Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure1 October 1993PNO-II-93-052:on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure
PNO-II-93-040, on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified25 August 1993PNO-II-93-040:on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified
PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 93061310 June 1993PNO-II-93-025:on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613
PNO-II-92-055C, on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled3 September 1992PNO-II-92-055C:on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled
PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew31 August 1992PNO-II-92-055B:on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew
PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request27 August 1992PNO-II-92-055A:on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request
PNO-II-92-055, on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified24 August 1992PNO-II-92-055:on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified
PNO-II-90-039, on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const23 July 1990PNO-II-90-039:on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const
PNO-II-88-030A, on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False17 May 1988PNO-II-88-030A:on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False
PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed19 April 1988PNO-II-88-027:on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed
PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-815 January 1988PNO-II-88-005:on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8
PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing28 October 1987PNO-II-87-075:on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing
PNO-II-87-074, on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls26 October 1987PNO-II-87-074:on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-II-87-062, on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls29 September 1987PNO-II-87-062:on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls
IR 05000250/198701619 May 1987PNO-II-87-030:updating PNO-II-87-019 & PNO-II-87-019A. Augmented Insp Team Repts 50-250/87-16 & 50-251/87-16 on Boric Acid Leakage & Buildup Problem Issued on 870515.Loss of Offsite Power Test Scheduled for 870520Boric Acid
PNO-II-87-024, on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees9 April 1987PNO-II-87-024:on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees
PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc24 March 1987PNO-II-87-017:media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc
PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp23 March 1987PNO-II-87-019A:on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for InspBoric Acid
PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted20 March 1987PNO-II-87-020:on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted
PNO-II-86-003, on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected8 January 1986PNO-II-86-003:on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected
PNO-II-85-112, on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned25 November 1985PNO-II-85-112:on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned
PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path22 November 1985PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path
PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 85111819 November 1985PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118
PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup21 October 1985PNO-II-85-097:on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup
PNO-II-85-070, utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm23 July 1985PNO-II-85-070:utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm
PNO-II-85-056, on 850517,reactor Tripped.Caused by Loss of Offsite Power Due to Fire Disabling 500-kV Line Near Util Substation.Unusual Event Declared.All Safety Sys Functioned Normally.Power Restored17 May 1985PNO-II-85-056:on 850517,reactor Tripped.Caused by Loss of Offsite Power Due to Fire Disabling 500-kV Line Near Util Substation.Unusual Event Declared.All Safety Sys Functioned Normally.Power Restored
PNO-II-84-069A, update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West11 October 1984PNO-II-84-069A:update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West
PNO-II-84-039, on 840625,10 Gpm Primary Coolant Leak Inside Containment Bldg Caused Slight Increase in Pressure & Containment Radiation Levels.Reactor Placed in Cold Shutdown for Corrective Maint on Root Valve25 June 1984PNO-II-84-039:on 840625,10 Gpm Primary Coolant Leak Inside Containment Bldg Caused Slight Increase in Pressure & Containment Radiation Levels.Reactor Placed in Cold Shutdown for Corrective Maint on Root Valve
PNO-II-83-081, on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads12 October 1983PNO-II-83-081:on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads
PNO-II-82-086, on 820721,while at 100% Power,Reactor Tripped When Reactor Coolant a Tripped.Caused by Momentary Undervoltage Condition on 4160-volt Bus Which Supplies Reactor Coolant Pump Electrical Power21 July 1982PNO-II-82-086:on 820721,while at 100% Power,Reactor Tripped When Reactor Coolant a Tripped.Caused by Momentary Undervoltage Condition on 4160-volt Bus Which Supplies Reactor Coolant Pump Electrical Power
PNO-II-82-077B, updating PNO-82-077A Issued 820713.Unit Remains Shut Down for Insp of Secondary Side of Steam Generators for Presence of Foreign Matl.Efforts Underway to Remove Objects from Generators A,B & C20 July 1982PNO-II-82-077B,updating PNO-82-077A Issued 820713.Unit Remains Shut Down for Insp of Secondary Side of Steam Generators for Presence of Foreign Matl.Efforts Underway to Remove Objects from Generators A,B & C
ML20055B58613 July 1982Updated PNO-II-82-077A:on 820707,eddy Current Exam Revealed No Denting in Steam Generator Tubes.Check Valve Pin from Feedwater Regulating Valve Bypass Line Recovered from Secondary Side of Generator
PNO-II-82-077, on 820707,controlled Shutdown from 100% Power Initiated After Tube Leaks Developed in Steam Generator B. Leakage Rate Remained Below Tech Specs.Insp & Repairs Planned During Cold Shutdown on 8207087 July 1982PNO-II-82-077:on 820707,controlled Shutdown from 100% Power Initiated After Tube Leaks Developed in Steam Generator B. Leakage Rate Remained Below Tech Specs.Insp & Repairs Planned During Cold Shutdown on 820708
PNO-II-82-062, on 820603,two Inspectors Dispatched to Plant to Suppl Resident Staff in Monitoring Operations If Hurricane Hit Plant.Inspectors Equipped W/High Frequency Radio Unit for Communicating During Adverse Weather4 June 1982PNO-II-82-062:on 820603,two Inspectors Dispatched to Plant to Suppl Resident Staff in Monitoring Operations If Hurricane Hit Plant.Inspectors Equipped W/High Frequency Radio Unit for Communicating During Adverse Weather
ML20216J7026 September 1978PNO-78-160:on 780905,3,300 Gallons of Water Overflowed Into Cask Washdown Area & Storm Drain Sys.Cause of Incident Was Failure of Operator to Secure SFP Recirculation Pump After Making Valve Lineup to Equalize Canal & SFP Levels
ML20249A53918 July 1978PNS-78-035:on 780718,cardboard Box Containing an Apparent Explosive Device Was Found in Hot Machine Shop on Ground Floor of Auxiliary Bldg.Licensee Prepared to Initiate Controlled Shutdown of Both Units as Precaution
ML20248L01314 February 1978PNO-78-031:on 780214,unit Shutdown Commenced at 1:00pm Due to Apparent SG Tube Leak of 20.8 Gallons Per Hour.Unit Will Be Placed in Cold Shutdown Condition,Portion of RCS Will Be Drained & SG Will Be Tested to Identify Leaky Tubes
ML20151X53228 June 1977PNO-77-116:on 770625,notified That 10 Addl SG Tube Explosive Plugs Missing from Cold Leg Side of 4B Sg.Licensee Conducted Preliminary Investigation of 7 of Tubes & Plugs Were Not Inside.Plans Being Formulated for More Extensive Search
ML20151U67716 May 1977PNO-77-085:on 770516,TPS Unit 3 Reactor Tripped When RPS Received Signal That 3C Pump Had Tripped.Low Grid Voltage Caused Fossil Units to Trip.Slp Unit 1 Also Affected by Voltage Loss.Power Restored to Sys Grid from Fossil Units
ML20249A90421 March 1977PNS-77-009:on 770322,FP&L Maint Employee at Plant Arrested for Possession of Arms,Explosives & Narcotics.Fp&L Representatives Withdrew Security Badge to Assure That Individual Is Not Permitted Entry Into Plant
ML20249A8622 March 1977PNS-77-006:on 770225,two News Reporters Decided to Check Guard Alertness at Plant Following Announcement That Security Measures Would Be Increased at Nuclear Facilities. Reporters Got in & Out of Areas Before Seeing Guard
ML20236F33813 August 1976PNS-76-040:on 760812,pretrial Hearing Involving R Otero in Us District,Court,Jacksonville,Fl Revealed That Informants Had Told FBI That Otero Tried in Oct 1975 to Get Explosives from anti-Castro Terrorist Group to Use at Plant
ML20236F55423 April 1976PNS-76-014:on 760423,Radio Station Wftl,Ft Lauderdale,Fl, Reported to Util That Message Received by Radio Station,That Hidden Devices Placed at Key Areas of Turkey Point & Port Everglades Generating Plants.No Unidentified Objects Found
ML20249B22815 March 1976PNO-76-041:during Wk of 760308,reporter Contacted Region Re Proposed Enlargement of Sf Storage Capacity at Plant Site & Previous Repts of Water Leakage from Sf Pits.Details of Leak Submitted
ML20236F4408 March 1976PNS-76-010:on 760309,message Found in Back Door of Miami Herald,Broward County Ofc Stating That Hidden Devices Had Been Placed at Key Areas of Turkey Point & Everglades Generating Plants.No Unidentified Objects Were Located
ML20249B08010 February 1976PNO-76-022:on 760208,unmarked Twin Engine Cessna Airplane, Out of Fuel Crash Landed Approx 300 Yards South of Turkey Point Plants.Pilot Reported to Be in Custody of Police
ML20236U01515 April 1975PN-75-010:on 750414,Region II Notified by Licensee That Unplanned Release of Radioactive Liquid Occurred on 750413. No Apparent Threat to Health & Safety of Public Resulted. About 7400 Gallons of Water from SFP Released