MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Operating Report
MONTHYEARPNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-035, Report of Changes, Tests and Experiments and Summary of Commitment Changes2019-10-0909 October 2019 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML0710902472007-04-11011 April 2007 Generator Tube Integrity Assessment from the 2006 Refueling Outage ML0428804722004-10-0707 October 2004 Core Operating Limits Report- Revision 13 ML0424001062004-08-24024 August 2004 Core Operating Limits Report - Revision 12 ML0411904322004-04-21021 April 2004 2003 Non-Radiological Environmental Operating Report ML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18353B4751975-08-29029 August 1975 Semiannual Report of Operations, Number 9, for Period of January 1 Through June 30, 1975 2022-03-24
[Table view] Category:Monthly
MONTHYEARML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18347A8351975-08-0707 August 1975 Monthly Operating Data for July 1975 ML18346A2041975-07-24024 July 1975 April & May 1975 Effluent Reports, Required by Interim Special Tech Spec of Provisional Operating License ML18347A8361975-07-0202 July 1975 Monthly Operating Data for June 1975 ML18347A8371975-06-0303 June 1975 Monthly Operating Data for May 1975 ML18347A8391975-05-0202 May 1975 Monthly Operating Data for April 1975 ML18347A7781975-04-24024 April 1975 Steam Generator Flushing Report No. 4, Covering Period March 6, 1975 Through March 27, 1975 ML18347A8401975-04-0101 April 1975 Monthly Operating Data for March 1975 ML18347A7791975-03-26026 March 1975 Corrected Steam Generator Flushing Report No 3. Typographical Error in Total Pounds of Phosphate for B Sg. It Should Have Been 299 Not 229 1978-09-01
[Table view] |
Text
consumers
Power company U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
Sincerely, James A. Meineke JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell
I .~
- __,~ APPp.JDIX C (0 DOCKET NO.
UNIT 50-255.
Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 AVERA GE DAILY PO\\iER LEVEL AVERAGE DAILY POWER LEVEL.
(.MWe-net) DAY (MWe-nct)
DAY 1 0 17* 550 2 0 18 /./
577
/
3 4* 19 231 4 117. . 20. 268 5 162 21 216 6 131 22 560 c~* .0
- ._._; 7 261 23 121 8 350 24 501. ';.
9 388 25 266 10 446 26 531 11 389 27. 431 461 28 430 12 13 518 29 482 14 361 30 503 t5 . 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
- These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum
(.o dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly . . . . . .
- L-..~.--..,,~**~ " ~~~-~~¥<+~-*---~,n ~ ' '!
APPENDIX D*
UNIT _P_a_.:_1_J_ .. s_a_cl_e_s_ __
DATE lfJB.y 2, 1975 616-*764..:8913*
. COMPLETED BY D.Bollnow .
DOCKET N0. __5_0_-_2_5_5_ _ __
OPERATiNG ST ATUS I. REPORTING PERIOD: . 750401 THROUGH _ _7.J...,,5"-'0::...4..:....~""-'0::____ _ _ _ _ __
HOURS IN REPORTl'.'\G PERIOD: _ _ _7'-l__,9'-----------.,--------------,7'7"1""r--
- 2. CURRENTLY AUTHORIZED POWER.LEVEL ('.\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!*_ _
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):_--06:...3=0'- 1
---~---
- 4. REASONS FOR RESTRICTION (IF ANY): Power Restricted to 2100 .MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c.TE.o.;.,;...'_ _ _ _ T...:O._D_A_T_E_
- 5. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . . . 709.5 739.8 lG,976.7
- 6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . .
,. 0 0 0
- 7. HOURS GENERATOR ON LINE.* . . . . . . . . . . . * * . 657.8 657.8 9.978.9
- 8. lTNJT RESER VE Sil UTDOWN HOURS . . . . . . . . * *
- 9. . GROSS THER'.\1AL ENERGY GENERATED ('.\1WH) . * . * . . * * * * * . * * * * * * * *
- 967;.872 . 967,872 15,081,432 IO.. GROSS ELECTRICAL ENERGY
( *. .
11.
-GENERATED ('.\l\VH) . . . . . . . . . . . . . . . . . . . . .
NET ELECTRICAL ENERGY GENERATED (MWH) ..*.*...***..*..*.*.***.**.*.
291,04o 266,769 291,04o 266,769 4,795,290 4,520,474
- -~:**** 12. RL\CTOR AVAILABILITY FACTOR (l) . . . . - . . . . 98.7% 25. 7% 37 ..6%* .
- 13. UNIT A \'AILABILITY FACTOR (2) . . * * . . * . . * .
- 14. l NIT CAPACITY FACTOR (3) . . . . . . . . . . . . * . .
1 54.2% 13.5% '26.2% -
IS. UNIT FORCED OllTAGE RATE (4) . . . . . . * * . * *
- 16. 1 S!ll TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __
IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) REACTOR A\'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE t:NIT AVAILABILITY FACTOR -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD f~~
FORCED Ol:TAGE HOURS
. l L
(4) t:NIT FORCEDOL'TAGE RATE -~-~---------XlOO
(~\.~.>3
. ~~
. HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
).16*D*l . . .
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-
~.--- I t.,,.\ e:. .J~*
J. 0 '-k'"~"""""-"'"'""""...;"'"'";,.~. . . .,,...,. ___.,. . . . . . ._,. . .,. . . . . . . .-.. .~..............,.,~....,. . .,,. . . . *A*P(l-'pi~*-*----*---...- - -....*->=-*"""*,_.....,
- .*_..._.-**-~-0-C-.K~E....~........N-m-.- ~ 5~0~ *2=0*5:;. .: 5'-*-* _-_~.......<.->'\~*I
~ ~ f j UNIT SHUTDOWNS UNIT NAME Palisades l
!' COMPLETED BY *n.Bollnow t
~
REPORT MONTH April 1975 r NO. DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS) REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR (2) CORRECTIVg ACTIONS/COMMENTS etI t
[
1 3 . 741104 7504o6 F
F 3662.1 2.6 B
A 1
1 Completion of Steam Gen. Repair/Inspection Off-Line to Repair Leaking F.W.Heater Valve Ir r*
[
- .... 2 750422 F 14.l A 3 Trip due to E.H. oil Line failure on r Turbine control system (1) REASON A*-EQUIPMENT FAILURE:(EXPLAIN)
B- MAlNT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND (2) METHOD 1-MANUAL
- 2-MANUAL SCRAM 3-AUTOMATIC*
SCRAM
.. l,.
f,.
LICENSE EXAMINATION ~
. . F-ADMINISTRATIVE G-OPERATIONAL ERROR t,, .
{EXPLAIN)
H-OTHER (EXPLAIN) ..
ri:
SUMMARY
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out I[
of service which is restrictive* on power..