consumers Power company Route 1, Box 178, Covert, Michigan 49043 Re:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a revised copy of the Monthly Operating Data - Form Appendix D, for the Palisades Nuclear Plant for the month of May, 1976.
WE Adams General Engineer cc :
JGKeppler, NRC RBDeWitt RBSewell DeVanFarowe, Div. of Radiological Health Lansing, Mich.
os APPENDIX D CORRECTED OPERATING STATt:S UNIT Palisades DATE_5_-_7~-~7_6 ____
COMPLETED BYDIBollnow/6l6-764"-89i3 DOCKETNO ~5~0_-_2~5~5---~-
I.
REPORTING PERIOD:_~7_6_-0~5~-_0_l ________ THROUGH 76053l HOt:RS IN REPORTI:-:G PERIOD: ____ --4--'-'-'----------------------
- 2.
- 3.
CURRENTL Y A lJTHORIZED POWER LEVEL (MWth) 2200
.MAX. DEPENDABLE CAPACITY (MWe-NET) 720 LOWEST POWER LEVEL TO WHICH SPECIF-KALLY RESTRICTED (IF ANY) (M\\Ve-NET): _________
- 4.
REASO~S }:OR RESTRICTION (IF ANY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL............*
- 6.
REACTOR RESERVE SHUTDOWN HOURS......*
7 *. *HOURS GDiJ:RATOR ON L!NE...*.... : :..**.
il.
trNJT RESERVE SHUTDOWN lIOURS *:... ::** ** : *..
- 9.
GROSS THER.'.\\IAL ENERGY GENERATED ('.\\1WH)..*.*....**.****...**
485.8 0
393.2 0.
YR TO DATE 485.8 0
393.2~
Q'.
cm.I ULA TIVE TO DATE l6,572.8 0
. l5,367.0 0
23,589,24o
. 11"'.
. 10.
eri )** ll.
GROSS ELECTRICAL ENERGY
-GENERATED (.\\IWH)..., : : :. ;*:;... ;.: *..**
NET ELECTRICAL ENERGY GENERATED 168,290 569,280 168,290 l52,$)49 7,3l4,94o 6,834,587 42~"8~* :
39.7%**.
- 28.g -
. \\:& ~*.
., ':!!Lo,.. '..*.'.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
OJ (3)
{.'.\\IWH}
RE.-\\CTOR AVAILABILITY FACTOR (l).........
UNIT AVAILABILITY FACTOR (2)..**********
l 1NIT C.\\PACITY FACTOR (3).....*.......*.
UNIT FORCED QllTAGE RATE (4)........**..
l52,949 28.6~.
24.o o f3.~%
- lO.-%
24.0%
- 53.
0 SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------
UNITS IN TEST STATUS (PRIOR TO COM~1ERC1AL OPERATION) REPORT THE FOLLOWING:
REAC"fOR A\\'AILABILITY FACTOR l:NIT A \\'AILABILITY FACTOR UNIT CAPACITY FACTOR L"SIT FORCED Ol:TAGE RA TE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE
~~-~~~~~~~--XlOO HOURS IN REPORTING PERIOD NFT ELF.CTIUCAL POWFR GF~FRATED DATE LAST FORECAST DATE ACHIEVED MAX. DEl'ENDAHLE CAl'1\\CITY (M\\\\'e-NET) X HOURS IN REPORTINl; l'EKlOL>
FORCED OUTAGE HOURS
~-----~------~--x100 HOURS GENERATOR ON Ll!';E +FORCED OUTAGE HOUitS 1.16-D-l