Corrected Steam Generator Flushing Report No 3. Typographical Error in Total Pounds of Phosphate for B Sg. It Should Have Been 299 Not 229
ML18347A779
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 03/26/1975
From: Sewell R
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A779 (2)


Text

'(**~*-**......,.

le

'-c ---;, __..

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201

  • Area Code 517 788-0550 Division of Reactor Licensing US Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

March 26, 1975 Re:

Docket 50-255 License DPR-20 Palisades Plant Flushing Report Attached is a corrected Flushing Report No 3 for the Palisades Plant steam generators.

There was a typographical error in the total pounds of phosphate for "B" SG. It should have been 299 not 229.

WGF/smm CC:

JGKeppler, USNRC Yours very truly, Ralph B. Sewell Nuclear Licensing Administrator

FLUSHING.REPORT NO 3 Flushing Report No 3 covers the period from February 3, 1975 through March. 6, 1975. At the* beginni.ng of this period, the SG were in a wet lay-up condition.

On February 24, 1975, the* "A" SG was drained and refilled to wet lay-up condition.

The phosphate concentration during this di-ain was 2lppm.

After refilling, the' phosphate. concentration was determined to be approximately 6 ppm.

I is try:

On March 6, 1975, the SG were in wet lay-up with the followi.ng chem-*

pH Conductivity

  • Phosphate**

Hydrazine *

  • "A" *sG 9.95 70.

23..

145.

Micromho/Cm ppm ppm "B" SG 9.87 52 Micromho/CJ;n 13.2,ppm 220..

ppm The totals (as of March 6, 1975) of phosphate removed from the steam

. generators are as follows :.

"B" SG lB Phosphate 412 299 1 3/26/15