IR 05000250/1989021
| ML20246J535 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/01/1989 |
| From: | Mcguire D, Tillman A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20246J517 | List: |
| References | |
| 50-250-89-21, 50-251-89-21, NUDOCS 8907170393 | |
| Download: ML20246J535 (2) | |
Text
Mh,. J
'd,~
, // 7
-
-
.
'ly
~~ ~ '
G -~q
~
'
,
ri SAFEGUA39,@,MpRMATION 7.
.
j
'
,
$'
'[
. NUCLEAR REGULAVORY COMMISSION [
'
'
d" p'
j e
,
,
igt, r >
"'c [,
.
. REGloNil
[s'*
.]
'
- g*
({i l101 MARIETTA STREET,N.W.
"
.
,
p.
'*
a,+
,.
y,
- o,
_
g *.y l '
~
j
.
.
'
"
r
g n,
.
! C,'"
'
,
,
f'
.
,i
'
.
'
Report-Nos.:_ 50-250/89-21~and 50-251/89-21
'
Licensee:,. Florida Power and Light. Company 9250 West Flagler Street Miami, FL 33102-c Docke't Nos.: '50-250 and 50-251 License Nos.: DPR-31 and DPR-41
'. Facility.Name: ' Turkey Point 3 and 4
' Inspection Cond LedApril 24-
, 1989 Inspec: tors:
/ 8 /) N
~ Ng U
f-v A. Tillman, y sical Secur~ity Inspector 4) ate / Sign'ed.
'
d Team Members:
W. J. Tobin,1 Senior Physical Security Inspector D. Thomps n,' Physical Security Inspector Approved by:
hs
.Y d / 89 D.
R~. McGuire, Chief T) ate Signed =
Physical. Security Section
.
.
.
Nuclear' Materials Safety and Safeguards ~ Branch Division-of Radiation Safety and Safeguards SUMMARY Scope:
,
- This routine,l unannounced inspection was conducted in the areas of Management Support and Security Program Plans; Protected and Vital Area Physical Barriers,-
LDetection and Assessment. Aids; Protected and Vital Area Access Control 'of Jersonnel, Packages and Vehicles; Alarm Station and Communications; Testing
- Maintenance and Compensatory Measures; Security Training and Qualification,' and
,
Phy:ical t rotection Safeguards Information.
Results:
.
Inspection' results indicate a continuing problem in',the operational effectiveness of the Turkey Poiot 1 Security Program.
The necessity for
- upgrading security systems, associated equipment and f aciliti es, and
' improvement in management and shift-level supervision and communications have been discussed and documented in previous inspection reports. The licensee has
'
responded to these identified program deficiencies with both short and 1 sng term corrective' actions and improvement in some areas has been noted. However,
.
.
pe, onvmt tranernitied bmewith 1l%:%C1 8907170393 890712 m*E"^ * ""# ##
gDR ADOCK 05000250
'
,
.
- ,---
- - - - - - - =
.y-.
--.
'
-
-
- ....
.
2-
[
~
k performance of security personnel continues to be the primary detriment to
~
E improvement ;in the efficiency and effectiveness of the ' security force as b
demonstrated by the ' following' violations of regulatory requirements and Inspector Followup Item.
1.
Violation
.' Failure to control access to a vital area.
(Repeat Violation).
2.
Violation - Security officer attentive / asleep on ' post - two examples.
3.
Inspector Followup Item - Inadequate response to contingency drill.
,
e I
i i
i i ~~,ms-~unam"~a"
~"~n'*"""* "
a
~ n. mn 5,-.
,
enclosures, this document is dcWNJs(Q
-
_ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _. _ _ _. _ _. _. _ _ _. _ _. _ _. _ _. _ _ _ _ _ _
_ _ - _ _ _ _ _ _ _ _ _ - _ - - - _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _
__----.____-______-_-a