Monthly Operating Data for October 1975
ML18347A832
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/06/1975
From: Brienzo K
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A832 (4)


Text

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 November 6, 1975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Plant for the month of October 1975.

Kenneth D. Brienza Associate Engineer cc: JGKeppler, NRC RBDeWitt RBSewell 12837

~ ,~

_ .........*...-:.""ll?ti-~ --***-*""'*----------..---~--........,--

' -** 'n' I

I 0 . ... I 0 .

APPENDIX E 5QQ DOCKET NO. - - - - - - - .,

~

UNIT SHUTDOWNS UNIT NAME Pali'sades

. DATE __ 1_1-_6_-_75_ __

KDBrienzo COMPLETED U Y - - - - - - -

REPORT MONTH *October 1975 TYPE METHOD OF F*FORCED DURATION ~HUTTING DOWN NO. DATE S*SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 9 751028 s 70.7 A 1 Generator Ta.ken off-line to do repair work on main electrical . generator /

.. hydrogen. coolers *

-°'er.

(1) REASON (2) METHOD A--EQUIPMENT FAILURE.(EXPLAIN) I-MANUAL B* MAINT. OR TEST 2-MANUAL C- REFUELING SCRAM I I  !* '. E(iULATORY RESTRICTION 3-AUTOMATIC*

' E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION

... ., F-ADMlNlSTRATlVE G-Ol'ERA TIONAL ERROR

. (EXPLAIN)

H-OTHI::R (EXPLAIN)

SUMMARY

. Q~ the main e1ecti:ic0J. gOnerat~r 'Wdr<>.

  • The ~it-operated ~or the month of O~tober at 70%* to 86% except for t~e. outage_ noted cooJ,.ers.
  • j ... .*

.1 ~ e

.e APPENDIX C (0 DOCKET NO.

UNIT 50-255 Palisades DATE _l_l-_3_-_*7_5__

COMPLETED BY -~KD~B=r=i-""en=z=-o;:.._

AVERAGE DAILY UNIT POWER LEVEL MONTH~~-O_c_t_ob_e_r~l_9_7_5~~-

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL.

DAY (.f\1We-nct) DAY (MWe-net) 1 514 17* 448 2 519 18 446

//

518 /

448 3 19 516 4 20. ~!ts 5 516 21 445 511 442 6 22 l~*~.o

\ .. 7 505 23 441 8

502 24 . 436.

503 446.

9 25 509 444 . '

10 26

' 50'7 445.

11 27.

12 506 28 380 13 499 29 0 14 473 30 0 472 0 15 31 16 445 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in iv1\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily

', average power level exceeds the 100% line (or the restricted power level* line). In such cases, the c:**)\ average C~aily unit power output sheet should be footnotCQ to explain the Up.parent anomaly.

\e* .- .

L .. 1.16-C-l

~~~*~**.. J*p:l...'!Mi...~~~~~'!'f':'~;~~!ft~.,.~~~"~~~""~;r.t!~~~~o/r;

  • 1

j.

  • .e APPENDIX D*

Palisades UNIT--------

((.***-"*

I DATE......,...._1_1~-6~--7_5_ __

616-764-8913 .

. COMPLETED BY KEBrienzo

. " DOCKET N0. _ _5 _o_-_2 _55_ _ __ .*

OPERATING ST A n;s

. 1. REPORTING PERIOD: _ _7_5_l_O_O_l_*- - - - - - - - THROUGH _ _

  • 7_5_1_0_3_1_ _ _ _ _ _ _ __

HOURS IN REPORTl:-:G PERIOD: _ _--"'7_2_0_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2. CURRENTLY ACTHORIZED POWER LEVEL (~1\Vth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684 3.. LOWEST POWER LEVEL TO WlllCII SPECIFICALLY RESTRICTED (IF ANY) (MWe*NET): 6 30

.4. REASOSS FOR RESTRICTION (IF AN.Y):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE 42666~2* 14 .'903. 4 HOURS REACTOR WAS CRITICAL. .**. .' *******

REACTOR RESERVE SHUTDOWN HOURS *.***** ,.r 0 0 0

. HOURS GENERATOR ON LINE.*.. **.** ; .****** 674.3 42469.1 132720.12

\JNJT RESERVE SHUTDOWN HOURS . *..*..**** ; 0 0 0 GROSS THERMAL ENERGY GENERATED c:-.tWH) .*..***..************ 1,135,152 72154~472 2122682032 GROSS.ELEqRIC'AL ENERGY

-GENERA TED_(:-.!Wll) ... : ***..*.*.*****.*** 345,330 22119~330 . 6 2623 ~280 NET ELECTRICAL ENERGY GENERATED (MWll) . * . . . . * . * * * . * * * . * . * * . * * * * * * *

  • 319 .192. 1 ~948 ,227 . 6,201 ,932 RE:\CTOR AVAILABILITY FACTOR (I) . . * * * * . *
  • 100% 64% 44.4%'

UNIT A \"AIL:\BILITY FACTOR (2) . * * * * . * * * * * * . 90.5% *.. 61~ 3%

l1NIT C" AP.-\C'ITY FACTOR (3) *.*..****.***** 62.6%* 39.0% 30~6%

l'NIT FORCED OllTAGE RATE (4) . * . . . . . * * . .

  • 0 38.0% 26.1%

Slll1TDO\\'NS SC'llEUULED TO BEGlf:' INlNEXT 6 MONTHS (STATE TYPE, DATE,.J.ND DURATION OF EACH):

_ _ _ _ _ _ _lJie_c_e_mb_e_r_l_'+.'

_ 975 through March. 22., 1976 for refueling IF Slll'.T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE or STARTUP: _ _ _ _ _ _ _ _ _ _ _ __

l!NITS IN TEST '.)'f:\ !'us(; RIOR TO cm.1:-.tERCIAL OPERATION) REPORT THE FOLLOWING:

DA TE LAST DA TE FORECAST ACHIEVED INITl!\L CRITICALITY INrTIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) l\EAC'TOR A\'AILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOliRS GENERA TOR ON Ll~E UNIT A \'AILABILITY FACTOR ----~--~~~---XlOO HOURS IN REPORTl:'\G PERIOD NF.T ELF.C'TRIC'AL PO\\TR GF'.'/F.RATED (3) UNIT CAPACITY FACTOR MAX. Dl-.l'ENDABLI*: CAl':\CIT\' (MWc-NET) X HOURS IN RU'ORTIN<.; l'EKIOD FORCED ot:TA(;E l!Ol:Rs D~IT FORCED Ol'TAGE RATE ~-~-~--~---~--~-~--~---XlOO llOl.iRS GENERATOR ON Lli'E +FORCED Ol.iTAGE HOURS J.16-D*l