ML18347A822
| ML18347A822 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/23/1976 |
| From: | Adams W Consumers Power Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A822 (2) | |
Text
~f
~* 'r consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 June 23, 1976 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a revised copy of Appendix E for the Palisades Nuclear Plant for the month of May, 1976.
William E. Adams General Engineer cc:
JGKeppler RBDeWitt RBSewell DEVanFarowe, State of Mich.
e*
11' b
_..-..;..-..*Mrtrmwcllll'ililot~r1*1*~*,...... *.*.__.,.-.._..._,...,...--e~*~***+t~, _...,M*-..;*...-.-.11~
~_..._..._.. __.....,..__._.,....,_~ __
........._ ____ _......_.,_ __...._ __ A:::i.
\\
TYPE F*FORCED DURA"rlPN NO.
DATE S*SCHEDULED I (HOU.RS) 10 751220 f?
280.4 1
s 2240.7 (197.1 f'o:i:
2 750509 F.
.5 3*
750510 F
7.1 4
7'50512 F
146.1 t
SUMMARY
APPENDIX E UNIT SHUIDOWNS CORRECTED DOCKET NO.
UNIT NAME DATE COMPLETED UY 50-255 Palisades 6-23-76 DIBollnow REPORT MONTH _..;;,Ma,;;,;;;,:i,<...y....::1=9..._76--... __
METHOD OF SHUTTING DOWN REASON (1)
THE REACTOR (2)
COR R.ECTIVE ACTIONS/COMMENTS c
3 Item #1 is as.'Item #10 a Ccint'inuing -Refueling Outage
. c.
3 May)
A Reillained Critical Repair a Secondary Relief Valve A
- 3 Loss, of' *Feedwater _Pump.
. '\\
A 1
Repair.CRDM Seal Leakage (1) REASON
{2) METHOD.
A*-EQUIPMENT 1-'AILURE'(EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM 0-REGULATORY RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING ANO SCRAM LICENSE EXAMINATION r-ADMINISTRATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTliER (EXPLAIN)
'I t
r i
I I.
I
, I 1
I