consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 November 6, 1975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE:
License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of October 1975.
Kenneth D. Brienza Associate Engineer cc:
JGKeppler, NRC RBDeWitt RBSewell 12837
'n'
~
,~
_......... *...-:. ""ll?ti-~ --***-* "" *----------..---~--........,--
I
-°'
er. -
0 TYPE F*FORCED DURATION NO.
DATE S*SCHEDULED (HOURS) 9 751028 s
70.7 0
APPENDIX E UNIT SHUTDOWNS REPORT MONTH
- October 1975 METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
A 1
(1)
I 5QQ DOCKET NO. -------
UNIT NAME Pali'sades
. DATE __
1_1-_6_-_75 __ _
KDBrienzo COMPLETED UY-------
CORRECTIVE ACTIONS/COMMENTS Generator Ta.ken off-line to do repair work on main electrical generator
/
hydrogen. coolers
- REASON (2) METHOD A--EQUIPMENT FAILURE.(EXPLAIN)
I-MANUAL B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I
!* '. E(iULATORY RESTRICTION 3-AUTOMATIC*
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMlNlSTRATlVE G-Ol'ERA TIONAL ERROR (EXPLAIN)
H-OTHI::R (EXPLAIN)
SUMMARY
- The ~it-operated ~or the month of O~tober at
. Q~ the main e1ecti:ic0J. gOnerat~r 'Wdr<>.
70%* to 86% except for t~e. outage_ noted cooJ,.ers.
- I. I
... ~
j...
.1
~
e (0
.e APPENDIX C l~*~.o
\\
DOCKET NO.
50-255 UNIT Palisades DATE _l_l-_3_-_*7_5 __
COMPLETED BY -~KD~B=r=i-""en=z=-o;:.._
AVERAGE DAILY UNIT POWER LEVEL MONTH~~-O_c_t_ob_e_r~l_9_7_5~~-
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL.
DAY
(.f\\1We-nct)
DAY (MWe-net) 1 514 17*
448 2
519 18 446
//
518
/
448 3
19 516
~!ts 4
- 20.
5 516 21 445 6
511 22 442 505 441 7
23 8
502 24
. 436.
9 503 25 446.
509 444 10 26 50'7 445.
11
- 27.
12 506 28 380 13 499 29 0
14 473 30 0
15 472 31 0
16 445 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in iv1\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). In such cases, the c:** )\\ average C~aily unit power output sheet should be footnotCQ to explain the Up.parent anomaly.
\\e*.--.
L 1.16-C-l
~~~*~**
.. J*p:l... '!Mi... ~~~~~'!'f':'~;~~!ft~.,.~~~"~~~""~;r.t!~~~~o/r; --
- 1
- j.
- .e
((.***-"*
I APPENDIX D*
Palisades UNIT--------
DATE......,...._1_1~-6~--7_5 __
616-764-8913.
. COMPLETED BY KEBrienzo DOCKET N0. __
5_o_-_
2 _55 ___
OPERATING ST A n;s
. 1.
REPORTING PERIOD: __
7_5_l_O_O_l_* -------- THROUGH __
- 7_5_1_0_3_1 ________
HOURS IN REPORTl:-:G PERIOD: __
--"'7_2_0 _______________________
- 2.
CURRENTLY ACTHORIZED POWER LEVEL (~1\\Vth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684 3..
LOWEST POWER LEVEL TO WlllCII SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET):
6 30
.4.
REASOSS FOR RESTRICTION (IF AN.Y):
(I)
THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL..**..' *******
REACTOR RESERVE SHUTDOWN HOURS *.*****
. HOURS GENERATOR ON LINE.*.. * *.** ;.******
\\JNJT RESERVE SHUTDOWN HOURS. *..*..**** ;
GROSS THERMAL ENERGY GENERATED c:-.tWH).*..***..************
GROSS.ELEqRIC'AL ENERGY
-GENERA TED_(:-.!Wll)... : ***..*.*.*****.***
NET ELECTRICAL ENERGY GENERATED (MWll).*....*.***.***.*.**.********
RE:\\CTOR AVAILABILITY FACTOR (I)..****.**
UNIT A \\"AIL:\\BILITY FACTOR (2).****.******.
l1NIT C" AP.-\\C'ITY FACTOR (3) *.*..****.*****
l'NIT FORCED OllTAGE RATE (4).*.....**..*
,.r 0 674.3 0
1,135,152 345,330 319.192.
100%
90.5%
62.6%*
0 YR TO DATE 42666~2*
0 42469.1 0
72154~472 22119~330 1 ~948,227 64%
61~ 3%
39.0%
38.0%
CUMULATIVE TO DATE 14.'903. 4 0
132720.12 0
2122682032
. 6 2623 ~280
. 6,201,932 44.4%'
30~6%
26.1%
Slll1TDO\\\\'NS SC'llEUULED TO BEGlf:' INlNEXT 6 MONTHS (STATE TYPE, DATE,.J.ND DURATION OF EACH):
lJie_c_e_mb_e_r_l_'+.'
975 through March. 22., 1976 for refueling IF Slll'.T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE or STARTUP: ____________
l!NITS IN TEST '.)'f:\\ !'us(; RIOR TO cm.1:-.tERCIAL OPERATION) REPORT THE FOLLOWING:
l\\EAC'TOR A\\'AILABILITY FACTOR UNIT A \\'AILABILITY FACTOR INITl!\\L CRITICALITY INrTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOliRS GENERA TOR ON Ll~E
~--~~~---XlOO HOURS IN REPORTl:'\\G PERIOD DA TE LAST DA TE FORECAST ACHIEVED (3)
UNIT CAPACITY FACTOR NF.T ELF.C'TRIC'AL PO\\\\TR GF'.'/F.RATED MAX. Dl-.l'ENDABLI*: CAl':\\CIT\\' (MWc-NET) X HOURS IN RU'ORTIN<.; l'EKIOD D~IT FORCED Ol'TAGE RATE FORCED ot:TA(;E l!Ol:Rs
~-~-~--~---~--~-~--~---XlOO llOl.iRS GENERATOR ON Lli'E +FORCED Ol.iTAGE HOURS J.16-D*l
,,....*.