Monthly Operating Data for March 1976
ML18347A826
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/02/1976
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A826 (4)


Text

"'-*,

consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043

/~,\\'- ':~~:'l:( :

~

/.._*~

~ii~RQ April 2, 1976

.. f

,,*,;:~.~

1976. *:

~-.: :

t:.:

APR9

\\--.

'\\ \\ *.

I--,,,.;:.

\\ ~.*.

Mail Scctio~

  • ----~

USNuclear Regulatory Commiss\\~~**.

ood:et cicn<

Mail and Records Section

'**,~::f>*..

-., \\ \\..

  • I I I

~

"\\

i Washington, D. C., 20555

  • -...::.__ i:o l ; * *

--~ ~ **----** -

Re:

LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of March, 1976.

William E. Ada.ms General Engineer c.c.: JGKeppler, NRC RBDeWitt RBSewell 3585

~

-......i~------------------_... _

_,(~~~-...\\ __________________....... __...... --::. __ ---._. ----

c*1K+6zdbt'°M~*Cc07'bh*r9

".!ql[f r,*e tt't em*;

t!H rt*'

to r

j l

1 I

NO.

DATE 10 751220 l

SUMMARY

TYPE F*FORCED DURATIPN S*SCHEDULED * (HOURS) s 280.4 s*

2184 APPENDIX E UNIT SHUTDOWNS REPORT MONTH March 1976 METHOD OF

~HUTTING DOWN REASON (1)

THE REACTOR (2) c 3

c DOCKET NO. _,5"-0_.-_,25;...:;5 ____._,/

UNIT NAME *Palisades DATE 4~2-76 COMPLETED 13 Y _WE_A_d_am_s ___ _

COR R.ECTIVE ACTIONS/COMMENTS Item No. 1 is a*continuing refueling out.age noted as Item No. 10

'o..

. '\\

(1) REASON (2) METHOD.

A**EQUIPMENT 1-'AILURE'(EXPLAIN)

I-MANUAL B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E--Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTHATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

'J

  • 1*

fl

~,

-. -~- _

APPENDIX D UNIT _ _;;;P....:a:;;:l=-:1.::.:

0 S::.,:a=.;d::;,e:=.:s=----

DATE_~~~-=2~-~7~6 ___

616-764-891(3 COMPLETED BY __,_WE=A:~d=a=m=s=-----

DOCKET NO. ________ _

OPERA TING ST A TUS L

REPORTING PERIOD: ___

7._6_0~3,_0-=l=---------- THROUGH _..J.7-"'6""0'-'3'-'3""1~--------

HOURS IN REPORTl;:-.;G PERIOD: ___

.,L-.:.4_,4 _____________________

2.

CURRENTLY AUTHORIZED POWER LEVEL ('.\\1\\Vth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684

3.

LOWEST POWER LEVEL TO \\VH!CH SPECIFICALLY RESTR!1'4:U:D (IF ANY) (MWe-NET); __

.....-"<6_,3""'0 _____

4.

REASONS FOR RESTRICTION (IF ANY):

THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL........ * * *..

0 ___

REACTOR RESERVE SHUTDOWN HOURS 0 ___

HOURS GENERATOR ON LINE......... *.. *.

  • _ _,0"------

.UNJT RESERVE SHUTDOWN HOURS...........

_*.-oo_* ___ _

GROSSTHERMALENERGY.

GENERATED ('.\\!WH)............... * * *..

  • _....::0,__ __

GROSS ELECTRICAL ENERGY

-GENERATED ('.\\IWH)... :............****.

NET ELECTRICAL ENERGY GENERATED 0

0 CUMULATIVE YR TO DATE TO DATE 0

-l6z087 0

0 0

l4z973°8 0

0 0

23,019,960 0

7zl46.650 0

6,681,638

.,;/*

0

~--

~0.2%.-* -

{MWll)........*..........*.*.***.*.

REACTOR AVAILABILITY FACTOR (I).........

0 ll) 0 0

29.3~

0 5~.1~

UNIT AVAILABILITY FACTOR (2)....*....*..

l 1NIT CAPACITY FACTOR (3)...............

UNIT FORCED OUTAGE RATE (4).......*....

0 0

0 sm:TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF.EACH):

IF SHUT DOWN AT END OF REPORT PERIOD, ESTntATED DATE OF STARTUP: ___

.. _4_..

.....:1~9.o...*_-7~6 ____

UN)TS IN TEST STATUS (PRIOR TO COMMERCIAL OPERA TJON) REPORT THE FOLLOWING:

REACTOR A \\'AILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 DATE LAST FORECAST DATE ACHIEVED (2)

UNIT A \\'AILABJLITY FACTOR HOURS GENERATOR ON LINE


~~~--~x100 HOURS IN REPORTING PERIOD (3)

UNIT CAPACITY FACTOR NF.T ELECTRICAL POWFR GFNERATED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l't:l{IOU (4)

FORCED OUTAGE HOURS


~~---~-~-~---~x100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS l.JNIT FORCED OUTAGE RATE 1.16-D-l

~ -.

-~"':>'>I!'~.....,.-~~~

.. >;;a:." ""'I!-*:.. ::::-~-._µ"* '*'""-=-"*&~~~~~-*:-~*:TJ1*'i':-:~c-... ~:---~""'.""'!<.~~.,.~"""""~.-~="""".~*-F.~J~.~k~::O-.. :VJP,.. h;":"5U.*~..,.-~n- --

1 it APPENDIX C

~*

DOCKET NO. -~50_-_2~5~5-UNIT Palisades DATE 3-2-76 COMPLETED BY __

WE_A_d_am_s_

AVERAGE DAILY UNIT POWER LEVEL MONTH March 1276 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (l\\1We-net)

DAY (MWe-net) 1 0

17*

0 2

0 18 0

3 0

19 0

4 0

20.

0 5

0 21 0

6 0

22 0

7 0

23 0

8 0

24 O*.

9 0

25 0

10 0

26 0

11 0

27.

0 12 0

28 0

13 0

29 0

14 0

30 0

l5

- 0 31 0

16 0

DAILY UNIT POWER LEVEL FORI\\1 INSTRUCTIONS On this form, list the average daily unit power level in 1\\1\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependabk capacity for the nd ckctrical rating of the unit. there may be occasions when the daily average power level exceeds the I 001/~; line (or the restricted power level-line). In such cases, the

'\\ average daily unit power output sheet should be footnoted to explain the ap.parent anomaly.

1.16-C-l i..

.