PNO-II-84-069A, update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West
ML20198Q677 | |
Person / Time | |
---|---|
Site: | Hatch, Saint Lucie, Brunswick, Surry, Turkey Point, 07001113 |
Issue date: | 10/11/1984 |
From: | Cline W, Stansberry W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
References | |
PNO-II-84-069A, PNO-II-84-69A, NUDOCS 9711130006 | |
Download: ML20198Q677 (1) | |
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999
[Table view]PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly1999-06-17017 June 1999 PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized1999-05-0707 May 1999 PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury1998-09-18018 September 1998 PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site PNO-II-98-016, on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be Taken1998-03-17017 March 1998 PNO-II-98-016:on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be Taken PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown1997-11-21021 November 1997 PNO-II-97-060:on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown PNO-II-97-049, on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background1997-09-0505 September 1997 PNO-II-97-049:on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background PNO-II-97-044, on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling1997-08-14014 August 1997 PNO-II-97-044:on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling PNO-II-97-017, on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed1997-03-13013 March 1997 PNO-II-97-017:on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed PNO-II-97-006A, on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions1997-01-30030 January 1997 PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions PNO-II-97-006, on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified1997-01-29029 January 1997 PNO-II-97-006:on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified PNO-II-93-067, on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 19931993-11-30030 November 1993 PNO-II-93-067:on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993 PNO-II-93-062, on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations1993-11-16016 November 1993 PNO-II-93-062:on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations PNO-II-93-061, on 931107,Unit 2 Began Shutdown Due to Increase in Unidentified Drywell Leakage.Util in Process of Implementing Reactor Vessel Water Level Mods Per Bulletin 93-0031993-11-10010 November 1993 PNO-II-93-061:on 931107,Unit 2 Began Shutdown Due to Increase in Unidentified Drywell Leakage.Util in Process of Implementing Reactor Vessel Water Level Mods Per Bulletin 93-003 PNO-II-93-060, on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated1993-11-0808 November 1993 PNO-II-93-060:on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure1993-10-0101 October 1993 PNO-II-93-052:on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure PNO-II-93-050, on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed1993-09-28028 September 1993 PNO-II-93-050:on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity1993-08-30030 August 1993 PNO-II-93-042:on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity PNO-II-93-040, on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified1993-08-25025 August 1993 PNO-II-93-040:on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified PNO-II-93-037, on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified1993-08-23023 August 1993 PNO-II-93-037:on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 9306131993-06-10010 June 1993 PNO-II-93-025:on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified1993-01-13013 January 1993 PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified PNO-II-92-055C, on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled1992-09-0303 September 1992 PNO-II-92-055C:on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew1992-08-31031 August 1992 PNO-II-92-055B:on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request1992-08-27027 August 1992 PNO-II-92-055A:on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request PNO-II-92-055, on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified1992-08-24024 August 1992 PNO-II-92-055:on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys1992-02-0505 February 1992 PNO-II-92-007:on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys PNO-II-91-044, on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified1991-07-10010 July 1991 PNO-II-91-044:on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified PNO-II-91-043, on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site1991-07-0808 July 1991 PNO-II-91-043:on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site ML20203C5941991-06-0404 June 1991 PNO-IIT-91-001:on 910603,team Toured Facility & Examined Equipment & Instrumentation Associated W/Event.Team in Early Stages of Conducting Interviews,Reviewing Procedures & Drawings & Analyzing Facts PNO-II-90-066, on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation1990-10-23023 October 1990 PNO-II-90-066:on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation PNO-II-90-047B, on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items1990-08-30030 August 1990 PNO-II-90-047B:on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items PNO-II-90-047A, provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves1990-08-24024 August 1990 PNO-II-90-047A:provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 9009151990-08-22022 August 1990 PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915 PNO-II-90-044, on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread1990-08-0202 August 1990 PNO-II-90-044 :on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread PNO-II-90-039, on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const1990-07-23023 July 1990 PNO-II-90-039:on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const 1999-09-15 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999
[Table view]PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph IR 05000280/19993021999-09-0808 September 1999 NRC Operator Licensing Retake Exam Repts 50-280/99-302 & 50-281/99-302 for Retake Exam Tests Administered on 990824. Exam Results:One SRO Candidate Received Part B re-take Operating Exam & Passed ML20216F1281999-09-0808 September 1999 Insp Rept 70-1113/99-05 on 990809-13.No Violations Noted. Major Areas Inspected:Rountine Unannounced Insp Involved Observation of Work Activities,Review of Selected Records ML20211L3001999-08-31031 August 1999 Insp Rept 70-1113/99-04 on 990726-0805.No Violations Noted. Major Areas Inspected:Plant Operations,Mgt Organization & Controls,Maint/Surveillance & Emergency Preparedness PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support ML20211F2551999-08-25025 August 1999 Insp Rept 70-1113/99-202 on 990802-06.No Violations Noted. Major Areas Inspected:Implementation of GE Fire Protection Program Commitments Re Safe Plant Operations ML20210V2051999-08-13013 August 1999 Insp Rept 70-1113/99-03 on 990712-16.No Violations Noted. Major Areas Inspected:Environ Monitoring Program IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly1999-06-17017 June 1999 PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support ML20195D4131999-06-0404 June 1999 Partially Withheld Insp Rept 70-1113/99-201 Conducted on 990510-14.No Violations Noted.Details Withheld,Per 10CFR2.790 IR 05000280/19993011999-05-14014 May 1999 NRC Operator Licensing Exam Repts 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15 PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized1999-05-0707 May 1999 PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage ML20203G4671999-02-0505 February 1999 Insp Rept 70-1113/99-01 on 990111-15.No Violations Noted. Major Areas Inspected:Observation of Work Activities,Review of Selected Records & Interviews with Personnel in Area of Radiation Protection ML20202J1001999-01-29029 January 1999 Insp Rept 70-1113/99-02 on 990104-08.No Violations Noted. Major Areas Inspected:Plant Operations,Environ Protection & Training IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness ML20155A8561998-09-30030 September 1998 Insp Rept 70-1113/98-05 on 980908-10.No Violations Noted. Major Areas Inspected:Licensee Program for Security & Safeguards IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury1998-09-18018 September 1998 PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury ML20154C3421998-09-11011 September 1998 Insp Rept 70-1113/98-03 on 980817-21.No Violations Noted. Major Areas Inspected:Evaluation of Licensee Conduct of Transportation Program for Radioactive Matls & Radioactive Waste Mgt Program 1999-09-08 |
.- ~. :
[ h MclVR,)q october u , 19s4 CC61 PRELIMIN{RY NOTIFICAfl0N OF EYr.NT OR UNUSUAL, OCCURRENCE PNO,II-84-69A T. troliminary notificetiod constitutes EARLYJotice of events of P05SIBLE safety or ~
pu . interest significance. The information 71 as initially received without verifi-cation or evaluation, anc is basically all that is known by the Region !! staff on this date.
FACILITY: ' Carolina Power and Light Company Litensee Emergency Classification:
Brunswick Unit I and 2
- Notification of Unusual Event Docket Nos. 50 325 and 50-324 / , Aleet southport, North Caroline site Area Emergency eFlorida Power .tnd t.ight Company St. Lucie Unitt 1 and I
~ 8eneral Emergency n 5
~~ et Appliceb' e '
' Docket Nos. 50 335/and 60-389 fort Pierce. Florida S* =
Turkey Point U11ts 3 and 4 Docket Nos. 50 250 and 50-261 '
C 3:2.
Homestead Florida Sz G General EIectrIc Company -
F Docket No. 70-1113 : N Wilmington, North Carolina -
- Georgia Power Oowany --
'Natch' Units 1 (snd 2 Docket hos. 50-321.and 50-366 e d -
Baxley, Geor = a
+ Virginia E1:g$s "' Power Company ctric and -
Surry Units 1 innd 2 u '
cn i Docket Nos. 50-280 and 50-281 - '
i Surry, Virginia e Sf ,Un
- 2 o l
h CT: ACTIONS IN RESPONSE TO NURRICANE JOSEPHINE -- UPDATE ['
m -
8 gc, This PN updates PN0-II-84-69, issued on October 10. O ,
R:gien !! continues to menitor Hurricane Josephine, which, as of j a. today was centered near latitude 29.4 north and longitude 72.5 west. This position.is out145bmilessouth southeast of Cape Hatteri.s, North Carolina. The storm is drifting s1 toward the north at about five miles an hour, a movement expett48 to continue today. Maximum sustained
, winds are near 85 miles en hour, with gysts to 100 miles an hour.
It is now estimated that-(nere is an eight percJHt probability that the horricane will be within 65 miles of Cape Fatteres by 2 a.m. (EDT) Sunday, October 14.
Mediacoverageofthesttretiscontinuing,butd6esnotinvolveNRC-licensedactivities.
This-infonnation is currtnt as of 9 a.m. today.
y cont et: W. W. Stansberty, 242-5248 W. E. Cline, 24242665 T)b i
, \
C/R Distribution: Chm, Cmrs
9711130006 841011
-I 4-6 A PDR *
, 4 4 to , *
- -- - . - - . - - . , - . - ,, . - . - - . - . , . - .v. .