U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*
JAM:db cc:
J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke
- .I
. -. :__,~
APPp.JDIX C I. ~
(0 DOCKET NO.
50-255.
UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.
DAY
(.MWe-net)
DAY (MWe-nct) 1 0
17*
550 2
0 18 577
/./
/
3 4*
19 231 4
117.
. 20.
268 5
162 21 216 6
131 22 560 0
c~*.. *._._;
7 261 23 121 8
350 24 501.
9 388 25 266 10 446 26 531 11 389
- 27.
431 12 461 28 430 13 518 29 482 14 361 30 503 t5
. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the
(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......
- L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n
~
- ,.--.o
(
- -~:****
APPENDIX D*
UNIT _P_a_.:_1_J_
.. s_a_cl_e_s __ _
DATE lfJB.y 2, 1975 616-*764..:8913*
. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _
OPERATiNG ST A TUS I.
REPORTING PERIOD:
. 750401 THROUGH __
7.J...,,5"-'0::...4..:....~""-'0::___ ______ _
HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
- 2.
CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __
- 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-
1 ---~---
- 4.
REASONS FOR RESTRICTION (IF ANY):
Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____
T...:O._D_A_T_E_
- 5.
HOURS REACTOR WAS CRITICAL.............
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE.*...........**.
- 8.
lTNJT RESER VE Sil UTDOWN HOURS........***
- 9.
. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********
IO..
GROSS ELECTRICAL ENERGY
- 11.
- 12.
- 13.
- 14.
-GENERATED ('.\\l\\VH).....................
NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.
RL\\CTOR AVAILABILITY FACTOR (l).... -....
UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*
l 1NIT CAPACITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)......**.***
709.5
,. 0 657.8 0
967;.872 291,04o 266,769 98.7%
91.5%
54.2%
8.6°/o 739.8 0
657.8 0
. 967,872 291,04o 266,769
- 25. 7%
22.8%
13.5%
77.'?}
lG,976.7 0
9.978.9 0
15,081,432 4,795,290 4,520,474 37.. 6%*.
34.2~.*
'26.2% -
63.2°/o IS.
- 16.
S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
IS.
UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
(I)
REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)
UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE
~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD
. l f~~ (4) t:NIT FORCEDOL'TAGE RATE
(~\\.~.>3.
FORCED Ol:TAGE HOURS
-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
.., ~~ L
).16*D*l
_.:~-*=-~~~7~*~-~~~-=~-~~~-~-
~.---
I t.,,.\\
e :.
.J~*
J.
0 '-k'"~"""""-"'"'""""
... ;"'"'";,,~............,,..., ___.,................. _,....,
~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E
.... ~
N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~
....... <.->'\\~*I
~
~
f j
UNIT SHUTDOWNS UNIT NAME Palisades l
- 1.*
I
- DATE 5-2-75 l
COMPLETED BY
- n.Bollnow t
REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVg ACTIONS/COMMENTS 3
. 741104 F
3662.1 B
1 Completion of Steam Gen. Repair/Inspection 1
7504o6 F
2.6 A
1 Off-Line to Repair Leaking F.W.Heater Valve 2
750422 F
14.l A
3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR
{EXPLAIN)
H-OTHER (EXPLAIN)
SUMMARY
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..