consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 July 1, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:
fj:egula __ ton,. D 3ocket Fil~
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of June 1977.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.
Document Control
***** *- ----------~-------~---,-------------~-_-:;==-....-----~=-~-
r.*
~i.*
.i
- l I ({
l t-----*.
.. ~
' *~
<:,.,. r
>;'*~
- .~
-:..Je..,A,.:.)_;
~
l *i APPENDIX D OPERATI:-.'G STATCS UNIT _.;;::_P..:;:a..::1..::i:=s..::a:.:::d:.:::e:.:::s_~-
DA TE --::-J-,:--u-=l_y_...,.1_,__,.1_9_7_7 __
616-764-8913 CO'.\\!?LETEE> BY __
D_I_B_o_l_l_n_o_w __ _
50-255 DOCKET ?-:Q ________
- 1.
REPORTl:-:G PERIOD:
770601 THROUGH 770630
~-=-:c..=;...::..=~------~---'---
HOC RS iN REPORTISG PERIOD:
720
- 2.
CCRRE~TLY ACTHORIZED POWER LEVEL {:'>IW:h}
2200 ~!AX. DEPENDABLE.CAPACITY (:0.lWe-~E.T}
635
- 3.
LOWEST POWER *LEVEL TO Wll!CH *SPECiFICALL Y RESTRICTED (IF ANY}.(MWe-NET):__;c___.;_ __
-'--..--,.--~--..
- 4.
REASO:-:S FOR RESTRICT!O~ (!F A~Y):
- THIS REPORT!i':G PERIOD
- 5.
HOURS REACTOR WAS CR!TICAL........ *.. *
- 720
- 6.
REACTOR RESER V-E SHUTDOWN HOURS..**, *,
- 7.
HOCRS GENERATOR ON LINE..... ~. _.....**
720
- 8.
0VNJT RESER\\"£ SHUTDOWN HOURS..*.**..* ~.
- 9_-
GROSS THER'.\\~AL E~ERGY CC-fl.JL\\T!VE YRTO DATE
.TO DATE 42070.9 2:5, 341. 8 4!008.5
-1.l.t832.7 GE!'\\ ER.-\\ TED (:-OIWH) ********..* -.****.***
1,596,000 8,438,160 41,121.144
- 10.
GROSS ELECTRICAL E;:.iERGY
- -GE:\\ERATED (>1'.'iH~ *.. : *..*.........***,
- 500,900 2, 6_64_, 510 12,849,710
- 11.. NET ELECTRICAL E(';ERGY.GE:--;ERATED
- ('.\\!WI!)
- 472,542 100%
2,soz.z43
]2,036,452
- 12.
- 13.
RE.-\\CTOR A V:..\\lU\\Bl LITY F.-\\CTOR (!).......*.
.UNIT A\\"A!l...\\BILITY FACTOR (2) *.**********
93.* 7%
52.6%
~2.3%
49 *.2%.
- 14.
l'N!T CAP...\\Ci TY !-:ACTOR (3).........*..*.*
___1QO% --**
103.4%
0%
90.9%*
- 40. lf'"-
15.. t?N!T FORCED Ql.!T,\\GE RATE (4) *.....*.*...
2*.3%
43.8%
- 16.
Sl!t=TDOW:\\S SC'HEDULEDTO BEG!;-; JN.);EXT 6 MONTHS (STAT£ TYPE, DATE,A:\\D DURf1.T1m; OF EACH):.
- 17.
- 18.
(l)
(2)
(3) 1.;1 IF sm:r DOWN AT END OF -REPORT PERloD, ESTt>tATED PATE oF STARTUP:_~_
UNITS J:--i TEST ST.-\\Tt.:S (PRIOR TO co:.l~!ERCIAL OPERATION) REPORT THE fOLLOWl'.'iG:
DATE LAST DATE FOREC.-\\ST ACHIEVED REACTOR A \\"...\\lLAB!LlTY FACTOR t:NIT AVAILABILITY FACTOR FNIT (",\\PACITY FACTOR t::\\IT FORCED ot=T AGE RATE IN!TJAL CR!T!CALlTY INITl;\\L ELECTRICAL
. POWER GENER:\\ TION COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITiC:'.L HOURS IN REPORTl>iG PERIOD x lOQ.
HOURS GENERATOR 0:--< Ll:\\E
-=---'-~~----~---XlOO HOt;RS IN REPORT!:-\\G PERIOD NET F.LECTRIC".-\\L POWFR GE:-:FP.ATEO FORCED OL;TAGE ilOL'RS *~~~~~--'~~-~~-"--XlOO HOL'l-~S GE:-iER:\\TOR ON l.!;-;!:'. +FORCED OliTAGE HOURS 1.16-D* l
APPENDIX C DOCKET NO.
50-255 UNIT Palisades DATE July *l, 1977 COMPLETED BY DIBollnow AVERAGE DAILY UNlT POWER LEVEL MONTH _ _;Jo..:u=n=e'-* -=-1~97....,7'-------
AVERAGE DAILY POWER LEVEL AVERAGE.DAILY POWER LEVEL.
DAY (MWe-net)
DAY
(.MWe-net) 1 659 17*
640
- i.
2 662 18 651 3
653 19 659 4
655 20 656 5
653 21 660 6
658 22 660 7
669 23 660 8
663 24 648 9
670 25 652 10 657 26 650 11 662
- 27.
6~6 12 660 28 641 13 665 29 648 14 664 30
. 646 l5
. 661 31 16 653 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On thi:> form, list the average daily unit power level in l\\lWe-net for each day in the reporting month.
Compute to the nean:st whole mcg:.l\\vatt.
These figures will be used to plot :.i graph for each reporting n\\onth. Note that by using maximum.
dependable capa..:ity for the net dcctric.Jl rating of the unit. there nl.'.ly bl! occasions when the daily average pO\\vcr kvel excc.:eds the I 00'} line (or the restricted powa level* line). In such cases. the G*,c**..
- aver:igc: daily unit pow~r output sl!::d should be foot1wted. w explain the app:m::nt arwmaly.
J.I 6*C-l
l 1
TYPE F*FORCED DURATIPN NO.
DATE S*SCHEDULED * (HOU.RS)
REASON {1)
I NONE' Mf:THOD OF
~HUTTING DOWN THE REACTOR (2)
I '.
CORR.ECTIVE ACTIONS/COMMENTS
{l) REASON A**EQU!PMENT FAILURE'(EXPLAIN) 13* MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPEl~ATOI~ TR/\\INING AND LICENSE EXAMINATION F-ADMJNISTRATIVE G-Ol'EH.ATlONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
(2) METHOD..
J-MANUAL 2-MANUAL.
SCRAM 3-AUTOMA\\IC.
SCRA~1
SUMMARY
The Plant. operated a.t a nominal 100% pow~r. throughout the month.
'