IR 05000250/1989003
ML17345A650 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 04/24/1989 |
From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Conway W FLORIDA POWER & LIGHT CO. |
References | |
NUDOCS 8905040296 | |
Download: ML17345A650 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-223, Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted1999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4491999-10-20020 October 1999 Discusses Request for Relief 20 Submitted by FP&L on 990409 & 990907 from Requirements of ASME Code Section Xi,Contained in First ten-year Interval for Containment ISI Program at Turkey Point.Forwards SE Supporting Proposed Alternative ML17355A4571999-10-15015 October 1999 Forwards Exam Repts 50-250/99-301 & 50-251/99-301 on 990830- 0916.All Seven SRO & RO Applicants Who Received Written Exams & Operating Tests Passed,Representing 100 Percent Pass Rate ML17355A4481999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Turkey Point Nuclear Plant & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insp at Facility Over Next 5 Months L-99-209, Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included1999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4281999-10-0404 October 1999 Discusses Closeout of GL 97-06, Degradation of SG Intervals. Purpose of GL Was to Obtain Info That Would Enable Staff to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases for Plants L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included L-99-216, Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days1999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4391999-10-0404 October 1999 Forwards Insp Repts 50-250/99-05 & 50-251/99-05 on 990725-0904.No Violations Noted.Insp Generally Characterized by Safety Conscious Operations & Effective Maint Activities L-99-217, Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std1999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4271999-10-0404 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. NRC Reviewed Util 980804,0628 & 990716 Responses to Subj GL & Concludes That All Requested Info Provided ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl L-99-197, Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 9908201999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4221999-09-16016 September 1999 Requests That Util Assess Impact of Proposed Potential Risk of Proposed Civil Aircraft Operations at Homestead Air Force Base & Update FSAR & Other Related Documents When Proposal Becomes More Defined L-99-196, Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-081999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 L-99-187, Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC1999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC L-99-198, Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 9908301999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4151999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List of Conference Attendees,Copy of Slide Presentations & List of Participant Questions Encl L-99-174, Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity L-99-178, Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included1999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4081999-08-23023 August 1999 Forwards Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Occurred & Being Treated as NCV ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 L-99-173, Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance1999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A4051999-08-20020 August 1999 Confirms 990813 Telcon Between M Dryden & at Boland Re Engineering Meeting to Be Conducted on 990908 in Atlanta,Ga to Discuss Engineering Issues at St Lucie & Turkey Point Facilities ML17355A3991999-08-12012 August 1999 Forwards Evaluation Rept Accepting Licensee Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML17355A3971999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at St Lucie & Turkey Point Nuclear Plants.Sample Registration Ltr Encl L-99-172, Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY011999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 L-99-165, Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants1999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants L-99-152, Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept1999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3731999-07-0808 July 1999 Discusses Closure of TACs MA0579 & MA0580 Re Licensee Response to RAI on GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 990519 to Turkey Point Plant L-99-147, Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes1999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3741999-07-0202 July 1999 Forwards Insp Repts 50-250/99-03 & 50-251/99-03 on 990502-0612.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy L-99-140, Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators1999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators L-99-151, Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 19981999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 L-99-137, Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness1999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness L-99-136, Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves1999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves L-99-117, Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions1999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML17355A3411999-05-27027 May 1999 Forwards Insp Repts 50-250/99-02 & 50-251/99-02 on 990321-0501.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcment Policy L-99-031, Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-0311999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 L-99-115, Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley1999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17241A3281999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML17336A0661999-05-0303 May 1999 Responds to to Chairman Jackson Expressing Support for FP&L Request for Waiver of Applicable Review Fees Associated with Application for License Renewal for Plant,Units 3 & 4 L-99-085, Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 9903301999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2961999-04-16016 April 1999 Discusses DOL Administrative Review Board Case 98-ERA-044 & Administrative Law Judge Case 96-ERA-36.Investigation of Complaint Concluded That There Was Insufficient Evidence to Substantiate Allegation of Discrimination.Case Dismissed ML17355A2981999-04-16016 April 1999 Forwards Insp Repts 50-250/99-01 & 50-251/99-01 on 990207-0320.One Violation Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17355A2901999-04-15015 April 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Turkey Point Plant,Units 3 & 4. Response Requested within 60 Days from Receipt of Ltr ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2971999-04-0909 April 1999 Informs That on 990318,P Finegan & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 001204 & 18 for Approx 16 Candidates L-99-075, Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 9910011999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 1999-09-09 Category:NRC TO UTILITY MONTHYEARML17348A7461990-11-16016 November 1990
[Table view]Advises That Util 900928 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2, Vendor Interface for Safety-Related Components, Meets Requirement ML17348A7491990-11-15015 November 1990 Forwards Insp Repts 50-250/90-36 & 50-251/90-36 on 901005-1102.Violations Noted ML17348A7301990-11-0808 November 1990 Forwards Summary of NRC Understanding of Current Status of Unimplemented Generic Safety Issues at Plant Per Generic Ltr 90-04 ML17348A7411990-11-0808 November 1990 Forwards Summary for Allegation Rii 90-A-0187,per 901107 Telcon & Requests Initiation of Review.Encl Withheld (Ref 10CFR2.790(a)(6) & 2.970(a)(7)) ML17348A7271990-11-0707 November 1990 Forwards Insp Repts 50-250/90-37 & 50-251/90-37 on 901015-19.No Violations or Deviations Noted ML17348A7321990-11-0606 November 1990 Forwards Info Re Allegation Rii 90-A-0168,per 901105 Telcon. Results of Review Requested within 45 Days.W/O Encl ML17348A7191990-10-30030 October 1990 Forwards Insp Repts 50-250/90-34 & 50-251/90-34 on 901001-05.Violations Noted But Not Cited IR 05000250/19900351990-10-30030 October 1990 Forwards Insp Repts 50-250/90-35 & 50-251/90-35 on 901001-05.No Violations or Deviations Noted.Repts Withheld (Ref 10CFR73.21) ML17348A7131990-10-25025 October 1990 Requests That Util Provide Ref Matls Listed in Encl 1, Ref Matl Requirements, for Exams Scheduled 910121-0201 IR 05000250/19900261990-10-16016 October 1990 Discusses SALP Repts 50-250/90-26 & 50-251/90-26 & Forwards Summary of 901005 Meeting in Florida City,Fl ML17348A6051990-10-16016 October 1990 Alerts to Possible Delays in Processing Util 900913 License Amend Request Re RTD Bypass Replacement.Errata to WCAP-12632 Should Be Submitted to NRC in Order to Complete Safety Evaluation in Timely Manner ML17348A6101990-10-12012 October 1990 Requests Analyses of Liquid Samples Spiked W/Radionuclides Be Completed within 60 Days of Sample Receipt ML17348A6031990-09-28028 September 1990 Ack Receipt of Requesting Temporary Waiver of Compliance from Action Statement of Tech Specs 3.6 & 3.0.1. Request for 24 H Time Extension Granted,Per 900927 Telcon ML17348A5941990-09-25025 September 1990 Forwards Initial SALP Repts 50-250/90-26 & 50-251/90-26 for Aug 1989 - Jul 1990.Assessment Indicates Superior Performance in Safety Assessment/Quality Verification Area. Security Improved from Category 3 to Category 2 ML17348A5841990-09-21021 September 1990 Forwards Insp Repts 50-250/90-30 & 50-251/90-30 on 900804-31 & Notice of Violation ML17223A9481990-09-19019 September 1990 Forwards Request for Addl Info Re Topical Rept NTH-TR-01 on Retran Model Qualification & Decrease in Heat Removal by Secondary Sys ML17348A5491990-09-10010 September 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project.Response Requested by 900924 ML17348A5531990-09-0707 September 1990 Forwards Insp Repts 50-250/90-28 & 50-251/90-28 on 900806- 10.Violations Noted But Not Cited ML17348A5221990-08-23023 August 1990 Forwards Insp Repts 50-250/90-29 & 50-251/90-29 on 900730-0802.No Violations or Deviations Noted ML17348A5181990-08-20020 August 1990 Ack Receipt of 900810 Response to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18 ML17348A5191990-08-17017 August 1990 Forwards Insp Repts 50-250/90-25 & 50-251/90-25 on 900630- 0803.Violation Noted But Not Cited ML17348A5101990-08-14014 August 1990 Forwards Summary & Presentation of 900726 Meeting in Region II Ofc Re Licensee self-assessment.List of Attendees & Viewgraphs Encl ML20058N2041990-08-10010 August 1990 Advises That 900725 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML17348A4911990-08-0909 August 1990 Forwards Safety Evaluation Accepting 831108 & 870417 Submittals Re Generic Ltr 83-28,Item 2.2.1 Concerning Program for Properly Classifying safety-related Components. Technical Evaluation Rept Also Encl ML17348A4851990-08-0606 August 1990 Forwards Notice of Withdrawal of Portion of Application for Amends to Plant Ols,Per .Amends Regard Composition List of Company Nuclear Review Board ML17348A4781990-07-27027 July 1990 Advises That Util Responses to NRC Bulletin 88-010 Confirms That Actions Required to Address Issue of Substandard Molded Case Circuit Breakers Completed IR 05000250/19900141990-07-27027 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14 ML17348A4741990-07-25025 July 1990 Advises That Util 900530 Final Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems, Acceptable ML20055J2431990-07-24024 July 1990 Advises That 900711 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Plan Withheld (Ref 10CFR73.21) ML17348A4811990-07-23023 July 1990 Forwards Insp Repts 50-250/90-18 & 50-251/90-18 on 900526-0629 & Notice of Violation ML17348A4421990-07-19019 July 1990 Forwards Insp Repts 50-250/90-22 & 50-251/90-22 on 900618-22.No Violations or Deviations Noted ML17348A4711990-07-18018 July 1990 Forwards Insp Repts 50-250/90-21 & 50-251/90-21 on 900625-29.No Violations or Deviations Noted ML17348A4541990-07-18018 July 1990 Forwards Insp Repts 50-250/90-23 & 50-251/90-23 on 900625- 29.No Violations or Deviations Noted IR 05000250/19900091990-07-16016 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09 ML17354A2751990-07-14014 July 1990 Confirms 900612 Telcon Re Licensee self-assessment Presentation on 900726 at Region II Ofc for Current Aug 1989 - Jul 1990 SALP Period ML17348A4331990-07-13013 July 1990 Forwards Insp Repts 50-250/90-19 & 50-251/90-19 on 900618-22.No Violations or Deviations Noted ML18008A0341990-07-0606 July 1990 Ack Receipt of 900705 Request for Temorary Waiver of Compliance W/Action Statement of Tech Spec 3.4.2.b.1 Re ESFs - ECCS ML17348A3721990-07-0505 July 1990 Requests Addl Info on Emergency Power Sys Enhancement Project by 900723,in Order to Complete Review of Rept,Per 880623 Submittal,As Supplemented 890403 & 900604 ML17348A3951990-06-28028 June 1990 Forwards Insp Repts 50-250/90-20 & 50-251/90-20 on 900604-08.No Violations or Deviations Noted ML17348A5441990-06-28028 June 1990 Requests Ref Matls by 900829 in Preparation for Reactor Operator (RO) & Senior RO Exams Scheduled for Wks of 901029-1116 ML17223A8331990-06-26026 June 1990 Advises That 891228 Response to Generic Ltr 89-10 Re Safety-Related Motor-Operated Valve Testing & Surveillance, Acceptable ML17348A4011990-06-25025 June 1990 Forwards Insp Repts 50-250/90-15 & 50-251/90-15 on 900521-25.No Violations or Deviations Noted ML17348A3511990-06-21021 June 1990 Forwards Insp Repts 50-250/90-14 & 50-251/90-14 on 900428-0525 & Notice of Violation ML17348A3451990-06-18018 June 1990 Forwards Insp Repts 50-250/90-16 & 50-251/90-16 on 900522-25 & 0530-0601.No Violations or Deviations Noted ML17348A2951990-06-15015 June 1990 Forwards Request for Addl Info Re Emergency Power Sys Enhancement Project ML17348A3071990-06-15015 June 1990 Forwards Safety Evaluation Re Implementation of Station Blackout Rule.Listed Areas Require Followup Insp to Verify That Implementation of Mods & Supporting Documents Adequate to Meet Station Blackout Rule ML17348A3171990-06-15015 June 1990 Forwards Final Draft of Tech Specs for Emergency Power Sys Enhancement Project,For Review & Certification That Final Draft Consistent W/Updated FSAR & w/as-built Plant. Certification Should Be Provided Under Oath & Affirmation ML17348A3421990-06-15015 June 1990 Forwards Insp Repts 50-250/90-13 & 50-251/90-13 on 900430-0504 & 0514-18.No Violations or Deviations Noted.Util Attention Invited to Unresolved Item Re Ability to Install External Hydrogen Recombiner ML20059M9461990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML17348A3141990-06-12012 June 1990 Forwards Insp Repts 50-250/90-17 & 50-251/90-17 on 900529-0601.No Violations or Deviations Noted 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML17355A4491999-10-20020 October 1999
[Table view]Discusses Request for Relief 20 Submitted by FP&L on 990409 & 990907 from Requirements of ASME Code Section Xi,Contained in First ten-year Interval for Containment ISI Program at Turkey Point.Forwards SE Supporting Proposed Alternative ML17355A4571999-10-15015 October 1999 Forwards Exam Repts 50-250/99-301 & 50-251/99-301 on 990830- 0916.All Seven SRO & RO Applicants Who Received Written Exams & Operating Tests Passed,Representing 100 Percent Pass Rate ML17355A4481999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Turkey Point Nuclear Plant & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insp at Facility Over Next 5 Months ML17355A4271999-10-0404 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. NRC Reviewed Util 980804,0628 & 990716 Responses to Subj GL & Concludes That All Requested Info Provided ML17355A4391999-10-0404 October 1999 Forwards Insp Repts 50-250/99-05 & 50-251/99-05 on 990725-0904.No Violations Noted.Insp Generally Characterized by Safety Conscious Operations & Effective Maint Activities ML17355A4281999-10-0404 October 1999 Discusses Closeout of GL 97-06, Degradation of SG Intervals. Purpose of GL Was to Obtain Info That Would Enable Staff to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases for Plants ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4221999-09-16016 September 1999 Requests That Util Assess Impact of Proposed Potential Risk of Proposed Civil Aircraft Operations at Homestead Air Force Base & Update FSAR & Other Related Documents When Proposal Becomes More Defined ML17355A4151999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List of Conference Attendees,Copy of Slide Presentations & List of Participant Questions Encl ML17355A4081999-08-23023 August 1999 Forwards Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Occurred & Being Treated as NCV ML17355A4051999-08-20020 August 1999 Confirms 990813 Telcon Between M Dryden & at Boland Re Engineering Meeting to Be Conducted on 990908 in Atlanta,Ga to Discuss Engineering Issues at St Lucie & Turkey Point Facilities ML17355A3991999-08-12012 August 1999 Forwards Evaluation Rept Accepting Licensee Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML17355A3971999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at St Lucie & Turkey Point Nuclear Plants.Sample Registration Ltr Encl ML17355A3731999-07-0808 July 1999 Discusses Closure of TACs MA0579 & MA0580 Re Licensee Response to RAI on GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 990519 to Turkey Point Plant ML17355A3741999-07-0202 July 1999 Forwards Insp Repts 50-250/99-03 & 50-251/99-03 on 990502-0612.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML17355A3411999-05-27027 May 1999 Forwards Insp Repts 50-250/99-02 & 50-251/99-02 on 990321-0501.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcment Policy ML17241A3281999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML17336A0661999-05-0303 May 1999 Responds to to Chairman Jackson Expressing Support for FP&L Request for Waiver of Applicable Review Fees Associated with Application for License Renewal for Plant,Units 3 & 4 ML17355A2961999-04-16016 April 1999 Discusses DOL Administrative Review Board Case 98-ERA-044 & Administrative Law Judge Case 96-ERA-36.Investigation of Complaint Concluded That There Was Insufficient Evidence to Substantiate Allegation of Discrimination.Case Dismissed ML17355A2981999-04-16016 April 1999 Forwards Insp Repts 50-250/99-01 & 50-251/99-01 on 990207-0320.One Violation Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17355A2901999-04-15015 April 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Turkey Point Plant,Units 3 & 4. Response Requested within 60 Days from Receipt of Ltr ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2971999-04-0909 April 1999 Informs That on 990318,P Finegan & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 001204 & 18 for Approx 16 Candidates ML17355A2831999-04-0707 April 1999 Informs That NRC Staff Arranged for Public Meeting with Util Representatives on 990414 in Rockville,Md to Discuss Renewal of Turkey Point as Requested ML17355A2761999-03-26026 March 1999 Forwards SE as Closeout Rept for Ampacity Derating Issues Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per Util 980626 & 30 Responses to NRC 980423 Rai.No Outstanding Ampacity Derating Issues as Identified in GL for Plants ML17355A2811999-03-22022 March 1999 Advises of Completion of Plant Performance Review on 990203. Review Conducted to Develop Integrated Understanding of Safety Performance,Facilitate Planning & Allocation of Insp Responses.Plant Issue Matrix Encl ML17355A2561999-03-0808 March 1999 Forwards Insp Repts 50-250/98-13 & 50-251/98-13 on 981227-990206.No Violation or Deviations Noted ML17355A2321999-02-16016 February 1999 Forwards List of Correspondence Between NRC & Util Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217. Correspondence Consists of Util Responses to GL 92-08 & to Requests for Addl Info.Three Issues Remain to Be Resolved ML17355A2241999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Condidates for Exam ML17355A2001999-01-29029 January 1999 Discusses Consent to Confirmatory Order Modifying License, Making Commitment for Implementing Thermo-Lag 330-1 Fire Barrier Corrective Actions at Plant,Requirement by December 31,2001 ML17355A1991999-01-25025 January 1999 Discusses Util Re Participation in WOG Initiative & Activities at Turkey Point Plant,Units 3 & 4,resulting from Initiative ML17355A1981999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of an agency-wide Streamlining Effort.Reorganization Necessary Due to Staffing Reductions in FY99 Budget ML17355A1931999-01-12012 January 1999 Forwards Insp Repts 50-250/98-12 & 50-251/98-12 on 981115-1226.No Violations Noted.Conduct of Activities at Facility Was Generally Characterized by safety-conscious Operations & Critical self-assessment ML17355A1901998-12-23023 December 1998 Refers to Training Managers Conference Conducted at Richard B Russell Building on 981105.List of Attendees & Agenda Used for Training Managers Conference Encl ML17354B2071998-12-15015 December 1998 Forwards RAI Re Licensee 981102 All Info Re Classification of Bld Roof,Fire Zone 106R.Original Request for Exemption Was Submitted on 961212.Target Date for Response Has Been Agreed Upon to Be 60 Days from Receipt of RAI ML17354B2101998-12-0909 December 1998 Forwards Insp Repts 50-250/98-11 & 50-251/98-11 on 981004- 1114.No Violations Identified.Activities at Turkey Point Generally Characterized by safety-conscious Operations & Strong Health Physics & Engineering Support ML17354B1781998-11-0202 November 1998 Forwards Insp Repts 50-250/98-10 & 50-251/98-10 on 980823-1003.No Violations Noted.Conduct of Activities at Facility Generally Characterized by safety-conscious Operations & Well Executed Maint & Testing Activities ML17354B1771998-11-0202 November 1998 Refers to 981022 Meeting Re NRC Systematic Assessment of Licensee Performance for Turkey Point Nuclear Plant.List of Attendees & Presentation Slides Encl DD-98-10, Informs That Delivery of Directors Decision DD-98-10,dtd 981021 Was Delayed & Returned to Sender, Rather than Being Forwarded to New Address1998-10-30030 October 1998 Informs That Delivery of Directors Decision DD-98-10,dtd 981021 Was Delayed & Returned to Sender, Rather than Being Forwarded to New Address ML17354B1601998-10-26026 October 1998 Forwards Request for Addl Info Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, for Turkey Point Plant,Units 3 & 4.Target Date for Response Agreed Upon to Be 120 Days from Receipt of RAI ML17354B1481998-09-22022 September 1998 Forwards Insp Repts 50-250/98-09 & 50-251/98-09 on 980727-31 & 0810-14.No Violations Noted ML17354B1111998-09-18018 September 1998 Extends Invitation to Attend as Observer at 981022 Meeting Between NRC & FP&L to Discuss Systematic Assessment of Licensee Performance for Turkey Point ML20154B2531998-09-17017 September 1998 Responds to Stating Intention to Pursue License Renewal Application for Turkey Point,Units 3 & 4.Info Shared by Util Will Be Useful for NRC Resource Planning ML17354B1241998-09-15015 September 1998 Forwards Insp Repts 50-250/98-08 & 50-251/98-08 on 980712-0822.No Violations Noted ML17354B1001998-09-14014 September 1998 Forwards Clarification of 980817 Safety Evaluation of Revised Relief Request 18.Revised Page 5 of Safety Evaluation & Page 6 of Ineel Technical Ltr Rept Reflecting Change of Word Then with Also Encl ML17354B1191998-08-24024 August 1998 Forwards Summary of 980715 Workshop on Operator Licensing Exam Techniques at RB Russell Bldg & Extends Invitation to Attend This Yr Training Managers Conference on 981105 in Atlanta,Ga.Slides Used for Discussions,Encl IR 05000250/19980071998-08-14014 August 1998 Discusses Insp Repts 50-250/98-07 & 50-251/98-07 Completed on 980711.NRC Examined Issue Identified by FPL in 1998, Associated w/1984 Mod Which Affected RHR Sys Pressure Control Relays ML17354B0871998-08-11011 August 1998 Discusses Impact of Commerical Airport at Homestead Air Force Base Site on Safety at Plant.Licensee Requested to Update Info Provided in 980615 Submittal Re Issue ML17354B0811998-08-10010 August 1998 Forwards Insp Repts 50-250/98-07 & 50-251/98-07 on 980531-0711.One Apparent Violation Identified & Being Considered for Escalated EA Re Failure to Adequately Separate non-safety & safety-related Electrical Loads IR 05000250/19980061998-08-10010 August 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/98-06 & 50-251/98-06 Issued on 980625 1999-09-28 |
Inspection Report - Turkey Point - 1989003 | |
---|---|
Assessments |
Text
ACCELERATED I>1+GBUTION DEMONSTIHOy, SYS1Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8905040296 DOC.DATE: 89'/04/24 NOTARIZED: NO DOCKET I IL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION STOHR,J.P.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 890413 ltr informing NRC of steps taken to correct vxolations noted in Insp Rept 50-250/89-03.
DISTRIBUTION CODE:
IE04D COPIES RECEIVED:LTR J ENCL M SIZE:
/
T
) 'Tl NOTES:
R I
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: AEOD/DOA NRR/DRIS/SIB 9A NUDOCS-ABSTRACT RGN2 FILE
COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DRIS/SGB 9D NRR S
B G FILE
COPIES LTTR ENCL EXTERNAL: LPDR NSIC NRC PDR NOIX 'IO ALL "RIDS" RECZPIENIS PIZASE HELP US Io REDUCE WASTE CXWIACT~ DOCUMEÃZ CONIBDL DESKI ROOM Pl-37 (EXT. 20079)
KO ZLI2GZATE YOUR KkfE PRCH DISTRIKTZIGN LISTS FOR DOCUMENIS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
APR 24 ts89 cc:
J.
S.
Odom, Vice President Turkey Point Nuclear Plant J.
E. Cross, Plant Manager Turkey Point Nuclear,'>lant L.
W. Bladow, Plant QA Superintendent K.
W. VanDyne, Regulatory and Compliance Supervisor State of Florida J.'hilip.Stohr, Director Division of Radiation Safety and Safeguards Florida Power and Light Company ATTN:
Mr. W.
F.
Conway Senior'ice President - Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
REPORT NOS. 50-250/89-03 AND 50"251/89"03 Thank you for your response of April 13, 1989, to our Notice of Violation issued on March 15, 1989, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, bcc:
NRR/DRIS/SB Document Control Desk (RIDS IF04),
016 NRC Resident Inspector G.
E. Edison, Project Ma.,=er, Project Directorate II-2, 0>>;ision of Reactor Projects, NRR DRS Technical Assistant
<pOg I Q ATillman:er 04@O/89 ire 04/L /89 S90504029'6 S5'0424 PDR ADOCK 05000250
PDC RI Iji/~
S C'ts"ne
/~/89 lion RCrlenjak 04/A/89
PF
0~~