Monthly Operating Data for June 1977
ML18347A806
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 07/01/1977
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A806 (5)


Text

--.;:

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 July 1, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

fj:egula __ ton,. D 3ocket Fil~

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of June 1977.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.

Document Control


***** *- ----------~-------~---,-------------~-_-:;==-....-----~=-~-

r.*

~i.*

.i

- l I ({

l t-----*.

.. ~

' *~

<:,.,. r

>;'*~

.~

-:..Je..,A,.:.)_;

~

l *i APPENDIX D OPERATI:-.'G STATCS UNIT _.;;::_P..:;:a..::1..::i:=s..::a:.:::d:.:::e:.:::s_~-

DA TE --::-J-,:--u-=l_y_...,.1_,__,.1_9_7_7 __

616-764-8913 CO'.\\!?LETEE> BY __

D_I_B_o_l_l_n_o_w __ _

50-255 DOCKET ?-:Q ________

1.

REPORTl:-:G PERIOD:

770601 THROUGH 770630

~-=-:c..=;...::..=~------~---'---

HOC RS iN REPORTISG PERIOD:

720

2.

CCRRE~TLY ACTHORIZED POWER LEVEL {:'>IW:h}

2200 ~!AX. DEPENDABLE.CAPACITY (:0.lWe-~E.T}

635

3.

LOWEST POWER *LEVEL TO Wll!CH *SPECiFICALL Y RESTRICTED (IF ANY}.(MWe-NET):__;c___.;_ __

-'--..--,.--~--..

4.

REASO:-:S FOR RESTRICT!O~ (!F A~Y):

  • THIS REPORT!i':G PERIOD
5.

HOURS REACTOR WAS CR!TICAL........ *.. *

  • 720
6.

REACTOR RESER V-E SHUTDOWN HOURS..**, *,

7.

HOCRS GENERATOR ON LINE..... ~. _.....**

720

8.

0VNJT RESER\\"£ SHUTDOWN HOURS..*.**..* ~.

9_-

GROSS THER'.\\~AL E~ERGY CC-fl.JL\\T!VE YRTO DATE

.TO DATE 42070.9 2:5, 341. 8 4!008.5

-1.l.t832.7 GE!'\\ ER.-\\ TED (:-OIWH) ********..* -.****.***

1,596,000 8,438,160 41,121.144

10.

GROSS ELECTRICAL E;:.iERGY

    • -GE:\\ERATED (>1'.'iH~ *.. : *..*.........***,
  • 500,900 2, 6_64_, 510 12,849,710
11.. NET ELECTRICAL E(';ERGY.GE:--;ERATED
  • ('.\\!WI!)
  • 472,542 100%

2,soz.z43

]2,036,452

12.
13.

RE.-\\CTOR A V:..\\lU\\Bl LITY F.-\\CTOR (!).......*.

.UNIT A\\"A!l...\\BILITY FACTOR (2) *.**********

93.* 7%

52.6%

~2.3%

49 *.2%.

14.

l'N!T CAP...\\Ci TY !-:ACTOR (3).........*..*.*

___1QO% --**

103.4%

0%

90.9%*

40. lf'"-

15.. t?N!T FORCED Ql.!T,\\GE RATE (4) *.....*.*...

2*.3%

43.8%

16.

Sl!t=TDOW:\\S SC'HEDULEDTO BEG!;-; JN.);EXT 6 MONTHS (STAT£ TYPE, DATE,A:\\D DURf1.T1m; OF EACH):.

17.
18.

(l)

(2)

(3) 1.;1 IF sm:r DOWN AT END OF -REPORT PERloD, ESTt>tATED PATE oF STARTUP:_~_

UNITS J:--i TEST ST.-\\Tt.:S (PRIOR TO co:.l~!ERCIAL OPERATION) REPORT THE fOLLOWl'.'iG:

DATE LAST DATE FOREC.-\\ST ACHIEVED REACTOR A \\"...\\lLAB!LlTY FACTOR t:NIT AVAILABILITY FACTOR FNIT (",\\PACITY FACTOR t::\\IT FORCED ot=T AGE RATE IN!TJAL CR!T!CALlTY INITl;\\L ELECTRICAL

. POWER GENER:\\ TION COMMERCIAL OPERA TlON HOURS REACTOR WAS CRITiC:'.L HOURS IN REPORTl>iG PERIOD x lOQ.

HOURS GENERATOR 0:--< Ll:\\E

-=---'-~~----~---XlOO HOt;RS IN REPORT!:-\\G PERIOD NET F.LECTRIC".-\\L POWFR GE:-:FP.ATEO FORCED OL;TAGE ilOL'RS *~~~~~--'~~-~~-"--XlOO HOL'l-~S GE:-iER:\\TOR ON l.!;-;!:'. +FORCED OliTAGE HOURS 1.16-D* l

APPENDIX C DOCKET NO.

50-255 UNIT Palisades DATE July *l, 1977 COMPLETED BY DIBollnow AVERAGE DAILY UNlT POWER LEVEL MONTH _ _;Jo..:u=n=e'-* -=-1~97....,7'-------

AVERAGE DAILY POWER LEVEL AVERAGE.DAILY POWER LEVEL.

DAY (MWe-net)

DAY

(.MWe-net) 1 659 17*

640

i.

2 662 18 651 3

653 19 659 4

655 20 656 5

653 21 660 6

658 22 660 7

669 23 660 8

663 24 648 9

670 25 652 10 657 26 650 11 662

27.

6~6 12 660 28 641 13 665 29 648 14 664 30

. 646 l5

. 661 31 16 653 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On thi:> form, list the average daily unit power level in l\\lWe-net for each day in the reporting month.

Compute to the nean:st whole mcg:.l\\vatt.

These figures will be used to plot :.i graph for each reporting n\\onth. Note that by using maximum.

dependable capa..:ity for the net dcctric.Jl rating of the unit. there nl.'.ly bl! occasions when the daily average pO\\vcr kvel excc.:eds the I 00'} line (or the restricted powa level* line). In such cases. the G*,c**..

  • aver:igc: daily unit pow~r output sl!::d should be foot1wted. w explain the app:m::nt arwmaly.

J.I 6*C-l

l 1

TYPE F*FORCED DURATIPN NO.

DATE S*SCHEDULED * (HOU.RS)

REASON {1)

I NONE' Mf:THOD OF

~HUTTING DOWN THE REACTOR (2)

I '.

CORR.ECTIVE ACTIONS/COMMENTS

{l) REASON A**EQU!PMENT FAILURE'(EXPLAIN) 13* MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPEl~ATOI~ TR/\\INING AND LICENSE EXAMINATION F-ADMJNISTRATIVE G-Ol'EH.ATlONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

(2) METHOD..

J-MANUAL 2-MANUAL.

SCRAM 3-AUTOMA\\IC.

SCRA~1

SUMMARY

The Plant. operated a.t a nominal 100% pow~r. throughout the month.

'