Monthly Operating Data for January 1977
ML18347A811
Person / Time
Site: Palisades 
Issue date: 02/07/1977
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A811 (4)


Text

.. ~

consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043

\\R\\egulatory Docket File February 7, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:

LICENSE REPORT OF MONTHLY DPR-20,

.Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of January 1977.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt RB Sewell RLRosenfeld DEVanFarowe, Div. of Radiological Health Lansing, Mich.

Document Control

l423 r.:..*

")

(

.. I APPENDIX C

~.

DOCKET NO. __

5_0-_2_5_5 __

UNIT __

P_a_l_i_sa_d_e_s_

DA TE __

2_-_7-_7_7 __ _

COMPLETED BY __

D_I_Bo_l_l_n_o_w_

AVERAGE.DAILY UNIT POWER LEVEL MONTH January 1977

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY

(.MWe~net) 1 664 17*

359 2

667 18 245 3

669 19 606

.4 673 20 657 5

669 21

. 648 6

649 22 659 7

145 23 661 8

430 24

. 6§6 9

522 25 668 10 637 26 662 11 569

27.

656 173 646 12 28 628 638 13 29 657 307 14 30 1!i

. 658 31 317" 647 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole meg:.iwatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum.

dependable capacity for the net e!.:ctric::il rating of the unit. there may b~ occasions when the daily

  • average power level exceeds the I 00% line (or the n:strictcd power level* line). In such cases. the

_)average daily unit power o:.itput shed should be footnokd to cxpbin the ap-parcnt anomaly.

1 1.IKI

~;

~-~--...~--:

.. ~:~;:.-=---~-~~--~---"I'..-:

...........,..,,.........,,.,...,......... ~~*-.'""**--.. ""'* --~.*

~-

.C.-. ***~.*:?";"

APPENDIX D UNIT _P_a_l_i_s_a_d_e._s __ ~

DATE___,F~e~b~.'-=""7rl,'-"1~9~7~7--

616-764=8913 CO'.'tlPLETE!:l BY __.D.._I.... B~o.....-.1.._l n....,....ci_..w __ _

DOCKET NO.

50-255


~

OPERATING STATCS

1.

REPORTING PERIOD: ___ 7,_7,_0=1=-0=1=---------- THROUGH __

7._7.._,0.._l.._3.,..1..__ ________ _

HOt;RS IN REPORTl:-:G PERIOD: ___

7.._4_,_,_4 ________________________ _

.2.

CURRENTLY ACTHORIZED POWER LEVEL (!\\1Wth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET}

635

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ______ ~----

4.

REASO~S FOR RESTRICTION (IF ANY):

CW.!ULATIVE THIS REPORTING PERIOD YR TO DATE TO DATE S.

HOURS REACTOR WAS CRITICAL...*.....*...

730

6.

REACTOR RESERVE SHUTDOWN HOURS..***..

7.

HOURS GENERA TOR ON LINE...*.**.**.****

720.6

8.

lJNJT RESER\\"E SHUTDOWN HOURS.....*.***.

. 9.

GROSS THER'.'t!AL ENERGY.

GENERATED ('.'tiWH) *.*****..*.***.**.*. ".

.l.d.26,488 IO.

GROSS ELECTRICAL ENERGY

11.

-GENERATED ('.'tl\\YH) *** : *****************

NET ELECTRICAL ENERGY GENERA TED

(!\\tWH) ***********.*****************

RL\\CTOR AVAILABILITY FACTOR (I)....*....

UNIT AVAILABILITY FACTOR (2).**.*.******

l'NITCAPACITY FACTOR (3) *...*..*....*..

UNIT FORCED OUTAGE RATE (4) *.....***...

445,510 418,883.

. 98.1%

96. 9%.

88.7%

3.1%

730 2*2 !000. 9 720.6 282544.8 1,426,488 34,109,472 445 2 510

  • 10 2 630 2 710 418,883 9,947,562

. 98.1%

49.3.%.

96.9%

~6-1%-

88 7%

j5.8%

3.1%

47.3%.

12.
13.
14.
15.
16.

SHl'TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.
18.

(l)

IF Sltt:T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP=------------~

UNITS IN TEST ST.:\\ TUS (PRIOR TO Cm.l:.1ERCIAL OPERATION) REPORT THE FOLLOWING:

REACTOR A \\'AILABILITY FACTOR t=NIT AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON Ll:O-:E


XlOO HOURS IN REPORTl:-:G PERIOD DATE LAST FORECAST DATE ACHIEVED l

(3) l'NIT (',\\P,\\CITY FACTOR t~

H>

C'ITFORCEDOl'TAGERATE NFT FLFCTRIC\\L POWFR GF~ERATED MAX. DEPENDABLE CAPACITY (MWc-NET) X HOURS IN REPORTING l'ERIOU

  • J 1
J FORCED OUTAGE HOURS

~x100 HOURS GENERATOR ON LI;-;E +FORCED OliTAGE HOURS 1.16-D-l

_,..,.~....__....,~..,_.....-<_..,_,~---..,,.._'"""",...,._.-..,......-~.-.. ~_....,...,.._.,..._ -V"!'.,.,.*"+

..... -...,-.. *=**--""'.l'"'<<,_.u~+,;,....-...,...,,.P_,...,.. ~*_-::>,.,.,_,_,_

.......--......,.,.-..... 1--.0-.....,.............. _"'__.'" ""'* -..,.:*.*..,......-. "t:.C..,.,. *""'°*.,..,..,..,.,,_,...,....,_.~.,.

\\

.. ~-~,....._

  • -*,:__.:...__.~-*.

'*" t

/T"'\\}

~

.(:_)

  • , *... [

APPENDIX E DOCKET NO.

. 50-255 i * ~ r UNIT SHUTDOWNS UNIT NAME Palisades

\\ *

[*

I DATE 2-7-77 COMPLETED BY DIBollnow I'

REPORT MONTH _J_a:n_u_a_r-=-y_l 9;...;7....:.7 __

TYPE METHOD OF F*FORCED DURATIPN SHUTTING DOWN NO.

DATE S*SCHEDULED * (HOU.RS)

REASON (1)

THE REACTOR (2)

COR R.ECTIVE ACTIONS/COMMENTS 1

770111 F

10.7 A

2 Cooling Tower Pump Trip 2

770117

. F 7.5 A

2 Heater Drain Pump Trip/

3 770117 F

5.2 H

3 Feedwater Pump Trip

\\

\\

r (1) REASON (2) METHOD.

A**EQUIPMENT FAILURE'(EXPLAIN)

I-MANUAL

~.I.

B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATI YE G--Ol'ERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

Plant operated at a nominal 100% power, ~ooling tower."icing continues to restrict maximum electrical generation.

t*