consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 September 2, 1976 USNuclear RegUlatory Cominission Mail and Records Section Washington, D.C., 20555 Re:
LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO.
50~255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the Month of August, 1976.
William E. Adams General Engineer cc:
JGKeppler, NRC RBDeWitt RBSewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich.
('~
~PPENDIX C DOCKETN0. __
50~-~2-55~-
UNIT __
P_a_l_is_a_d_e_s_
DATE _9
__ -_l_-7_6 __
COMPLETED BY __
n_rn_0_ 1_1_n_o_w __ _
AVERAGE-DAILY UNIT POWER LEVEL MONTH August 1976
-AVERAGE DAILY POWER LEVEL AVERAGE DAILY PO\\VER LEVEL DAY
{MWe-net)
DAY (MWe-net) 1 655
'lT 656 2
659 18 656 3
622 19 649
.4 646 20 650 5
631 21 640 6
242 22 644 7
291 23 311 8
652 24
.* 0 9
648 25 0
10 638 26 63 -
11 600 27 -
20l 12 580 28 0
13 609 29 333 14 648 30 634*
1"5 647 31 2J 7*
16 654 DAILY UNIT POWER LEVEL FOR~1 INSTRUCTIONS On this form, list the average daily unit power level in M\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum_
dependable capacity for the nd ekctric::il rating of th:: unit. there may b.: occasions when the daily average power level exceeds the I 00'}, line (or the restricted power level-line). In such cases, the
-~average daily unit powa output sheet should be footnot::d to explain the ap-parent anomaly.
1.16-C-l f :*
--.....--..---..-~.~----":-_ _... ____ ~--=---... ---,-_,......,....,__..... ___ ~-....-... ~--*~-....,._,~***---'!*~***~*"'!*~-.....,~.~-~~..... ~*""* *-
ts=:-,'!;~.*.
I I
- I J, *.
. ttf
_i}
~~J APPEl\\JDIX D UNIT __
P_a_l-:i==-* s::...a~d......c:.e,c;..s __ -'-
9-1-76 DATE-..,c6~1~6==*~76~4~-~s~9~i~3--
CO>IPLETED BY DIBollnow*
DOCKET N0. __
5_0_-_2_5_5 ____ _
OPERA TING STATCS 760801*
76083i
- l.
- REPORTING PERIOD:
THROUGH ---'------------
HOURS IN REPOl{TJ'.':_G_P_I:_:R-1-0-D-: ----7~4~4----~--
- 2.
CUR RE ;-.;TL y ACTH 0 R IZ ED PO\\\\_T_R_L_E--\\'-' E-
.. L-(-~1-\\'-/t-h) __
2_2_0_0_t-_1,->.X_._D_E_' l*-,E-
.. N-.D-A_B_L_E_* c-,-\\P-,-\\C_!_T_Y_(_;\\l-\\-\\'e--N-' E_T_) __ -_-_-6:8:4==
- 3.
LOWEST POWER LEVEL TO WH!CI! SPECIFICALLY RESTRICTED (IF ANY) (~!We-NET): __________ _
- 4..
REASO~S FOl~ RESTRICTION (IF ~\\NY):
THIS REPORTING PERIOD
- 5.
HOURS REACTOR WAS CRITICAL.............
729.5
- 6.
REACTOR RESERVE SHUTDOWN HOURS.......
- 7.
HOURS GENERATOR ON LINE...............
659
- 6
- 8.
l.!NJT RESER\\"!:: SHUTDOWN HOURS...........
- 9.
GROSS THER~IAL ENERGY GENERATED (~IWH)..................*.. 1,260,240
- 10.
GR.OSS ELECTRICAL ENERGY
-GE:\\ERATED (>IWH)... :.................
- 11.
NET ELECTRICAL ENERGY GENERATED
(>IWH}.............................
- 12.
RE:\\CTOR AV,\\ILAB!LITY FACTOR (I).........
- 13.
UNIT A VAlLAl31LlTY FACTOR (2)......*..**.
- 14.
l'NIT CAPACITY FACTOR (3)........ /.......
- 15.
UNIT FORCED OllTAGE RATE (4)............
389,630 362,765 98.1%
88.7%
71.3%
11.3%
YR TO DATE 2,575.6 2,328.6.
4°,393,440 1,365,490' 1,272 '775*
44.0%
---'---39-, 8%
3::.:1=.;. 8%
14.6%
CU.'.!UL\\ T!VE TO DATE 15,662.6 17,302.4 27,413,400 8,512,1~0 7,954,421
---T5*.6%
m-=2~:3%
31.5%
49.0%
~
- 16.
Sl!FfDOW!';S SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, r\\ND DURATION OF EACH):
- 17.
IF Sllt:TDOWN.-\\TEND OF REPORT PERIOD, ESTIMATED DATE OF STARTL'P: ____________ _
- 18.
UNITS IN TEST ST.*\\TlJS (PRIOR TO Cm.t:-.!ERCIAL OPERATION) REPORT THE FOLLOWING:
{I)
RE..\\CfOR..\\ \\'AILABIL!TY FACTOR l::-.<IT AVAILABILITY FACTOR (3)
L'NIT C\\P,\\C!TY FACfOR l-\\)
l:Nrr FORCED OFL\\GE R:\\TE INITIAL CRITICALITY lK!Tl,\\L ELECTRICAL POWER GEl'ERATION C0~1MERCIAL OPERATION HOURS REACTOR WAS CRIT!Cr\\L HOL;RS IN REPO!l.TING PERIOD x 100 HOURS GENERATOR ON Ll:--iE
XIOO llOCRS IN REPORTING PERIOD NET FLF.CTRIC\\l. !'0\\\\TR GF~FR:\\TED DATE LAST FOREC:\\ST DATE ACll!EVED MAX. Dl-.!'END.-\\~iLl*. C\\l':\\CITY C'!\\\\".:-NET) X HOURS I~ !U.l'ORTINC l'l*:KiOlJ FORCED O~.."T.-\\C!C HOL'RS
*---------x 100 llOL:i.zs GENLR.-\\TOl{ O:-< Ll~E ~FORCED Qt;T..\\GE l!OU!ZS 1.16-D-I
~
... A"
.r-~"-1 L* '
ttt**frrf ='1*t drn.., __
+/-..0*'..o*...
- MtOS-'Cllilio' ilillt 11111'1 --*n*illliH.... ____
""""" d....,..._!!!_"........ *-- f -
~ **
~
l*.*-
1 I
i "
Q\\*
r:r: -
NO.
DATE 7
760823 8
760825 9
760827 10 760831
- suMMARY:
\\
TYPE F*FORCED DURATIPN S*SCHEDULED * (HOURS)
F
. 44.9
'F 16.8 F
17.5 F
5.2 APPENDIX E UNIT SHUTDOWNS DOCKET NO. ---"-5.;;...o-..;;;;2=55'---- ~
UNIT NAME _PA_L_I_SAD_E_s __
DATE ---..9-_l_-7,,_6 __
. COMPLETED By _D_I_B_o_l_ln_o_w __ _
REPORT MONTH __
- ..:;;.:A~ugu"'-=s...;;.t..;;l;;.;:;9~76.;;...__
METHOD OF
~HUTTING DOWN REASON (1)
THE REACTOR (2)
B H
3 A
A
'3*
'I I
C,OR R.ECTIVE ACTIONS/COMMENTS Loss of Vacuum.during Condenser Leak Tesi Instability. ofFW Reg. System caused ST low level* trip.
/
Malfunct;ion *of~ two CRDMs.
MS!Vs closed due to inoperability of Instrument air dryer
. '\\
(1) REASON A*-EQUIPMENT FAlLURE'(EXPLAIN)
B-MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-*Ol'ERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTHATIVE G-Ol'ERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
(2) METHOD I