- consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 September 8, 1975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C.
20555 RE:
License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of August, 1975-Kenneth D. Brienza Associate Engineer CC:
JGKeppler, NRC RBDeWitt RBSewell
1
-~
--.-~ ~- ---~..
.'.~
t"
,,,~.. -*r----;~.---
.~- _____..... _....,..,...
--~--..........., *. -....,* £.Z:"; -* *.
e-*
APPENDIX C
. I.
(-(*)
DOCKETN0._5_0-_2_5_5_.*_*_. _
UNIT _P_al_i_s_a_d_es __
DATE _9_/2_/_7_5 __
- .(~
1 t
I
.** ",1>
- K. D. Brienza COMPLETED BY -----
AVERAGE DAILY UNIT POWER LEVEL Auguit 1975 MONTH~~~~~~~~~~
DAY 1
2 3
4 5
. 6.
7 8
- 9.
10 11*
12 13 14 15 16 AVERAGE DAILY POWER LEVEL (MW~-nct) 4ii 335*
_339 347 352 358.:
354 "353
.349 346 347 186 143*
345 415 503 AVERAGE DAILY POWER LEVEL
- .DAY
(.MWe-net) 17*.
2-39 18 0
,r
.. 19;*
o.
- 20.
0 21 0
0
. *22
~ 23 0
24
.75
- 25 136
. 26 206.
- 27.
278 28 348-
. 29.
412 30
. 216".
31
. 32J DAILY UNIT POWER LEVEL FOR~t INSTRUCTIONS On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.
Compute to the Jl('an:st whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily
(:*. average p~wer ~eve[ excl'cds the I OO~o line (or the rcstrktcd power level* line). In such cases, the
\\average d;.11ly unit power output sheet should be footnoted to expl;1in the apparent anomaly.
((
~.
~ L~-*~~-.. ~*. **--*.. -*--~~...,..~~-:6~-*
.. P.-* ~
O;:J""'!"
(U~ i_t.':lf'C*Qijl4JfLjf't}liti1::04) ~*"°".'*'!! ~14'!31\\ ~'??e*,~i'!i"fifi1' 4.,"- ?i~\\;te>.Cf.F.,... c4(a;:.'i",.'!.,.t
"~-'"'.
0 APPENDIX D' Palisades UNIT--------
DATE __ 9_/_2_/_7_5 __ _
. COMPLETED BY K. D. Bi-ienzo 616-764-8913 DOCKET N0._5_0_-_2_5_5 ___ _
OPERATING STATL"S
- l.
REPORTING PERIOD: ___
-'7:..::5;._o......;8_.;;o...::1:;._' _______ THROUGH -----'7
..... 5'-"0'-"8'-3-1..._ ____ _
HOURS IN REPORTl:>:G PERIOD: ___ __.7_4_4 ___________________ _
- 2.
- 3.
- 4.
- s.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
Ct:RRENTL Y ACTHORIZED POWER LEVEL (~1Wth) 2200
~1AX. DEPENDABLE CAPACITY (MWe-NET) 684*-
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __
-"'6.... 3=0 ______ _
REASO:-;s FOR RESTRICTION (IF ANY):
Power restricted to" 2100 MWT due to reduced Prim.
Coolant Flow as a result of steam generator tube plugging.
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL *.*...*******
REACTOR RESERVE SHUTDOWN HOURS.* ~ ****
HOURS GENERA TOR ON LINE.*........*** ~ **
UN!T RESERVE SHUTDOWN HOURS.**********.
608.;6 0
GROSSTHER~ALENERGY.
GENERATED (~1WH)..*..***.************. 749,376 GROSS ELECTRICAL ENERGY GEXERA TED (~1Wll) *** : *****************
NET ELECTRICAL ENERGY GENERATED
{MWll)
REACTOR AVAIL:\\BIUT"i FACIOR {l) *****.***
llNIT AVAILABILITY FACTOR (2) *.**********
208,280 185,114 81.8%
78.6%
YR TO DATE 3289.1 0
.3169. 5 0
5,041,464 1,479,740
. 1,358,921 56.4%
CUMULATIVE TO DATE J.3,526
.o 12,490.6 0
. 5,983,990 5,612,626
- 42 *. 1%.
38.9%.. **.
36.h%
. 14.
l'NITCAP.-\\CITY FACTOR (3)...*.***.******
19.8%.
34.1%
45.5%
29.1%.
58.4%
IS.
. l'NIT. FORCED OllTAGE RATE (4).......*****
- 16.
sm:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF sun* DOWN.-\\TEND OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: ____________
- 18.
UNITS IN TEST STATUS (PRIOR TO com!ERCIAL OPERATION) REPOR!THE FOL~OWING:
(I)
REACTOR AVA!L\\BfLITY FACTOR t:NJT AVAILABILITY FACTOR (3).
UNIT C'APACITY FACTOR l:SIT FORCED ot:TAGE !l.ATE
. INITIAL CRITICALITY "INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~---~-~--~---XlOO HOURS IN REPORTl:\\G PERIOD
- NF.T ELECTRICAL PO\\\\'FR GF'.'-!F.RATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE l'Al':\\CITY (M\\\\'c-NET) X HOURS IN REPORTING l'ERIOU FORCED OFTAGE l!Ot:RS
~-~~-----~--~--------XlOO HOURS GENERA TOR ON LINE+ FORCED OUTAGE HOURS J.16-D-l
.... IU:
l:O fQflil'.'WWSffC...... W.'fAZV N ~* ** C:.L C I.*
1=
j 1:.
- I j **
-. -°'
~ -
- O TYPE F*FORCED DURATION NO.
DATE S*SCHEDULED (HOU.RS) 6 750817 F
135.4 7
750830
- F.
. 9
- ,,. 0
- APPENDIX E UNIT SHUTDOWNS*
DOCKETN0. ___
5o_~_2<;;;J_._*
UNIT NAME __
Pal_i_s_a_de_s __
. DATE _..;9....;./_2;.,,,,.;/7....;...5 __
.COMPLETED 13Y.
K~D. Brjepzo REPORT MONTH __
. _A_ugu_s_t_l_9_7_5..,.._
REASON (1)
A A.
METHOD OF
~HUTTING DOWN THE REACTOR (2) 1 1
CORRECTIVE ACTIONS/COMMENTS Shutdown to repair control rod.~
drive mechanisms (1) REASON A*-EQUIPMENT FAILURE'(l::XPLAIN)
B* MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTl{ATIYE G-OPEl{ATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) i;
.~
(2) MF.moo 1-MANUAL 2-MANUAL
.SCRAM I
3-A UTOMATIC*
.. ;SCRAM
- ~
SUMMARY
The unit operated for the month of Augiist ~t 60% *to 80~f power except fq!* the two outages noted ~or. work on defective.control rod drive 'mechanisms: -