Monthly Operating Data for October 1975
ML18347A832
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 11/06/1975
From: Brienzo K
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A832 (4)


Text

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 November 6, 1975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE:

License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of October 1975.

Kenneth D. Brienza Associate Engineer cc:

JGKeppler, NRC RBDeWitt RBSewell 12837

'n'

~

,~

_......... *...-:. ""ll?ti-~ --***-* "" *----------..---~--........,--

I

-°'

er. -

0 TYPE F*FORCED DURATION NO.

DATE S*SCHEDULED (HOURS) 9 751028 s

70.7 0

APPENDIX E UNIT SHUTDOWNS REPORT MONTH

  • October 1975 METHOD OF

~HUTTING DOWN REASON (1)

THE REACTOR (2)

A 1

(1)

I 5QQ DOCKET NO. -------

UNIT NAME Pali'sades

. DATE __

1_1-_6_-_75 __ _

KDBrienzo COMPLETED UY-------

CORRECTIVE ACTIONS/COMMENTS Generator Ta.ken off-line to do repair work on main electrical generator

/

hydrogen. coolers

  • REASON (2) METHOD A--EQUIPMENT FAILURE.(EXPLAIN)

I-MANUAL B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I

!* '. E(iULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMlNlSTRATlVE G-Ol'ERA TIONAL ERROR (EXPLAIN)

H-OTHI::R (EXPLAIN)

SUMMARY

  • The ~it-operated ~or the month of O~tober at

. Q~ the main e1ecti:ic0J. gOnerat~r 'Wdr<>.

70%* to 86% except for t~e. outage_ noted cooJ,.ers.

  • I. I

... ~

j...

.1

~

e (0

.e APPENDIX C l~*~.o

\\

DOCKET NO.

50-255 UNIT Palisades DATE _l_l-_3_-_*7_5 __

COMPLETED BY -~KD~B=r=i-""en=z=-o;:.._

AVERAGE DAILY UNIT POWER LEVEL MONTH~~-O_c_t_ob_e_r~l_9_7_5~~-

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL.

DAY

(.f\\1We-nct)

DAY (MWe-net) 1 514 17*

448 2

519 18 446

//

518

/

448 3

19 516

~!ts 4

20.

5 516 21 445 6

511 22 442 505 441 7

23 8

502 24

. 436.

9 503 25 446.

509 444 10 26 50'7 445.

11

27.

12 506 28 380 13 499 29 0

14 473 30 0

15 472 31 0

16 445 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in iv1\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). In such cases, the c:** )\\ average C~aily unit power output sheet should be footnotCQ to explain the Up.parent anomaly.

\\e*.--.

L 1.16-C-l

~~~*~**

.. J*p:l... '!Mi... ~~~~~'!'f':'~;~~!ft~.,.~~~"~~~""~;r.t!~~~~o/r; --

  • 1
j.
  • .e

((.***-"*

I APPENDIX D*

Palisades UNIT--------

DATE......,...._1_1~-6~--7_5 __

616-764-8913.

. COMPLETED BY KEBrienzo DOCKET N0. __

5_o_-_

2 _55 ___

OPERATING ST A n;s

. 1.

REPORTING PERIOD: __

7_5_l_O_O_l_* -------- THROUGH __

  • 7_5_1_0_3_1 ________

HOURS IN REPORTl:-:G PERIOD: __

--"'7_2_0 _______________________

2.

CURRENTLY ACTHORIZED POWER LEVEL (~1\\Vth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684 3..

LOWEST POWER LEVEL TO WlllCII SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET):

6 30

.4.

REASOSS FOR RESTRICTION (IF AN.Y):

(I)

THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL..**..' *******

REACTOR RESERVE SHUTDOWN HOURS *.*****

. HOURS GENERATOR ON LINE.*.. * *.** ;.******

\\JNJT RESERVE SHUTDOWN HOURS. *..*..**** ;

GROSS THERMAL ENERGY GENERATED c:-.tWH).*..***..************

GROSS.ELEqRIC'AL ENERGY

-GENERA TED_(:-.!Wll)... : ***..*.*.*****.***

NET ELECTRICAL ENERGY GENERATED (MWll).*....*.***.***.*.**.********

RE:\\CTOR AVAILABILITY FACTOR (I)..****.**

UNIT A \\"AIL:\\BILITY FACTOR (2).****.******.

l1NIT C" AP.-\\C'ITY FACTOR (3) *.*..****.*****

l'NIT FORCED OllTAGE RATE (4).*.....**..*

,.r 0 674.3 0

1,135,152 345,330 319.192.

100%

90.5%

62.6%*

0 YR TO DATE 42666~2*

0 42469.1 0

72154~472 22119~330 1 ~948,227 64%

61~ 3%

39.0%

38.0%

CUMULATIVE TO DATE 14.'903. 4 0

132720.12 0

2122682032

. 6 2623 ~280

. 6,201,932 44.4%'

30~6%

26.1%

Slll1TDO\\\\'NS SC'llEUULED TO BEGlf:' INlNEXT 6 MONTHS (STATE TYPE, DATE,.J.ND DURATION OF EACH):

lJie_c_e_mb_e_r_l_'+.'

975 through March. 22., 1976 for refueling IF Slll'.T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE or STARTUP: ____________

l!NITS IN TEST '.)'f:\\ !'us(; RIOR TO cm.1:-.tERCIAL OPERATION) REPORT THE FOLLOWING:

l\\EAC'TOR A\\'AILABILITY FACTOR UNIT A \\'AILABILITY FACTOR INITl!\\L CRITICALITY INrTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOliRS GENERA TOR ON Ll~E


~--~~~---XlOO HOURS IN REPORTl:'\\G PERIOD DA TE LAST DA TE FORECAST ACHIEVED (3)

UNIT CAPACITY FACTOR NF.T ELF.C'TRIC'AL PO\\\\TR GF'.'/F.RATED MAX. Dl-.l'ENDABLI*: CAl':\\CIT\\' (MWc-NET) X HOURS IN RU'ORTIN<.; l'EKIOD D~IT FORCED Ol'TAGE RATE FORCED ot:TA(;E l!Ol:Rs

~-~-~--~---~--~-~--~---XlOO llOl.iRS GENERATOR ON Lli'E +FORCED Ol.iTAGE HOURS J.16-D*l

,,....*.