RRENTL Y ACTHORIZED POWER LEVEL (~1Wth) 2200

~1AX. DEPENDABLE CAPACITY (MWe-NET) 684*-

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __

-"'6.... 3=0 ______ _

REASO:-;s FOR RESTRICTION (IF ANY):

Power restricted to" 2100 MWT due to reduced Prim.

Coolant Flow as a result of steam generator tube plugging.

THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL *.*...*******

REACTOR RESERVE SHUTDOWN HOURS.* ~ ****

HOURS GENERA TOR ON LINE.*........*** ~ **

UN!T RESERVE SHUTDOWN HOURS.**********.

608.;6 0

GROSSTHER~ALENERGY.

GENERATED (~1WH)..*..***.************. 749,376 GROSS ELECTRICAL ENERGY GEXERA TED (~1Wll) *** : *****************

NET ELECTRICAL ENERGY GENERATED

{MWll)

REACTOR AVAIL:\\BIUT"i FACIOR {l) *****.***

llNIT AVAILABILITY FACTOR (2) *.**********

208,280 185,114 81.8%

78.6%

YR TO DATE 3289.1 0

.3169. 5 0

5,041,464 1,479,740

. 1,358,921 56.4%

CUMULATIVE TO DATE J.3,526

.o 12,490.6 0

. 5,983,990 5,612,626

  • 42 *. 1%.

38.9%.. **.

36.h%

. 14.

l'NITCAP.-\\CITY FACTOR (3)...*.***.******

19.8%.

34.1%

45.5%

29.1%.

58.4%

IS.

. l'NIT. FORCED OllTAGE RATE (4).......*****

16.

sm:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF sun* DOWN.-\\TEND OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: ____________

18.

UNITS IN TEST STATUS (PRIOR TO com!ERCIAL OPERATION) REPOR!THE FOL~OWING:

(I)

REACTOR AVA!L\\BfLITY FACTOR t:NJT AVAILABILITY FACTOR (3).

UNIT C'APACITY FACTOR l:SIT FORCED ot:TAGE !l.ATE

. INITIAL CRITICALITY "INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

~---~-~--~---XlOO HOURS IN REPORTl:\\G PERIOD

  • NF.T ELECTRICAL PO\\\\'FR GF'.'-!F.RATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE l'Al':\\CITY (M\\\\'c-NET) X HOURS IN REPORTING l'ERIOU FORCED OFTAGE l!Ot:RS

~-~~-----~--~--------XlOO HOURS GENERA TOR ON LINE+ FORCED OUTAGE HOURS J.16-D-l

.... IU:

l:O fQflil'.'WWSffC...... W.'fAZV N ~* ** C:.L C I.*

1=

j 1:.

  • I j **

-. -°'

~ -

  • O TYPE F*FORCED DURATION NO.

DATE S*SCHEDULED (HOU.RS) 6 750817 F

135.4 7

750830

F.

. 9

,,. 0
  • APPENDIX E UNIT SHUTDOWNS*

DOCKETN0. ___

5o_~_2<;;;J_._*

UNIT NAME __

Pal_i_s_a_de_s __

. DATE _..;9....;./_2;.,,,,.;/7....;...5 __

.COMPLETED 13Y.

K~D. Brjepzo REPORT MONTH __

. _A_ugu_s_t_l_9_7_5..,.._

REASON (1)

A A.

METHOD OF

~HUTTING DOWN THE REACTOR (2) 1 1

CORRECTIVE ACTIONS/COMMENTS Shutdown to repair control rod.~

drive mechanisms (1) REASON A*-EQUIPMENT FAILURE'(l::XPLAIN)

B* MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTl{ATIYE G-OPEl{ATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) i;

.~

(2) MF.moo 1-MANUAL 2-MANUAL

.SCRAM I

3-A UTOMATIC*

.. ;SCRAM

~

SUMMARY

The unit operated for the month of Augiist ~t 60% *to 80~f power except fq!* the two outages noted ~or. work on defective.control rod drive 'mechanisms: -