Monthly Operating Data for February 1977
ML18347A809
Person / Time
Site: Palisades 
Issue date: 03/01/1977
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A809 (4)


Text

{{#Wiki_filter:.~-* consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 March 1, 1977 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 POCKETED. !.l~t!RQ Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen: -::~..... *~ Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of February 1977. William E. Adams General Engineer cc: JGKeppler, NRC RBDeWitt RB Sewell RLRosenfeld DEVanFarowe, Div. of Radiological Health Lansing, Mich. Document Control . '2318

tl l APPENDIX C

  • DOCKET NO.

. 50-255

  • UNIT. Palisades DATE 3-l-77 COMPLETED BY DIBol 1 now AVERAGE.DAILY UNIT POWER LEVEL MONTH February 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL.

DAY {MWe-net) DAY (MWe-net) 1 445 17* 666 2 643 18 6ZQ 3 661 19 662 .4 661 20 670 5 655 21 666 6 665 22 671 7 664 23 666 8 664 24

  • 62a.

9 639 25

  • 662 10 318.

26 6Ui 11 665

27.

670 12 670 28 626 13 671 29 14 . 670 30 15 6'68 31 16 670 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in l\\tWe-net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that by using maximum. dependable capacity for the net ckctric::il rating of the unit. there may be occ~1sions when the daily average power level exceeds the I 00% line (or the restricted power level-line). In such cases. the -) aver::igc daily unit power output sheet should be footnoted to expbinthe app::ircnt anomaly. l.16-C-l --..... ------~---~-=-.. ~-.:-"'-*..... --~--...- ---,-~-~,-~.,.....,.,....,.,.,..--.... -~. *}*== #"" -"')"'. ... s; >. ..a.~jc-.i *--- A!Jb:;::--~~

~~.-.' .>*' "*cx ur* *utvrt 'H'tt e ** **. tn'

  • --:~ l

\\ TYPE F*FORCED DURATIPN NO. DATE S*SCHEDULED (HOU.RS) None

SUMMARY

APPENDIX E UNIT SHUTDOWNS REPORT MONTH _ February 1977 METHOD OF SHUTTING DOWN REASON (1) THE REACTOR (2) '\\ \\ DOCKET NO.--=:=.....:~---,..*~ UNIT NAME* __ P_a_l...,.*i_s_ad_e_s __ DATE __ 3_-._1-_7_7 __ _ COMPLETED 13 Y _D_I_B_o_ll_n_o_w __ CORR.ECTIVE ACTIONS/COMMENTS (1) REASON (2) METHOD. A**EQUIPMENT FAILURE'(EXPLAIN) I-MANUAL B* MAINT. OR TEST 2-MANUAL C-* REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-*Ol'ERATOR TRAINING AND SCl~AM LICENSE EXAMINATION F-ADMINISTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN) H-OTHER (EXPLAIN)

  • ~

i . f j I \\ I .j

I APPEl\\JDlX D UNIT _P~a=l=i=s=a=d=e=s~-- DATE ___ 3-_1-_7_7_~-- 616-764-8913 CO'.\\IPLETED By -DH+-lBttiOl"l-l+-tlr-n-ron-wr.r---- OPERATING STATCS

l.

REPORTING PERIOD: ___ 7_7_0_2_0_1 _________ THROUGH --*~7~7~0=2=2=8--------~ HOCRS !NREPORTI:-:G PERIOD: 672


~

2.

CURRENTLY ACH!ORIZED POWER LEVEL (:\\1Wth) 2200 MAX. DEPENDABLE CAPACITY (MWe-NET)

  • 635
3.

. LOWEST POWER LEVEL TO W!ilCH SPECIFICALLY RE.STR!CTED (lF j\\NY) (MWe-NET): __________ ~

4.

REASO::\\S FOR RESTRICTION (!F ANY): THIS REPORTING PERIOD

5.

HOURS REACTOR WAS CRITICAL............. 672

6.

REACTOR RESERVE SHUTDOWN HOURS...... -

7.

. HOURS GENERA TOR ON Llt'-:E..... *.... -.* -.* 672

8.

°LINJT RESERVE SHUTDOWN HOURS.......*. -.

9.

GROSS THER'.\\fAL ENERGY GEl'iER:\\TED('.\\IWH)...*......,.......... 1,428,888 IO. GROSS ELECTRICAL ENERGY ,CENERATED ('.\\IWH)... :... ~............. -L_458, 990

11.

NET ELECTRICAL El':ERGY GENERATED ('.\\IWll) RL\\CTORAVr\\lLABILITYF:\\CTOR(I).:....... llNJT AVAILABILITY FACTOR (2)............ l 1NIT C..\\P.-\\ClTY !'ACTOR (3)........ ~....... l!NiT FORCED OUTAGE RATE (4)..... *....... 433,388 .1QQ% 100% _lil3.9% 0% YR TO DATE 1402 1392.6 ~855' 376 904,500 -S-52,280* 99% 98'3% 96.4%

1. 7%

. n;:.1uu.TIVE TO DATE 2'2,672.9 21,216 8 35,538,360 11 '089' 700_ 1~.5-9* -.:_..5..0...J..L.* liq.9L __:._.3.6.....8.L -46.5%

12.
13.
14.
15.
16.

SHL;TDOWl':S SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DA TE, A ND DURATION OF EACH):

17.

IF SHUT DOWN.-\\TEND OF REPORT PERIOD, ESTL\\!ATED DATE OF STARTUP: _____________ _

18.
  • liNITS IN TEST ST.-\\TlJS (PRIOR TO CO:>l:\\IERCIALOPERATION) REPORT THE FOLLOWING:
  • Reflects a correction of 9 for Jan. 1977, (1 l REACfOR A \\'AIL\\BIL!TY FACTOR (2)
  • L=N!T A VA!LAB!LITY FACTOR (3)

L;:-ffr (',\\P,\\ClTY FA Cf OR (-l) t::-.;JT FORCED Ol'TAGI'. RATE INITIAL CRITICALITY

  • . INITIAL ELECTRICAL POWER GE!"ERAT!ON cmi:-.ifRCIA.L OPERATION HOURS REACfOR WAS CR!TIC\\L HOURS IN REPORTI:-<G PERIOD HOURS GENERATOi~ o:--: Ll:\\E HOt;RS 1:-l REPORTl~G PERIOD x 100 x 100 NET Fl.ECTlUC.\\L l'O\\\\'FR GF~Fl{ATF.D DATE LAST

. FORECAST. DATE ACHIEVED MAX. Dl-.l'END.\\f;LI-. l'Al':\\CITY l~l\\\\".:-NET) X HOURS IN RLl'ORTINl; l'ERIUD FORCED O~T*\\CF HOU'.S HO t_; J-: s GE~ l R.-\\ 1-T-,*,-, ~-l-. !_:\\_E_+_!-.0-F-{C--r-:_ D_O_U_T_.-\\_G_E_t_! l-_)_U_R_S-x 1 00 1.16-D-l

-.-}}