consumers Power company Route 1, Box 178, Covert, Michigan 49043 Re: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a revised copy of the Monthly Operating Data - Form Appendix D, for the Palisades Nuclear Plant for the month of May, 1976.

WE Adams General Engineer cc : JGKeppler, NRC RBDeWitt RBSewell DeVanFarowe, Div. of Radiological Health Lansing, Mich.

APPENDIX D UNIT Palisades CORRECTED DATE_5_-_7~-~7_6_ _ _ __

COMPLETED BYDIBollnow/6l6-764"-89i3 DOCKETNO ~5~0_-_2~5~5---~-

OPERATING STATt:S I. REPORTING PERIOD:_~7_6_-0~5~-_0_l_ _ _ _ _ _ _ _ THROUGH 76053l HOt:RS IN REPORTI:-:G PERIOD: _ _ _ _--4--'-'-'----------------------

2. CURRENTL Y A lJTHORIZED POWER LEVEL (MWth) 2200 .MAX. DEPENDABLE CAPACITY (MWe-NET) 720
3. LOWEST POWER LEVEL TO WHICH SPECIF-KALLY RESTRICTED (IF ANY) (M\Ve-NET): _ _ _ _ _ _ _ _ __
4. REASO~S }:OR RESTRICTION (IF ANY): . . ,

THIS cm.I ULA TIVE REPORTING PERIOD YR TO DATE TO DATE

5. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . .
  • 485.8 485.8 l6,572.8
6. REACTOR RESERVE SHUTDOWN HOURS ......* 0 0 0
  • . 7 * . *HOURS GDiJ:RATOR ON L!NE . . . * . . . . : : ..**. 393.2 393.2~ . l5,367.0

., 0 . Q'. -* 0 il. trNJT RESERVE SHUTDOWN lIOURS *: ... ::**** : *. .

9. GROSS THER.'.\IAL ENERGY GENERATED ('.\1WH) . . * . * . . . . * * . * * * * . . . *
  • 569,280 23,589,24o

. GROSS ELECTRICAL ENERGY . . .

.11"' . . 10. -GENERATED (.\IWH) ... , : : : . ;*:; ... ;.: *..** 168,290 168,290 7,3l4,94o NET ELECTRICAL ENERGY GENERATED eri )**

\:& ~*. .*

ll.

{.'.\IWH} . . . . * . * . * * . . * * . . . * . * . . * * . * . * . l52,949 l52,$)49 6,834,587

':!!Lo,.. ' . .*.' .

12. RE.-\CTOR AVAILABILITY FACTOR (l) . . . . . . . . . f3.~% 42~"8~* :
  • lO.-% 39.7%**.
13. UNIT AVAILABILITY FACTOR (2) . . * * * * * * * * * *
14. l 1NIT C.\PACITY FACTOR (3) . . . . . * . . . . . . . * . 28.6~. *28.g -
15. UNIT FORCED QllTAGE RATE (4) . . . . . . . . * * . .

24.o o 24.0% 53. 0

16. SHUTDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - - -
18. UNITS IN TEST STATUS (PRIOR TO COM~1ERC1AL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL OJ REAC"fOR A\'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE l:NIT A \'AILABILITY FACTOR ~~-~~~~~~~--XlOO HOURS IN REPORTING PERIOD NFT ELF.CTIUCAL POWFR GF~FRATED (3) UNIT CAPACITY FACTOR MAX. DEl'ENDAHLE CAl'1\CITY (M\\'e-NET) X HOURS IN REPORTINl; l'EKlOL>

FORCED OUTAGE HOURS L"SIT FORCED Ol:TAGE RA TE -----~-----~------~--x100 HOURS GENERATOR ON Ll!';E +FORCED OUTAGE HOUitS 1.16-D-l