.1 consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C.
20555 RE:
License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:
DEC--81975 U.o. A1";... ~ c:*1tiHil'
,,..,.\\
COMMISSION ft **"i'iarory
~~-?
Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975.
Howard R. Vernick Associate Engineer CC:
JGKeppler, NRC RBDeWitt RBSewell 13648
((**--.-~
.... ~
APPENDIX D*
Palisades UNIT--------
DATE __
l_2..:.../~3~/7~5--~
. COMPLETED BY H. R. Vernick DOCKET N0~_..:...5_0_-_2.:....5.:....5 ___ _
OPERATING STATL'S
. I.
REPORTll'\\G PERIOD:
75110i THROUGH __
7_,_5'"'1=1=-3.:...0~--------
HOURS IN REPORTl:'\\G PERIOD: ___
7_2_0 __ -_,---------------------,,..,,..,...--
- 2.
CUR RE NTL Y ACTHORIZED POWER LEVEL (~1Wth). 2200 MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3..
LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): __
3_0 _______ _
.4.
REASO~S FOR J3.ESTRICTION (IF AN_Y):
- s.
- 6.
- 7.
- 8.
9 *.
10:
- 11.
- 12.
- 13.
- 14.
- 15.
~~-
- 17.
- 18.
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL....* : *******.
REACTOR RESER VE SHUTDOWN HOURS *******
HOURS GENERA TOR ON LINE.*.. ~.*. ~ *******
\\JNJT RESERVE SHUTDOWN HOURS. *.. :.**. * **.'
GROSSTHER~ALENERGY GENERA TED (~1WH).**** ; ***************
GROSS.ELECi:RICAL ENERGY
<;EXE RA TED.(~IWll)...,.......*..****. * **
NET ELECTRICAL ENERGY GENERATED (MWll)
REACTOR AVAILABILITY FACTOR (1) *********
UNIT AVAILABILITY FACTOR (2).**..*******.
l 1NIT C'AP.-\\Cl"!Y FACTOR (3).....*.********
l'NIT FORCED Ol!T.AGE RATE (4).......*****
720 720 0
1,212,960 368,220 341,+48.
1QO%
100%
69.3%
0%
YR TO DATE 5;386.5 0
5,189.1 0
8,367,432 2,487,550 2,289,375 67.2%
. 64*.1%
- 41. 8%
34.5%
CUMULATIVE TO DATE 15,623. 4--".
0 14,510.2 0
22,48ci,992 6,991,800 6,543,080
- 45. 5%.
42.3%.. *.
3i. 5%
sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH):
IF SllCT DOWN.-\\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: ____________
UNITS IN TEST ST.-\\ TL'S" RIOR TO cml~IERCIAL OPERATION) REPORT THE FOLLOWING:
INITlr\\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED (I)
. R,EAC'TOR r\\ \\'AILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 (2) l:NIT AVAILABILITY FACTOR U-ilT FORCED Ol'TAGE RATE HOURS GENERATOR ON LINE
---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\\\TR GF~F.RATED
- MAX. Dl*.l'ENl>ABLE CAPACITY (~!We-NET) X HOURS IN REPORTING l'ERIU()
FORCED QL:TAGE llQL:RS
~---~--~--------~-xtoo HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l
I
,-~.
t"*** a 'it**~, Cs h'ir
- ntr 0 01°t"t tr;. tt'Mh 0
\\
TYPE F*FORCED DURATION NO.
DATE S*SCHEDULED (HOU.RS)
Nori.e
--°'
rr. -
/-~;-)
~"~* -----*--*
......... -_....... _. ------------... *--~~--------"'
0 APPENDIX E UNIT SHUTDOWNS
.o.
DOCKET NO.
50-255 UN IT NAME Palisades Nuclear Plant
- DATE J2/3/75
.COMPLETED UY H'. R. Vernick REPORT MONTH November, 1975 METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS I
(1) REASON (2) MF.TH OD A--EQUIPMENT FAILURE"(EXPLAIN) 1-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I
0-REGULATORY RESTRICTION 3-AUTOMATIC*
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERA TIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
I
. SIJjJIMARY:
The un::\\.t operated at* 70..,.80% for the *month of Nb'lremper.
'. t'
APPENDIX C
- DOCKET NO.
50-255..
UNIT Palisades* Nuclear Plant DATE 12/3/75 COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWc-nct)
DAY (MWe-net) 1
.. 191 17*.
- 485 2
. 438.
- 18.
487
/
3
--47:1..
.19' 487 4
479 20 486 5
483 21 487 6'
485.*
- 22 489 7
478 23 488.
8
- 485 24
.490 9
.481 25 484 10 484
. 26
. 484 1r 486
- 27.
. 487 12 488 28 490 13 488
- 29.
483 14 489 30 486 1'5 488 31 487
~...
16 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS
- .On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(
..... 1 l.. *... *.
- J.l~.C*I.
~)!'!>>,JN* '.'- Hh':ff~... c ~ :;y:;zi;t ti 5Y,J& ~*V1:~¥fl.".'i'?'_::'**' v~,,..~-"'iM'I.. Q.iii(@.'"'¥19!.'f:Xt~i*if."f"J;::Ut."~"':'Jt.l~*'*~.~~."'*"(*.c ""'~'~fP?!!ii 9.'i}*#.t.~*~~*,.l -
'