Revised Appendix D of Monthly Operating Data for May 1976
ML18347A823
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/07/1976
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A823 (2)


Text

consumers Power company Route 1, Box 178, Covert, Michigan 49043 Re:

LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a revised copy of the Monthly Operating Data - Form Appendix D, for the Palisades Nuclear Plant for the month of May, 1976.

WE Adams General Engineer cc :

JGKeppler, NRC RBDeWitt RBSewell DeVanFarowe, Div. of Radiological Health Lansing, Mich.

os APPENDIX D CORRECTED OPERATING STATt:S UNIT Palisades DATE_5_-_7~-~7_6 ____

COMPLETED BYDIBollnow/6l6-764"-89i3 DOCKETNO ~5~0_-_2~5~5---~-

I.

REPORTING PERIOD:_~7_6_-0~5~-_0_l ________ THROUGH 76053l HOt:RS IN REPORTI:-:G PERIOD: ____ --4--'-'-'----------------------

2.
3.

CURRENTL Y A lJTHORIZED POWER LEVEL (MWth) 2200

.MAX. DEPENDABLE CAPACITY (MWe-NET) 720 LOWEST POWER LEVEL TO WHICH SPECIF-KALLY RESTRICTED (IF ANY) (M\\Ve-NET): _________

4.

REASO~S }:OR RESTRICTION (IF ANY):

THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL............*

6.

REACTOR RESERVE SHUTDOWN HOURS......*

7 *. *HOURS GDiJ:RATOR ON L!NE...*.... : :..**.

il.

trNJT RESERVE SHUTDOWN lIOURS *:... ::** ** : *..

9.

GROSS THER.'.\\IAL ENERGY GENERATED ('.\\1WH)..*.*....**.****...**

485.8 0

393.2 0.

YR TO DATE 485.8 0

393.2~

Q'.

cm.I ULA TIVE TO DATE l6,572.8 0

. l5,367.0 0

23,589,24o

. 11"'.

. 10.

eri )** ll.

GROSS ELECTRICAL ENERGY

-GENERATED (.\\IWH)..., : : :. ;*:;... ;.: *..**

NET ELECTRICAL ENERGY GENERATED 168,290 569,280 168,290 l52,$)49 7,3l4,94o 6,834,587 42~"8~* :

39.7%**.

  • 28.g -

. \\:& ~*.

., ':!!Lo,.. '..*.'.

12.
13.
14.
15.
16.
17.
18.

OJ (3)

{.'.\\IWH}

RE.-\\CTOR AVAILABILITY FACTOR (l).........

UNIT AVAILABILITY FACTOR (2)..**********

l 1NIT C.\\PACITY FACTOR (3).....*.......*.

UNIT FORCED QllTAGE RATE (4)........**..

l52,949 28.6~.

24.o o f3.~%

  • lO.-%

24.0%

53.

0 SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:-------------

UNITS IN TEST STATUS (PRIOR TO COM~1ERC1AL OPERATION) REPORT THE FOLLOWING:

REAC"fOR A\\'AILABILITY FACTOR l:NIT A \\'AILABILITY FACTOR UNIT CAPACITY FACTOR L"SIT FORCED Ol:TAGE RA TE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE

~~-~~~~~~~--XlOO HOURS IN REPORTING PERIOD NFT ELF.CTIUCAL POWFR GF~FRATED DATE LAST FORECAST DATE ACHIEVED MAX. DEl'ENDAHLE CAl'1\\CITY (M\\\\'e-NET) X HOURS IN REPORTINl; l'EKlOL>

FORCED OUTAGE HOURS


~-----~------~--x100 HOURS GENERATOR ON Ll!';E +FORCED OUTAGE HOUitS 1.16-D-l