PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure

From kanterella
Jump to navigation Jump to search
PNO-II-93-052:on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure
ML20057E309
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/01/1993
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-93-052, PNO-II-93-52, NUDOCS 9310120007
Download: ML20057E309 (1)