consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 4, 1978 USNuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Re:

LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of December 1977.

William E. Adams General Engineer cc:

JGKeppler, NRC RBDeWitt DABixel CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich.

AK.ozlowski, Mich. Dept. of Labor RCallen, Mich. Pub. Service Comm., Lansing, MI.

Document Control - 950-22.35.10 (2 copies)

/

MONTH December 1977 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-255 PALISADES 1-4-78 DIBollnow 616-764-8913 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 718 723 17 2

-726 18 712 727 19 724 3

724 725 4

20 5

733 21 714 713 719 6

22 713 725 7

. 23 8

714 24 719 706 714 9

25 714 708 IO 26 I I 8

27 668 132 666 12 28 13 475 29 681 14 671 30 658 718 667 15 31 718 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Competo the nearest whole megawatt.

. (9/77)

OPERATING DATA REPORT OPERATING STATUS.

I. Unit Name:

PALISADES Notes

. 2. ReportmgPeriod:

12-1-77 to 12-31-77

3. Licensed Thermal Power (MWt):

2530

4. Nameplate Rating (Gross MWe):

811. 7

5. Design Electrical Rating (Net MWe):
  • 805
6. Maximum Dependable Capacity (Gross MWe):. : : g; 7, M~imum Dependable Capacity (Net MWe): * -------

DOCKET NO.

50-255 DATE 1-4-78 COMPLETED BY DIBollno.w TELEPHONE 616-764-8913

)*

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:*~

. J*-

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any: _____

.. -----------=---------:-------------:__ __ _;;___

*
  • 11. Hours In Reporting Period i2. Numbe~ Of Hours Reactor Was Criti~ -*. *.
13. Reactor Reserve Shutdown Hours
  • 14. Hours Generator On-Line

.;* 15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH).
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
. This Month 744*

716.8 708.8 1,703,640 518,310 490,350 95.3%

95.3%

103.8%

81.9%

4.7%

Yr.-to-Date 8,760 8,128.5 8;008 17,338',680 5,401,410 5,084,688' 91.4%

91.4%

. 91.4%

72.1%

5.7%

Cµmitlative..

5.2., 911..

29,399.4 27,"832. 2*

5.0' 021, 664 15,586,610 14;6i3,367

. 52.6%

52.6%

. 43; 5%

34.3%

40.5%

,_ -'~

.. -~ - ~.~ ~*--.

_24. Shutdowns Scheduled Over Next 6. M~~th~ (Type, Date. and Duration of Each):

January 1978 -

  • Refu~J;i,ng Outage
25. If Shut Down At End Of Report Period; Estimated Date of Startup:-:' -* *
26. Units In Test Status (Prior to Commeri::ial Operation):

_.;_. n-INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION..

  • ~, '.
  • r
  • i

,: ~.

J ' ~.

. ~ :.*.

Forecast

      • .~-Achi~~~ *~... ~

. (

~-~--06--*-~-_.., _____ _

I I

I I i I l

I i

'. " :~*. ".-',..

I l.Je I l Ii 1

! i

'~ l

  • l
  • ' t

' ' 1 j

i :

l j.e 1-J l' l i I!

l {*

J i l

(~

\\

APPENDIX D DOCKET NO.

50-255 UNIT SHUl:OOWNS AND POWER REDUCTIONS UNIT NAME PALISAPES

])ATE 1-4-78 CpMi>LETED BY DIBollnow REPORT MONTH. DECEMBER 1977' TELEPHONE 616-76-4-8913 METHOD OF

' : ~

1 TYPE SHUTTING DQWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CQ~RECTIVE ACTIONS/COMMENTS (1)

~E~SON

  • 14 771211 F

35.2 A

2

.;."1~..

A: EQUIPMENT FAILURE (EXPLAIN)

~: M'\\INT., o~ TEST.

C: ItEFUl!pNG

~: ~EGUH\\TORY.RESTRICTION E: OP~RATOR.TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G; µPl\\ll"'J'IONAJ. liRROR (EXPLAIN)

II: OTllt::ll UiXl'l.AIN)

I

  • Loss of offsite power.

Cause not' yet determined.

' (2)

MµTHOD I: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4:

OTllEI~ (EXl1LAIN)

SUMMARY

The Plant_ operated at a nominal 98% power level for *most of the mo*r;i.th with 'except;ion of :the above outage.

Coastdown began during the last week of this month.

iSll.J Jt\\i'J I 0 Alvl 9 5 3

.°:'.'.

..