.1 consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C.

20555 RE:

License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

DEC--81975 U.o. A1";... ~ c:*1tiHil'

,,..,.\\

COMMISSION ft **"i'iarory

~~-?

Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975.

Howard R. Vernick Associate Engineer CC:

JGKeppler, NRC RBDeWitt RBSewell 13648

((**--.-~

.... ~

APPENDIX D*

Palisades UNIT--------

DATE __

l_2..:.../~3~/7~5--~

. COMPLETED BY H. R. Vernick DOCKET N0~_..:...5_0_-_2.:....5.:....5 ___ _

OPERATING STATL'S

. I.

REPORTll'\\G PERIOD:

75110i THROUGH __

7_,_5'"'1=1=-3.:...0~--------

HOURS IN REPORTl:'\\G PERIOD: ___

7_2_0 __ -_,---------------------,,..,,..,...--

2.

CUR RE NTL Y ACTHORIZED POWER LEVEL (~1Wth). 2200 MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3..

LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __

3_0 _______ _

.4.

REASO~S FOR J3.ESTRICTION (IF AN_Y):

s.
6.
7.
8.

9 *.

10:

11.
12.
13.
14.
15.

~~-

17.
18.

THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL....* : *******.

REACTOR RESER VE SHUTDOWN HOURS *******

HOURS GENERA TOR ON LINE.*.. ~.*. ~ *******

\\JNJT RESERVE SHUTDOWN HOURS. *.. :.**. * **.'

GROSSTHER~ALENERGY GENERA TED (~1WH).**** ; ***************

GROSS.ELECi:RICAL ENERGY

<;EXE RA TED.(~IWll)...,.......*..****. * **

NET ELECTRICAL ENERGY GENERATED (MWll)

REACTOR AVAILABILITY FACTOR (1) *********

UNIT AVAILABILITY FACTOR (2).**..*******.

l 1NIT C'AP.-\\Cl"!Y FACTOR (3).....*.********

l'NIT FORCED Ol!T.AGE RATE (4).......*****

720 720 0

1,212,960 368,220 341,+48.

1QO%

100%

69.3%

0%

YR TO DATE 5;386.5 0

5,189.1 0

8,367,432 2,487,550 2,289,375 67.2%

. 64*.1%

41. 8%

34.5%

CUMULATIVE TO DATE 15,623. 4--".

0 14,510.2 0

22,48ci,992 6,991,800 6,543,080

45. 5%.

42.3%.. *.

3i. 5%

sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH):

IF SllCT DOWN.-\\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: ____________

UNITS IN TEST ST.-\\ TL'S" RIOR TO cml~IERCIAL OPERATION) REPORT THE FOLLOWING:

INITlr\\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED (I)

. R,EAC'TOR r\\ \\'AILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 (2) l:NIT AVAILABILITY FACTOR U-ilT FORCED Ol'TAGE RATE HOURS GENERATOR ON LINE

---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\\\TR GF~F.RATED

  • MAX. Dl*.l'ENl>ABLE CAPACITY (~!We-NET) X HOURS IN REPORTING l'ERIU()

FORCED QL:TAGE llQL:RS


~---~--~--------~-xtoo HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l

I

,-~.

t"*** a 'it**~, Cs h'ir

  • ntr 0 01°t"t tr;. tt'Mh 0

\\

TYPE F*FORCED DURATION NO.

DATE S*SCHEDULED (HOU.RS)

Nori.e

--°'

rr. -

/-~;-)

~"~* -----*--*

......... -_....... _. ------------... *--~~--------"'

0 APPENDIX E UNIT SHUTDOWNS

.o.

DOCKET NO.

50-255 UN IT NAME Palisades Nuclear Plant

  • DATE J2/3/75

.COMPLETED UY H'. R. Vernick REPORT MONTH November, 1975 METHOD OF

~HUTTING DOWN REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS I

(1) REASON (2) MF.TH OD A--EQUIPMENT FAILURE"(EXPLAIN) 1-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I

0-REGULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERA TIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

I

. SIJjJIMARY:

The un::\\.t operated at* 70..,.80% for the *month of Nb'lremper.

'. t'

APPENDIX C

  • DOCKET NO.

50-255..

UNIT Palisades* Nuclear Plant DATE 12/3/75 COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWc-nct)

DAY (MWe-net) 1

.. 191 17*.

  • 485 2

. 438.

18.

487

/

3

--47:1..

.19' 487 4

479 20 486 5

483 21 487 6'

485.*

  • 22 489 7

478 23 488.

8

  • 485 24

.490 9

.481 25 484 10 484

. 26

. 484 1r 486

27.

. 487 12 488 28 490 13 488

29.

483 14 489 30 486 1'5 488 31 487

~...

16 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS

  • .On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(

..... 1 l.. *... *.

  • J.l~.C*I.

~)!'!>>,JN* '.'- Hh':ff~... c ~ :;y:;zi;t ti 5Y,J& ~*V1:~¥fl.".'i'?'_::'**' v~,,..~-"'iM'I.. Q.iii(@.'"'¥19!.'f:Xt~i*if."f"J;::Ut."~"':'Jt.l~*'*~.~~."'*"(*.c ""'~'~fP?!!ii 9.'i}*#.t.~*~~*,.l -

'